Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Lodha Group Team. If you also belong to the team, you can get access from here

Lodha Group Verified Tick

Compare button icon Compare button icon Compare
4.0

based on 1.7k Reviews

Filter interviews by

Lodha Group Interview Questions, Process, and Tips

Updated 9 Jan 2025

Top Lodha Group Interview Questions and Answers

View all 70 questions

Lodha Group Interview Experiences

Popular Designations

122 interviews found

Fire Officer Interview Questions & Answers

user image Anonymous

posted on 1 Jan 2025

Interview experience
2
Poor
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in

Round 1 - Technical 

(2 Questions)

  • Q1. Fire protection and fire system week check team training
  • Q2. Monthly and weekly report check
Round 2 - Assignment 

Fire and production department

Round 3 - HR 

(2 Questions)

  • Q1. Company Protection and Company Employee Security
  • Q2. There should be no problem in company benefit and company
Round 4 - HR 

(2 Questions)

  • Q1. CompanWhat can we do for the company and the benefits of the company
  • Q2. Company me kitne Data of how many employees are there in the company

Fire Officer Interview Questions asked at other Companies

Q1. What' is tha fire and how many extinguiser of fire fighting
View answer (1)

Site engineer ( construction management) Interview Questions & Answers

user image jasimuddin sheikh

posted on 23 Dec 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(6 Questions)

  • Q1. Could you please explain the 7-days slab cycle for Aluform shuttering?
  • Ans. 

    The 7-days slab cycle for Aluform shuttering involves the process of casting, curing, and stripping the concrete slab within a 7-day period.

    • Day 1: Setting up the Aluform shuttering and pouring the concrete mixture into the formwork.

    • Day 2-6: Allowing the concrete to cure and gain strength within the shuttering.

    • Day 7: Stripping the Aluform shuttering to reveal the hardened concrete slab.

    • The 7-days slab cycle is crucial f...

  • Answered by AI
  • Q2. What is rolling margin?
  • Ans. 

    Rolling margin is the difference between the actual cost and the estimated cost of a project at a specific point in time.

    • Rolling margin helps in tracking the financial performance of a project.

    • It is calculated by subtracting the estimated cost from the actual cost.

    • A positive rolling margin indicates that the project is under budget, while a negative rolling margin indicates that the project is over budget.

  • Answered by AI
  • Q3. What is the sequence of activities involved in the construction of a high-rise building?
  • Ans. 

    The sequence of activities involved in the construction of a high-rise building includes site preparation, foundation work, structural framing, exterior finishing, interior finishing, and final inspections.

    • Site preparation involves clearing the land, leveling the ground, and setting up temporary facilities.

    • Foundation work includes excavation, laying the foundation, and waterproofing.

    • Structural framing involves erecting...

  • Answered by AI
  • Q4. What are effective strategies for balancing work and personal life?
  • Ans. 

    Effective strategies for balancing work and personal life include setting boundaries, prioritizing tasks, delegating responsibilities, and practicing self-care.

    • Set boundaries between work and personal life to avoid burnout

    • Prioritize tasks based on importance and deadlines

    • Delegate responsibilities to team members to lighten workload

    • Practice self-care activities such as exercise, meditation, and spending time with loved

  • Answered by AI
  • Q5. Productivity of fitters and carpenters?
  • Ans. 

    Productivity of fitters and carpenters can vary based on factors like skill level, experience, tools/equipment availability, and project complexity.

    • Productivity of fitters and carpenters can be influenced by their skill level and experience.

    • Availability of tools and equipment can impact the efficiency of fitters and carpenters.

    • The complexity of the construction project can also affect the productivity of fitters and ca...

  • Answered by AI
  • Q6. How manage senior or stakeholders??
  • Ans. 

    Managing senior stakeholders involves effective communication, building relationships, understanding their needs and expectations, and providing regular updates.

    • Establish clear communication channels with senior stakeholders to keep them informed about project progress

    • Listen to their feedback and address any concerns or issues promptly

    • Build strong relationships based on trust and mutual respect

    • Understand their prioriti...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Campus Placement and was interviewed in Oct 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

Questions where divided into 5 modules such as Aptitude, Reasoning, Psychometric test, Sales & English

Round 2 - HR 

(4 Questions)

  • Q1. Tell me about yourself
  • Q2. Tell me about your SIP
  • Q3. Tell me about what are your hobbies
  • Q4. Tell me about your family background
  • Ans. 

    I come from a close-knit family with a diverse background, including professionals in various fields.

