Project Manager Civil
40+ Project Manager Civil Interview Questions and Answers
Q1. Tell me about Industrial& Turnkey Projects,Buildings Construction& Bridge Construction& Effectiveness of Flyovers
Industrial & turnkey projects, buildings construction, bridge construction, and effectiveness of flyovers
Industrial and turnkey projects involve the construction of large-scale industrial facilities, such as factories or power plants, where the project manager oversees the entire process from planning to execution.
Buildings construction refers to the construction of various types of buildings, including residential, commercial, and institutional structures. The project manage...read more
Q2. what is a Responsibility of Civil Engineer in Construction& Designing
The responsibility of a civil engineer in construction and designing is to plan, design, and oversee the construction of infrastructure projects.
Planning and designing infrastructure projects
Ensuring compliance with building codes and regulations
Preparing cost estimates and budgets
Supervising construction activities
Collaborating with architects, contractors, and other professionals
Performing site inspections and quality control
Managing project timelines and resources
Resolving...read more
Project Manager Civil Interview Questions and Answers for Freshers
Q3. Site Execution methods, what is your role. Which methods adopt for work completion in stipulated time with quality
As a Project Manager Civil, my role in site execution methods is to oversee and coordinate the implementation of construction plans to ensure work completion within the specified time frame and with high quality.
Coordinate with subcontractors and construction teams to ensure smooth execution of work
Regularly inspect the site to monitor progress and quality of work
Implement efficient project management techniques such as critical path method and lean construction principles
Res...read more
Q4. Which type of software you are used In work?
I have used various types of software in my work as a Project Manager Civil.
Project management software such as Microsoft Project or Primavera P6
Design software like AutoCAD or Revit for creating and editing civil engineering drawings
Collaboration and communication tools like Microsoft Teams or Slack for team coordination
Cost estimation software like CostX or Candy for budgeting and cost control
Document management systems like SharePoint or Google Drive for organizing project...read more
Q5. How much pressure handle for completion of projects ?
As a project manager, I am accustomed to handling high levels of pressure to ensure timely completion of projects.
I prioritize tasks and set realistic deadlines to avoid last-minute rush.
I communicate effectively with team members to ensure everyone is on the same page.
I am proactive in identifying potential roadblocks and finding solutions to overcome them.
I maintain a positive attitude and motivate my team to stay focused and committed.
Examples: Successfully completed a con...read more
Q6. How do you plan for minimum cost and maximum out put.
To plan for minimum cost and maximum output, one needs to focus on efficient resource allocation and effective risk management.
Conduct a thorough analysis of the project requirements and identify the critical path
Develop a detailed project plan with clear timelines and milestones
Identify potential risks and develop contingency plans to mitigate them
Optimize resource allocation to ensure maximum efficiency and productivity
Regularly monitor and evaluate project progress to iden...read more
Share interview questions and help millions of jobseekers 🌟
Q7. Cement consumption for one cum concrete using batchingplant
The cement consumption for one cubic meter of concrete using a batching plant depends on the mix design and the desired strength of the concrete.
Cement consumption is typically measured in kilograms per cubic meter (kg/m³) of concrete.
The mix design specifies the proportions of cement, aggregates, and water in the concrete.
The desired strength of the concrete determines the amount of cement required.
The cement consumption can vary based on factors such as the type of cement, ...read more
Q8. By which method construction project will completed in time & financial budget
Construction projects can be completed on time and within budget by effective planning, scheduling, monitoring, and controlling of resources.
Develop a detailed project plan outlining tasks, timelines, and resource requirements.
Regularly monitor progress against the plan and make adjustments as needed.
Implement effective communication and collaboration among team members and stakeholders.
Utilize project management tools and software to track progress and manage resources effic...read more
Project Manager Civil Jobs
Q9. How you will solve any local issues?
I will solve local issues by conducting thorough research, collaborating with stakeholders, and implementing effective strategies.
Conducting research to understand the root causes of the local issues
Collaborating with local authorities, community members, and experts to gather insights and perspectives
Developing and implementing strategies that address the identified issues
Monitoring and evaluating the effectiveness of the implemented solutions
Adapting and adjusting strategie...read more
Q10. Tell me about Standard Cube Size
Standard cube size refers to the predetermined dimensions of a cube used in construction and engineering projects.
Standard cube sizes are commonly used in the construction industry for estimating material quantities and planning.
The dimensions of a standard cube can vary depending on the specific project requirements.
For example, in the context of concrete blocks, a standard cube size may be 8 inches by 8 inches by 16 inches.
These dimensions are used to calculate the number o...read more
Q11. What is the Size of Burnt Clay Bricks
The size of burnt clay bricks varies depending on the region and type of brick.
Standard size of burnt clay bricks is 190mm x 90mm x 90mm.
In some regions, the size may be slightly different, such as 200mm x 100mm x 100mm.
Bricks used for special purposes like arches or decorative work may have different sizes and shapes.
The size of bricks can also vary based on the manufacturing process and the specific requirements of the project.
Q12. Formula to Calculate 1mtr Length of Steel Quantity
The formula to calculate the quantity of steel for 1m length depends on the type of steel used and its dimensions.
To calculate the steel quantity, you need to know the dimensions of the steel, such as its diameter or cross-sectional area.
The formula may vary depending on the shape of the steel, whether it is round, square, or rectangular.
For example, to calculate the quantity of round steel, you can use the formula: Quantity = π * (diameter/2)^2 * length, where π is approxima...read more
Q13. How to make bar bending scedual.
To make a bar bending schedule, follow these steps:
Determine the required reinforcement for each structural element
Calculate the total length of each type of reinforcement bar needed
Prepare a detailed list of reinforcement bars with their dimensions and quantities
Organize the schedule based on the construction sequence and location
Include additional information such as bar marks, bending details, and delivery dates
Q14. Quantity take of for excavation of two footings
To calculate quantity takeoff for excavation of two footings, we need to consider the dimensions and depth of the footings.
Determine the length, width, and depth of each footing
Calculate the volume of each footing using the formula: volume = length x width x depth
Add the volumes of both footings to get the total quantity takeoff for excavation
Consider any additional factors such as soil type and excavation method that may affect the quantity takeoff
Q15. Material consumption, what is future endeavours
Future endeavours in material consumption involve implementing sustainable practices, reducing waste, and optimizing resource usage.
Implementing sustainable material sourcing practices
Reducing waste through efficient project planning and execution
Optimizing resource usage to minimize material consumption
Exploring alternative materials with lower environmental impact
Q16. Explain about the various stages of construction of the foundation of building.
The various stages of construction of the foundation of a building include site preparation, excavation, foundation design, footing construction, and foundation pouring.
Site preparation involves clearing the area and leveling the ground for construction.
Excavation is the process of digging a hole in the ground to create space for the foundation.
Foundation design is crucial to ensure the building's stability and load-bearing capacity.
Footing construction involves pouring concr...read more
Q17. Type of steel used in construction
Various types of steel are used in construction, including carbon steel, stainless steel, and high-strength low-alloy steel.
Carbon steel is commonly used in construction due to its strength and affordability.
Stainless steel is used in areas where corrosion resistance is required, such as in coastal regions or chemical plants.
High-strength low-alloy steel (HSLA) is used in structures that require higher strength and reduced weight, such as bridges and high-rise buildings.
Q18. How much is the cost of steel, cement etc
The cost of steel and cement varies depending on factors such as location, quality, and quantity.
Cost of steel and cement can vary based on market conditions and location
Quality of steel and cement can also impact the cost
Quantity needed for the project will also affect the overall cost
Q19. What will be the Design mix for Concrete .
The design mix for concrete is the proportion of various ingredients like cement, sand, aggregates, and water to achieve the desired strength and durability.
Design mix is determined based on the required strength and durability of the concrete
It involves selecting the right proportions of cement, sand, aggregates, and water
Various factors like type of construction, exposure conditions, and desired workability influence the design mix
Example: For a high-strength concrete, the ...read more
Q20. PH stages and where it starts
The PH stages in project management refer to the initiation, planning, execution, monitoring, and closure phases.
Initiation: Defining the project's objectives, scope, and stakeholders.
Planning: Developing a detailed project plan, including timelines, resources, and budgets.
Execution: Implementing the project plan and managing resources.
Monitoring: Tracking project progress, identifying risks, and making necessary adjustments.
Closure: Completing all project activities, evaluat...read more
Q21. What is Costing of villa per sqft?
Costing of a villa per sqft is calculated by dividing the total cost of construction by the total square footage of the villa.
Calculate total cost of construction including materials, labor, permits, etc.
Determine total square footage of the villa including all floors and rooms.
Divide total cost by total square footage to get cost per sqft.
Example: Total cost of construction = $500,000, Total sqft of villa = 3000, Cost per sqft = $500,000 / 3000 = $166.67
Q22. Qty of concrete and steel per CUM
The quantity of concrete and steel per cubic meter varies depending on the design and specifications of the project.
The amount of concrete and steel per cubic meter is determined by the structural design and specifications of the project.
The mix design of concrete and grade of steel used also affect the quantity per cubic meter.
For example, a project may require 0.4 cubic meters of concrete and 100 kg of steel per cubic meter.
The quantity of concrete and steel per cubic meter...read more
Q23. Why rings are bent at 135 degrees
Rings are bent at 135 degrees to provide structural stability and prevent deformation under pressure.
Bending rings at 135 degrees distributes stress evenly along the structure.
This angle helps prevent buckling and deformation of the ring under pressure.
The 135-degree bend also allows for easier installation and maintenance of the structure.
Q24. Where do the crack develop in the beam
Cracks in beams typically develop at locations of high stress concentrations or due to external factors like corrosion.
Cracks can develop at the supports of the beam where the bending moment is highest.
Cracks can also form at locations where there are changes in cross-section or material properties.
External factors like corrosion can lead to cracks in beams over time.
Cracks may also develop at locations where there are construction defects or poor quality materials used.
Q25. Unit. Wt. Of steel used for windows 10mm sq. Bar
The unit weight of 10mm square bar steel used for windows depends on the type of steel used.
The unit weight of steel varies depending on the type of steel used
The density of steel is around 7850 kg/m³
The weight of 10mm square bar steel can be calculated using the formula: weight = length x width x density
The weight of 10mm square bar steel can range from 0.62 kg/m to 0.78 kg/m depending on the type of steel used
Q26. What is ratio of grade M5 ?
The ratio of grade M5 is 1:5:10 (Cement:Sand:Aggregate).
Grade M5 is a mix of concrete with a compressive strength of 5 N/mm².
The ratio of grade M5 is 1:5:10 (Cement:Sand:Aggregate).
This means that for every 1 part of cement, 5 parts of sand and 10 parts of aggregate are used.
Q27. Difference between 550D and 550
550D is a newer version of 550 with improved features and capabilities.
550D has a higher resolution sensor than 550
550D has a faster continuous shooting speed than 550
550D has a higher maximum ISO than 550
550D has a better LCD screen than 550
Q28. How to order material
To order material, create a detailed list of required items, determine the quantity needed, and identify reliable suppliers.
Create a detailed list of required items
Determine the quantity needed for each item
Identify reliable suppliers
Obtain quotes from suppliers
Compare prices and quality of materials
Place the order with the chosen supplier
Track the delivery of materials
Q29. All types drowing and project completion
Drawing is an essential part of project completion in civil engineering.
Drawings are used to communicate design intent and construction details.
Different types of drawings include site plans, floor plans, elevations, sections, and details.
Drawings must be accurate and up-to-date to ensure project success.
Project completion involves not only finishing construction but also obtaining necessary approvals and permits.
Effective project management involves coordinating all aspects ...read more
Q30. Methodologies of work to be performed.
The methodologies of work to be performed involve planning, organizing, executing, and controlling the project.
The project manager should create a detailed project plan that outlines the scope, schedule, budget, and resources required for the project.
The project manager should organize the project team and assign tasks to team members based on their skills and expertise.
The project manager should execute the project plan by monitoring progress, resolving issues, and communica...read more
Q31. What's finance condition ur company
The finance condition of our company is stable with a healthy cash flow and strong financial performance.
Our company has a positive cash flow, allowing us to meet financial obligations and invest in future projects.
We have a strong financial performance, with consistent profits and revenue growth.
We maintain a healthy balance sheet, with manageable debt levels and sufficient liquidity.
Our financial condition allows us to pursue new opportunities and expand our business operat...read more
Q32. What is rcc grade m25
RCC grade M25 is a concrete mix design ratio used in construction.
RCC stands for Reinforced Cement Concrete.
M25 is the compressive strength of the concrete after 28 days of curing.
The mix design ratio for M25 is 1:1:2 (cement:sand:aggregate).
It is commonly used in the construction of buildings, bridges, and other structures.
M25 grade concrete is suitable for moderate exposure conditions.
Q33. Do you know bbs making
Yes, I know bbs making.
BBS stands for Bar Bending Schedule, which is a document that provides details of reinforcement steel bars required for construction.
BBS making involves preparing the schedule by calculating the required length, weight, and number of bars for each structural element.
It is an important task for ensuring the strength and durability of the structure.
BBS making requires knowledge of engineering drawings, construction codes, and standards.
Software tools like...read more
Q34. Do you know estimation
Yes, estimation is a crucial aspect of project management civil.
Estimation involves predicting the cost, time, and resources required for a project.
It is important to have accurate estimations to ensure the project stays within budget and on schedule.
Estimation techniques include top-down, bottom-up, and parametric estimation.
Factors such as project scope, complexity, and risk must be considered when making estimations.
Regular updates to estimations should be made throughout ...read more
Q35. Different types of slab concrete testing
Different types of slab concrete testing include slump test, air content test, compressive strength test, and flexural strength test.
Slump test measures the consistency and workability of concrete.
Air content test determines the amount of air trapped in the concrete mixture.
Compressive strength test assesses the ability of concrete to withstand loads.
Flexural strength test evaluates the bending strength of concrete.
Q36. Role of project incharge in construction
The role of a project incharge in construction involves overseeing all aspects of the project from planning to completion.
Responsible for overall project planning, scheduling, and coordination
Ensuring compliance with building codes and regulations
Managing project budget and resources effectively
Supervising and coordinating the work of contractors and subcontractors
Resolving any issues or conflicts that may arise during construction
Ensuring quality control and safety measures ...read more
Q37. What is NRC full form
NRC stands for National Register of Citizens.
NRC is a register containing names of all genuine Indian citizens in the state of Assam, India.
It was first prepared in 1951 and is now being updated to identify illegal immigrants.
The NRC process involves verifying the citizenship status of individuals based on documents like birth certificates, land records, etc.
Q38. Unit wt. Of tiles using floor
The unit weight of tiles used for flooring varies depending on the material used.
The unit weight of ceramic tiles is around 20-25 kg/m².
The unit weight of marble tiles is around 60-70 kg/m².
The unit weight of granite tiles is around 70-80 kg/m².
The unit weight of porcelain tiles is around 30-35 kg/m².
The unit weight of terrazzo tiles is around 70-80 kg/m².
Q39. How much CTC ?
The CTC (Cost to Company) for the Civil Project Manager position is negotiable based on experience and qualifications.
The CTC for the Civil Project Manager role is determined based on factors such as experience, qualifications, and the company's budget.
It is common for candidates to negotiate their CTC during the interview process.
The CTC may include components such as base salary, bonuses, benefits, and allowances.
Candidates can research industry standards and salary ranges ...read more
Q40. 1:5:10 is the ratio of M5
The ratio 1:5:10 is for M5 grade concrete.
M5 grade concrete has a compressive strength of 5 N/mm² after 28 days of curing.
The ratio of cement, sand, and aggregate for M5 grade concrete is 1:5:10 respectively.
M5 grade concrete is generally used for non-structural works like flooring, pathways, etc.
Q41. Area sqft works ?
Area sqft works refers to the total square footage of work to be completed in a project.
Area sqft works is a measurement used in construction projects to determine the total amount of space that needs to be worked on.
It helps project managers estimate the amount of materials, labor, and time needed to complete the project.
For example, if a project involves building a house, the area sqft works would include the total square footage of the house including all rooms, floors, an...read more
Q42. IS specification
IS specification refers to the Indian Standard specification for construction materials and practices.
IS specification ensures quality and safety standards in construction projects.
Examples include IS 456 for concrete, IS 3370 for timber, and IS 800 for steel structures.
Compliance with IS specifications is mandatory in India for construction projects.
IS codes cover various aspects such as design, materials, construction practices, and testing procedures.
Q43. Pressure in fire hydrant pipe
Pressure in fire hydrant pipe is determined by factors like water flow rate, pipe diameter, and elevation difference.
Pressure in fire hydrant pipe is directly related to the flow rate of water through the pipe.
The diameter of the pipe also affects the pressure, with larger diameter pipes resulting in lower pressure loss.
Elevation difference between the hydrant and the point of discharge can impact the pressure in the pipe.
Pressure can be calculated using the Bernoulli's equat...read more
Q44. Value of projects
The value of projects refers to the benefits and outcomes that are achieved through successful project completion.
The value of projects can be measured in terms of financial returns, increased efficiency, improved quality, and stakeholder satisfaction.
Examples of project value include cost savings from process improvements, revenue generation from new products or services, and enhanced reputation for delivering on time and within budget.
Value can also be intangible, such as i...read more
Q45. Grade of concrete,
Grade of concrete refers to the strength of the concrete mix design.
Grade of concrete is denoted by the ratio of cement, sand, and aggregates in the mix.
Common grades of concrete include M10, M15, M20, M25, etc.
Higher grade of concrete indicates higher strength and durability.
For example, M20 grade concrete has a mix ratio of 1:1.5:3 (cement:sand:aggregate).
Interview Questions of Similar Designations
Interview experiences of popular companies
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month