I applied via Walk-in and was interviewed in Feb 2024. There were 3 interview rounds.
Building and roads related
I applied via Campus Placement and was interviewed before Jan 2021. There were 4 interview rounds.
The stages in construction of residential buildings include planning, design, site preparation, foundation, framing, utilities, interior and exterior finishes, and final inspection.
Planning: Determine the project scope, budget, and timeline.
Design: Create architectural and structural plans.
Site preparation: Clear the land and prepare it for construction.
Foundation: Construct the base of the building.
Framing: Build the ...
Structural engineering, transportation engineering, and geotechnical engineering
Structural engineering: designing and analyzing structures such as buildings, bridges, and dams
Transportation engineering: planning and designing transportation systems, including roads, highways, and airports
Geotechnical engineering: studying soil and rock mechanics to ensure the stability of structures and foundations
Stress is the force per unit area that a material experiences when subjected to an external load.
Stress is a measure of the internal forces within a material
It is calculated as force per unit area
Stress can cause deformation or failure of a material
Example: A bridge under heavy traffic experiences stress due to the weight of the vehicles
Example: A metal rod being pulled apart by two opposing forces experiences stress
Top trending discussions
I applied via Referral
I appeared for an interview before Mar 2024, where I was asked the following questions.
posted on 19 Mar 2025
I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.
A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.
Shunt relay is connected in parallel with the main circuit of the ACB.
It detects overcurrents and activates to divert the excess current through a shunt path.
This helps in protecting the main circuit from damage due to overcurrents.
Shunt relays are commonly used in Air Circuit Breakers (ACBs...
CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.
CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.
It is often required in HVAC projects to ensure quality and compliance.
CoC may include details such as product specifications, testing results, and manufacturer information.
Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.
Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.
Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.
BOD is a ...
A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.
Monitors voltage levels in electrical systems
Triggers alarm or protective action if voltage exceeds or falls below set threshold
Used to protect equipment from damage due to voltage fluctuations
WTP plant works on the principle of physical and chemical processes to remove impurities from water.
Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.
Coagulation involves adding chemicals to water to make impurities clump together.
Flocculation helps in forming larger particles called floc for easier removal.
Sedimentation allows the floc to sett...
I provide daily and monthly reports on project progress, issues, and key metrics to track performance.
Daily reports include updates on tasks completed, challenges faced, and plans for the next day.
Monthly reports summarize overall progress, budget status, and any potential risks or delays.
Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...
posted on 2 Dec 2024
based on 1 interview
Interview experience
based on 8 reviews
Rating in categories
Associate Manager
369
salaries
| ₹5.4 L/yr - ₹13 L/yr |
Deputy Manager
323
salaries
| ₹6.5 L/yr - ₹16.6 L/yr |
Manager
221
salaries
| ₹9 L/yr - ₹24 L/yr |
Sales Executive
219
salaries
| ₹2 L/yr - ₹11 L/yr |
Senior Executive
206
salaries
| ₹3.3 L/yr - ₹9.5 L/yr |
JLL
CBRE
NoBroker
Cushman & Wakefield