    • My parents are both doctors, so I grew up with a strong emphasis on education and hard work.

    • I have a younger sister who is studying to become a lawyer, adding to the diversity of our family's professions.

    • Family gatherings are always lively and filled with discussions about current events and advancements in our respecti

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. Why do you want to work with our company
  • Ans. 

    I am impressed by your company's reputation for innovation and commitment to sustainability.

    • I admire your company's track record of successful projects and partnerships.

    • I am excited about the opportunity to contribute to a team that values creativity and collaboration.

    • Your company's focus on sustainability aligns with my personal values and career goals.

  • Answered by AI
  • Q2. Convince me why do you want to do Sales

Sourcing Manager Interview Questions asked at other Companies

Q1. Which category you have command? (Laundry, Oral Care etc)
View answer (1)

Analytics Manager Interview Questions & Answers

user image Vivek Sharma

posted on 24 Dec 2024

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected
Round 1 - Assignment 

Data science related

Round 2 - Case Study 

Related to ds and ml algorithm

Round 3 - One-on-one 

(1 Question)

  • Q1. With Higher manager
Round 4 - HR 

(1 Question)

  • Q1. General hr questions

Analytics Manager Interview Questions asked at other Companies

Q1. How do you go about setting up data strategy for a new lending business?
View answer (2)

Lodha Group interview questions for popular designations

 Senior Supervisor

 (4)

 Audit Executive

 (3)

 Civil Site Engineer

 (3)

 Manager

 (3)

 Sales Executive

 (3)

 Architect

 (2)

 Assistant General Manager

 (2)

 Civil Engineer

 (2)

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Explain mivan slab cycle
  • Ans. 

    Mivan slab cycle is a construction technique using aluminum formwork for casting slabs in a repetitive cycle.

    • Mivan slab cycle involves setting up aluminum formwork panels for casting slabs.

    • The cycle includes fixing reinforcement, pouring concrete, curing, and then dismantling the formwork for reuse.

    • This method is efficient, cost-effective, and results in high-quality finishes.

    • Mivan slab cycle reduces construction time ...

  • Answered by AI
  • Q2. What will you ensure before concreting
  • Ans. 

    Before concreting, ensure proper formwork, reinforcement placement, concrete mix design, and weather conditions.

    • Check formwork for proper alignment and stability

    • Ensure reinforcement bars are correctly placed as per design

    • Verify concrete mix design meets project specifications

    • Monitor weather conditions to prevent issues like rain or extreme temperatures affecting the concrete

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Expected salary if selected
  • Ans. 

    My expected salary is based on my qualifications, experience, and the industry standards.

    • I am looking for a competitive salary that reflects my skills and experience in the civil engineering field.

    • I have researched the average salary range for Civil Site Engineers in this region and industry.

    • I am open to negotiation based on the overall compensation package offered by the company.

    • I am looking for a salary that aligns w...

  • Answered by AI

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (63)

Get interview-ready with Top Lodha Group Interview Questions

DGM Revenue Strategy Interview Questions & Answers

user image Anonymous

posted on 21 Sep 2024

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. CV Based Round - Questions on my previous projects
Round 2 - One-on-one 

(1 Question)

  • Q1. CV based - Previous projects details
Round 3 - HR 

(1 Question)

  • Q1. HR Round - Salary negotiation round

Jobs at Lodha Group

View all
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. About your self
  • Q2. Which field in complete your education
  • Ans. 

    I completed my education in the field of Computer Science.

    • Bachelor's degree in Computer Science

    • Courses in programming languages like Java, Python, C++

    • Specialization in data management and analysis

    • Internship at a software development company

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. About excel besic knowledge
  • Q2. Basic formula sum if count vlookup
  • Ans. 

    The question is asking about basic formulas like SUM, IF, COUNT, and VLOOKUP commonly used in data entry operations.

    • Use SUM formula to add up a range of cells

    • IF formula to perform a logical test and return one value if the condition is met, and another value if it is not

    • COUNT formula to count the number of cells that contain numbers

    • VLOOKUP formula to search for a value in the first column of a table and return a value

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I always best performance

I will give u 100 percent

Data Entry Operator Executive Interview Questions asked at other Companies

Q1. Which field in complete your education
View answer (1)

Bath room sealing breaking down due to water pressure Interview Questions & Answers

user image amandeep sohal

posted on 21 Aug 2024

Interview experience
1
Bad
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
No response

I applied via Walk-in and was interviewed in Jul 2024. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. When is lodha group solveing this issue?
  • Ans. 

