i
Aparna Constructions and Estates
Filter interviews by
Clear (1)
I applied via Walk-in and was interviewed before Jul 2022. There were 3 interview rounds.
The store process refers to the set of procedures and protocols followed in the store for efficient operations.
The store process includes receiving shipments, stocking shelves, assisting customers, and managing inventory.
It also involves cash handling, processing returns, and maintaining store cleanliness.
Following the store process ensures smooth operations and customer satisfaction.
For example, a store process may in...
SAP MM (Materials Management) is responsible for managing procurement activities, inventory management, and material valuation.
Responsible for procurement of materials and services
Inventory management to ensure availability of materials
Material valuation to determine the value of materials in stock
Integration with other SAP modules like SD and FI for seamless business processes
T codes are shortcuts in SAP to access specific functions or reports.
T code for Sales Order Report: VA05
T code for Purchase Order Report: ME2N
T code for Material Stock Report: MB52
Site to site transfer of materials in SAP involves creating a stock transport order, posting goods issue at the sending site, and goods receipt at the receiving site.
Create a stock transport order in SAP specifying the sending and receiving plant/storage location
Post goods issue at the sending site to reduce stock levels
Goods are physically transferred to the receiving site
Post goods receipt at the receiving site to in
LIFO stands for Last In, First Out and FIFO stands for First In, First Out. They are methods used for inventory management.
LIFO means that the last items added to inventory are the first to be sold or used
FIFO means that the first items added to inventory are the first to be sold or used
LIFO is often used in industries where products have a short shelf life, like groceries
FIFO is commonly used in industries where produ
5S, ABC & XYZ analysis are inventory management techniques used to improve efficiency and reduce waste.
5S is a method for organizing a workplace to improve efficiency and safety by sorting, setting in order, shining, standardizing, and sustaining.
ABC analysis categorizes inventory items into three groups based on their importance, with A being the most important and C being the least important.
XYZ analysis classifies i...
Handled residential projects worth $X and sold Y units.
Managed residential projects worth $X and sold Y units.
Successfully handled X number of residential projects with a total value of $Y.
Sold Y units in residential projects worth $X.
Managed and sold units in residential projects worth $X and Y respectively.
As a sales person, I can add value to Aparna Constructions by utilizing my diverse experience in sales and marketing.
I have experience in developing and implementing successful sales strategies.
I can leverage my network and relationships to generate leads and increase sales.
I have a track record of exceeding sales targets and delivering results.
I am skilled in customer relationship management and can ensure customer sa...
I applied via Naukri.com and was interviewed before Mar 2020. There were 6 interview rounds.
Top trending discussions
posted on 29 Aug 2023
I applied via Naukri.com and was interviewed in Mar 2023. There were 2 interview rounds.
RCC Mivon shuttering experience involves using reinforced concrete construction techniques for formwork and scaffolding.
Experience in setting up formwork and scaffolding for reinforced concrete structures
Knowledge of RCC Mivon shuttering techniques and materials
Ability to interpret construction drawings and plans for RCC Mivon shuttering
Experience in coordinating with construction teams and contractors for RCC Mivon sh
I manage projects by setting clear goals, creating a detailed plan, delegating tasks effectively, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed project plan outlining tasks, timelines, and resources
Delegate tasks to team members based on their strengths and expertise
Monitor progress regularly and address any issues or delays promptly
Adjust the project plan
posted on 6 Aug 2023
I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.
posted on 20 Jun 2024
I applied via Referral and was interviewed in Feb 2021. There were 3 interview rounds.
Some of the top questions asked at the Aparna Constructions and Estates Assistant Manager interview -
based on 2 interviews
Interview experience
based on 12 reviews
Rating in categories
Hyderabad / Secunderabad
8-13 Yrs
₹ 5.55-12.684 LPA
Assistant Engineer
194
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
105
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
97
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
86
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer - Civil
83
salaries
| ₹0 L/yr - ₹0 L/yr |
Prestige Group
Sobha
Godrej Properties
DLF