Project Manager
900+ Project Manager Interview Questions and Answers
Q1. What is success & what is failure to you? How do you handle failure? - not much interviewer asks such questions, but I believe these are very important questions, if you want to succeed.
Success is achieving goals and fulfilling expectations, while failure is a learning opportunity to improve and grow.
Success is meeting or exceeding expectations and achieving goals
Failure is an opportunity to learn and improve
Handling failure involves analyzing the situation, identifying the cause, and taking corrective action
Success and failure are subjective and can vary depending on the situation and individual goals
Success and failure are not mutually exclusive and can co...read more
Q2. How did you manage the software release and deployment
I managed software release and deployment by following a structured process and ensuring clear communication with all stakeholders.
Created a detailed release plan with timelines and milestones
Conducted thorough testing and quality assurance before deployment
Coordinated with development, operations, and support teams
Communicated progress and any issues to stakeholders
Implemented rollback procedures in case of any issues
Ensured proper documentation and knowledge transfer
Continu...read more
Project Manager Interview Questions and Answers for Freshers
Q3. If you have 1 kg of cotton and 1 kg of iron which is heavier?
Both cotton and iron weigh the same, 1 kg each.
Cotton and iron both have a weight of 1 kg.
The weight of an object is determined by its mass, and in this case, both cotton and iron have the same mass of 1 kg.
Weight is a measure of the force exerted on an object due to gravity, and since both cotton and iron experience the same gravitational force, they weigh the same.
Q4. What is the difference between scrum master and product manager
Scrum Master focuses on facilitating the scrum process while Product Manager focuses on product development.
Scrum Master is responsible for ensuring the scrum process is followed and removing any obstacles that may hinder the team's progress.
Product Manager is responsible for developing the product roadmap, defining product features, and ensuring the product meets customer needs.
Scrum Master is a facilitator while Product Manager is a decision-maker.
Scrum Master works closely...read more
Q5. 1. Fundamentals of estimation techniques. 2. Which all pm tools have you worked on? 3. How do you handle critical but resisting key stakeholders?
Fundamentals of estimation techniques, PM tools used, and handling critical stakeholders.
For estimation techniques, use historical data, expert judgment, and three-point estimation.
I have worked on tools like JIRA, Trello, and Asana.
To handle critical stakeholders, identify their concerns and address them, involve them in decision-making, and communicate regularly.
Example: In a project, a key stakeholder was resistant to a change in the project scope. I scheduled a meeting wi...read more
Q6. If there are any changes in requirements after the scope freeze so how you handle that situation ? So it was normal interview process not difficult one.
Handling changes in requirements after scope freeze as a Project Manager
Assess the impact of the changes on the project timeline, budget, and resources
Communicate the changes to the stakeholders and get their approval
Update the project plan and scope document accordingly
Implement the changes and monitor the progress closely
Document the changes and the reasons behind them for future reference
Share interview questions and help millions of jobseekers 🌟
Q7. What is difference between a planner and a scheduler?
A planner focuses on creating a plan or strategy, while a scheduler focuses on creating a timeline or schedule for executing the plan.
A planner is responsible for developing a comprehensive plan that outlines the goals, objectives, tasks, and resources required for a project.
A scheduler takes the plan created by the planner and breaks it down into specific tasks, assigns resources, and creates a timeline or schedule for executing the plan.
Planners focus on the big picture and...read more
Q8. 4. How do you prioritize the activities.? 5. How do you mitigate the risks? How do you ensure the delivery in time?
Prioritizing activities and mitigating risks are crucial for timely delivery as a Project Manager.
Prioritization is based on project goals, deadlines, and stakeholder expectations.
Risk mitigation involves identifying, assessing, and developing contingency plans.
Delivery in time is ensured through effective communication, monitoring, and adjustment of plans.
Regular status updates and progress reports help in identifying potential delays and taking corrective actions.
Examples: ...read more
Project Manager Jobs
Q9. 1. How many different types of API do you know about? 2. What's the difference between SOAP API and REST API?
There are two main types of APIs - SOAP API and REST API.
SOAP API is a protocol-based API that uses XML for communication, while REST API is an architectural style that uses standard HTTP methods like GET, POST, PUT, DELETE.
SOAP API has a strict set of rules and standards, while REST API is more flexible and lightweight.
SOAP API requires more bandwidth and resources compared to REST API.
Examples of SOAP APIs include Salesforce API, while examples of REST APIs include Twitter ...read more
Q10. How to manage the team of professionals, foremen, workers to get the work completed safely and satisfactorily within the assigned time frame.
To manage the team effectively, establish clear communication, set expectations, provide necessary resources, and promote a positive work environment.