    The issue with bathroom sealing breaking down due to water pressure is being addressed by Lodha Group.

    • Lodha Group is actively working on solving the issue with bathroom sealing breaking down due to water pressure.

    • They are likely investigating the root cause of the problem and implementing necessary fixes.

    • It is important for them to prioritize the safety and comfort of their residents by resolving this issue promptly.

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. When is lodha group solveing technical issue of water pressure?
  • Ans. 

    The Lodha Group is actively working to solve the technical issue of water pressure in the bathroom sealing.

    • Lodha Group has identified the issue with water pressure affecting bathroom sealing

    • They are currently working on implementing technical solutions to address the problem

    • Regular maintenance and monitoring of water pressure levels are being conducted to prevent future breakdowns

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I will share my advice only if I am profitable

Product Designer Interview Questions & Answers

user image Madangopal Neltoor

posted on 1 Dec 2024

Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Asked about UX Process
Round 2 - Technical 

(1 Question)

  • Q1. Asked about UX process

Product Designer Interview Questions asked at other Companies

Q1. What are other things you do apart from designing?
View answer (1)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Total no of experience
  • Ans. 

    I have 5 years of experience in management roles.

    • 5 years of experience in management roles

    • Experience includes leading teams, setting goals, and achieving targets

    • Previous roles include Assistant Manager at Company X and Team Leader at Company Y

  • Answered by AI
  • Q2. Knowledge of current market rates
Round 2 - HR 

(2 Questions)

  • Q1. No of exp having
  • Q2. Notice period ctc date of joining
  • Ans. 

    The notice period, current total compensation, and date of availability to join are important factors to consider when discussing a new job opportunity.

    • Notice period refers to the amount of time required to be given to the current employer before leaving the job.

    • CTC (Cost to Company) is the total compensation package offered by the employer, including salary, benefits, and bonuses.

    • Date of joining is the availability da...

  • Answered by AI

Assistant Manager Interview Questions asked at other Companies

Q1. You are Handling cash operations then how you manage operations with sales ?
View answer (86)

Lodha Group Interview FAQs

How many rounds are there in Lodha Group interview?
Lodha Group interview process usually has 2-3 rounds. The most common rounds in the Lodha Group interview process are One-on-one Round, HR and Technical.
How to prepare for Lodha Group interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Lodha Group. The most common topics and skills that interviewers at Lodha Group expect are Sales, Channel Partners, SAP, Channel Sales and Business Development.
What are the top questions asked in Lodha Group interview?

Some of the top questions asked at the Lodha Group interview -

  1. Describe in general, the various stages in construction of residential building...read more
  2. What are handover process to civil or facillit...read more
  3. What is cost per sq ft of grade A warehouse. Civil, Pre engineered Building,ele...read more
How long is the Lodha Group interview process?

The duration of Lodha Group interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Lodha Group Interview Process

based on 110 interviews

Interview experience

4.2
  
Good
View more

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 124 Interviews
DLF Interview Questions
4.0
 • 72 Interviews
Prestige Group Interview Questions
4.3
 • 35 Interviews
Brigade Group Interview Questions
4.2
 • 32 Interviews
Oberoi Realty Interview Questions
4.1
 • 17 Interviews
Piramal Realty Interview Questions
3.8
 • 8 Interviews
View all

Lodha Group Reviews and Ratings

based on 1.7k reviews

4.0/5

Rating in categories

4.0

Skill development

3.9

Work-life balance

3.9

Salary

3.9

Job security

3.9

Company culture

3.6

Promotions

3.8

Work satisfaction

Explore 1.7k Reviews and Ratings
Finance Controller

Mumbai

16-22 Yrs

Not Disclosed

Billing Engineer

Mumbai

3-8 Yrs

₹ 4-7 LPA

Facade Execution

Mumbai

8-13 Yrs

₹ 8-15 LPA

Explore more jobs
Associate Manager
407 salaries
unlock blur

₹5.4 L/yr - ₹12.1 L/yr

Deputy Manager
323 salaries
unlock blur

₹7.2 L/yr - ₹16.8 L/yr

Manager
215 salaries
unlock blur

₹9 L/yr - ₹22 L/yr

Sales Executive
215 salaries
unlock blur

₹2 L/yr - ₹11.5 L/yr

Senior Executive
211 salaries
unlock blur

₹3.9 L/yr - ₹9.5 L/yr

Explore more salaries
Compare Lodha Group with

DLF

4.0
Compare

Godrej Properties

3.7
Compare

Sobha

3.9
Compare

Prestige Group

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview