i
Aparna Constructions and Estates
Filter interviews by
I applied via Walk-in and was interviewed in Feb 2022. There were 3 interview rounds.
Bricks are wet during brick work to prevent them from absorbing water from the mortar too quickly.
Wet bricks prevent the mortar from drying out too quickly, which can weaken the bond between the bricks and the mortar.
Wet bricks also help to prevent efflorescence, a white powdery substance that can form on the surface of bricks due to the migration of salts.
Bricks should be dampened, not soaked, before use.
The amount of...
The thickness of cement mortar in brickwork varies depending on the type of brick and the purpose of the wall.
For load-bearing walls, the thickness of the mortar should be 10mm for horizontal joints and 8mm for vertical joints.
For non-load-bearing walls, the thickness of the mortar can be reduced to 6mm for horizontal joints and 4mm for vertical joints.
The type of brick used can also affect the thickness of the mortar....
Chemical names of water proofing
Acrylic polymers
Bituminous coatings
Silicones
Polyurethane
Epoxy resins
Ceramic or porcelain tiles are commonly used in toilets due to their durability and water resistance.
Ceramic or porcelain tiles are commonly used in toilets
These tiles are durable and water-resistant
Other options include natural stone tiles and vinyl tiles
I expect a competitive salary based on my qualifications and experience.
Research the average salary range for Site Engineers in your area
Consider your level of experience and expertise
Factor in any additional certifications or specialized skills you possess
Be prepared to negotiate and discuss benefits package
Example: Based on my research, the average salary range for Site Engineers in this area is $60,000 to $80,000. C...
I worked as a Site Engineer at XYZ Construction Company.
Managed and supervised construction projects on-site.
Ensured compliance with building codes and regulations.
Collaborated with architects, contractors, and subcontractors.
Monitored project progress and resolved any issues that arose.
Prepared and maintained project documentation, including reports and drawings.
I was interviewed in Jan 2025.
I have over 10 years of experience in senior engineer QA/QC roles in the construction industry.
Managed quality control processes for construction projects
Performed inspections and audits to ensure compliance with regulations and standards
Implemented quality improvement initiatives to enhance project outcomes
Collaborated with project teams to address quality issues and drive continuous improvement
Mivan sequence involves setting up formwork for concrete construction. Tests for concrete in Mivan include slump test, cube test, and temperature monitoring.
Mivan sequence involves setting up formwork quickly and efficiently
Tests for concrete in Mivan include slump test to check workability
Cube test is done to assess the strength of concrete
Temperature monitoring is important to ensure proper curing
I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.
Responsible for managing costs and budgets for engineering projects, preparing estimates, analyzing contracts, and ensuring compliance with regulations.
Prepare cost estimates for engineering projects
Analyze contracts and negotiate with suppliers
Monitor project budgets and expenses
Ensure compliance with regulations and quality standards
Collaborate with project managers and engineers
Aparna Constructions and Estates interview questions for popular designations
I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.
Waterproofing in a toilet room is essential to prevent water damage and maintain structural integrity.
Waterproofing materials such as membranes, sealants, and coatings are used to protect surfaces from water penetration.
Proper installation of waterproofing systems is crucial to ensure long-term effectiveness.
Regular maintenance and inspections are necessary to identify and address any issues with waterproofing.
Examples...
The weight of 1 meter length depends on the material being measured.
The weight of 1 meter length can vary depending on the material, such as steel, aluminum, wood, etc.
To calculate the weight, you need to know the density of the material.
For example, the weight of 1 meter length of steel would be different from 1 meter length of wood.
The number of bricks in 1m^3 depends on the size of the bricks being used.
The number of bricks in 1m^3 will vary based on the size of the bricks.
Calculate the volume of a single brick and then divide 1m^3 by that volume to get the number of bricks.
For example, if a brick is 0.2m x 0.1m x 0.05m, its volume would be 0.001m^3. Therefore, 1m^3 would contain 1000 bricks.
Get interview-ready with Top Aparna Constructions and Estates Interview Questions
I applied via Campus Placement and was interviewed in Apr 2024. There were 2 interview rounds.
General questions on Excel and Gantt charts
I applied via Referral and was interviewed in Nov 2023. There were 5 interview rounds.
I applied via Referral
I applied via Walk-in and was interviewed in Oct 2023. There were 3 interview rounds.
Top trending discussions
The duration of Aparna Constructions and Estates interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 91 interviews
Interview experience
based on 824 reviews
Rating in categories
Assistant Engineer
194
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
Junior Engineer
105
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
Senior Engineer
97
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
Engineer
86
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
Assistant Engineer - Civil
83
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
Prestige Group
Sobha
Godrej Properties
DLF