Establish open and transparent communication channels
Set clear expectations and goals
Provide necessary resources and support
Promote teamwork and collaboration
Recognize and reward achievements
Ensure safety protocols are followed
Regularly monitor progress and provide feedback
Address conflicts and issues promptly
Lead by example
Q11. How to manage teams and assign task
Managing teams involves clear communication, delegation, and accountability.
Establish clear goals and expectations for each team member
Communicate regularly to ensure everyone is on the same page
Delegate tasks based on individual strengths and workload
Provide support and resources to help team members succeed
Hold team members accountable for their work and deadlines
Encourage collaboration and open communication within the team
Recognize and reward team members for their contri...read more
Q12. Is the family income derived from a business or from job holders?
Family income can be derived from both a business and job holders.
Family income can come from a business owned by a family member.
Family income can also come from salaries earned by family members from their jobs.
In some cases, family income may be a combination of income from both business and job holders.
Examples: A family may own a small business like a bakery and also have family members working in corporate jobs.
Another example could be a family where one member runs a c...read more
Q13. What are the differences between Tableau and Power BI, and which one is considered superior?
Tableau and Power BI are both powerful data visualization tools, with Tableau being more user-friendly and Power BI offering better integration with Microsoft products.
Tableau is known for its user-friendly interface and ease of use for creating visually appealing dashboards.
Power BI offers better integration with Microsoft products such as Excel, SharePoint, and SQL Server.
Tableau is considered superior for its ease of use and flexibility in creating complex visualizations, ...read more
Q14. What are two limitations of food delivery apps that you believe need improvement?
Limitations of food delivery apps that need improvement
Inaccurate delivery times leading to customer dissatisfaction
Limited restaurant options available on the app
Difficulty in customizing orders or making special requests
Issues with order accuracy and missing items
Lack of transparency in pricing and additional fees
Q15. What is a pivot table in Excel, and how can it be accessed and utilized?
A pivot table in Excel is a data summarization tool that allows you to reorganize and summarize selected columns and rows of data.
Accessed by selecting the data range you want to analyze, then going to the 'Insert' tab and clicking on 'PivotTable'.
Utilized by dragging and dropping fields into the 'Rows', 'Columns', 'Values', and 'Filters' areas to organize and summarize data.
Can be used to quickly analyze large datasets and identify trends, patterns, and relationships within ...read more
Q16. What is adjusted R-squared in descriptive statistics, and what information can be derived from it?
Adjusted R-squared is a statistical measure that adjusts the R-squared value for the number of predictors in a regression model.
Adjusted R-squared takes into account the number of predictors in a regression model, providing a more accurate measure of the model's goodness of fit.
It penalizes the addition of unnecessary predictors, helping to prevent overfitting.
A higher adjusted R-squared value indicates a better fit of the model to the data.
It is calculated using the formula:...read more
Q17. What is correlation, and what conclusions can be drawn from it?
Correlation is a statistical measure that describes the relationship between two variables.
Correlation can range from -1 to 1, with 0 indicating no correlation, 1 indicating a perfect positive correlation, and -1 indicating a perfect negative correlation.
A positive correlation means that as one variable increases, the other variable also tends to increase. For example, there is a positive correlation between studying hours and exam scores.
A negative correlation means that as ...read more
Q18. What is the difference between a project manager and a product manager?
Project managers focus on overseeing the execution of a specific project, while product managers are responsible for the overall strategy and development of a product.
Project managers are focused on the successful completion of a project within scope, budget, and time constraints.
Product managers are responsible for the strategic direction, development, and success of a product throughout its lifecycle.
Project managers work with cross-functional teams to ensure project milest...read more
Q19. What is the process to sort the top 10 rows in Excel?
To sort the top 10 rows in Excel, select the range of data, go to the Data tab, click on Sort, choose the column to sort by, select Top 10 from the options, and specify whether to sort in ascending or descending order.
Select the range of data containing the top 10 rows you want to sort.
Go to the Data tab in Excel.
Click on the Sort button.
Choose the column you want to sort by.
Select 'Top 10' from the 'Sort On' dropdown menu.
Specify whether you want to sort in ascending or desc...read more
Q20. What is the SUBSTITUTE function in Excel, and how can it be used?
The SUBSTITUTE function in Excel replaces a specific occurrence of a text string with another text string.
Syntax: SUBSTITUTE(text, old_text, new_text, instance_num)
text: The original text string where replacement will occur
old_text: The text string to be replaced
new_text: The text string to replace old_text with
instance_num: Optional parameter to specify which occurrence of old_text to replace
Example: =SUBSTITUTE("apple,banana,orange", ",", "/", 2) will replace the second com...read more
Q21. How do you define Digital Transformation strategy for a client ?
Digital Transformation strategy for a client involves identifying areas of improvement and implementing technology solutions to enhance business operations.
Understand the client's business goals and objectives
Identify areas of improvement and pain points
Evaluate existing technology infrastructure
Develop a roadmap for implementing new technology solutions
Ensure alignment with business strategy and goals
Provide training and support for employees
Continuously monitor and evaluate...read more
Q22. What is the prime necessity in the subject position and how it can be met with
The prime necessity in the subject position of a Project Manager is effective communication.
Effective communication is crucial for successful project management
It ensures clear understanding of project goals, requirements, and expectations
Communication helps in building strong relationships with stakeholders
It facilitates collaboration and coordination among team members
Good communication reduces misunderstandings and conflicts
Examples: conducting regular team meetings, using...read more
Q23. How to expedite a particular component incase delivery stuck up?
To expedite a particular component in case of delivery delay, the project manager can take several steps.
Identify the cause of the delay and communicate with the supplier or vendor.
Explore alternative suppliers or vendors who can provide the component faster.
Negotiate with the existing supplier for expedited delivery or partial shipments.
Consider air freight or express shipping options to speed up delivery.
Reallocate resources or adjust the project schedule to accommodate the...read more
Q24. On which cloud platforms have you worked so far?
I have worked on AWS, Azure, and Google Cloud Platform.
Experience in deploying and managing applications on AWS, Azure, and GCP
Familiarity with cloud services such as EC2, S3, RDS, Azure VMs, Azure Storage, GCP Compute Engine, GCP Cloud Storage
Knowledge of cloud security and compliance standards
Experience in cost optimization and resource management on cloud platforms
Q25. What is SDLC? What are the different stages in SDLC?
SDLC stands for Software Development Life Cycle. It is a process used to design, develop and test software.
SDLC is a framework that defines the tasks performed at each stage of software development.
The different stages in SDLC are planning, analysis, design, development, testing, deployment, and maintenance.
Each stage has its own set of deliverables and objectives.
For example, in the planning stage, the project scope and requirements are defined.
In the design stage, the softw...read more
Q26. If a client keeps changing requirements in between the sprint, how do you manage?
To manage changing requirements in between sprints, effective communication, prioritization, and flexibility are key.
Regularly communicate with the client to understand their changing requirements
Prioritize the changes based on their impact and urgency
Adjust the sprint plan and allocate resources accordingly
Ensure the development team is aware of the changes and can adapt
Monitor the progress and make necessary adjustments to meet the new requirements
Document the changes and t...read more
Q27. Explain how would you resolve internal conflicts?
Resolving internal conflicts requires active listening, empathy, and collaboration.
Identify the root cause of the conflict
Encourage open communication and active listening
Facilitate a discussion to find a mutually beneficial solution
Encourage compromise and empathy
Document the resolution and follow up to ensure it is effective
Q28. How do you deal with an under performer despite multiple warnings?
I would follow a structured approach to address the issue.
I would review the performance expectations and goals with the under performer.
I would identify any obstacles or challenges that may be hindering their performance.
I would provide additional training or resources if necessary.
I would set clear and measurable improvement goals with a timeline for achieving them.
I would monitor progress and provide regular feedback and coaching.
If the under performer continues to not mee...read more
Q29. 4. What are the items in project contract? What factors would you include if you need to create a contract, so that client doesn't hold you for any legal issues?
Items in a project contract and factors to prevent legal issues with clients.
Scope of work
Project timeline
Payment terms
Deliverables
Change management process
Termination clauses
Confidentiality agreements
Dispute resolution mechanisms
Q30. What is issue and risk? Have you involved in any Risk practice or not?
Issue and risk are two different concepts in project management. Issues are current problems that need to be resolved, while risks are potential future problems that need to be mitigated.
Issues are current problems that have already occurred and need to be addressed immediately
Risks are potential future problems that may or may not occur, but need to be identified and planned for
Examples of issues include budget overruns, missed deadlines, and scope changes
Examples of risks i...read more
Q31. What is runbook and SOP ? Can we consider SOP as Runbook or not?
Runbook is a set of instructions for IT operations, while SOP is a set of instructions for business processes. They are not the same.
Runbook is a document containing a set of procedures for IT operations, such as troubleshooting steps, maintenance tasks, and disaster recovery processes.
SOP (Standard Operating Procedure) is a document containing a set of instructions for business processes, such as employee onboarding, customer service protocols, and financial reporting proced...read more
Q32. What do you know about cloud?
Cloud refers to the delivery of computing services over the internet.
Cloud computing allows users to access data and applications from anywhere with an internet connection.
Cloud services can be categorized into three main types: Infrastructure as a Service (IaaS), Platform as a Service (PaaS), and Software as a Service (SaaS).
Examples of cloud services include Amazon Web Services, Microsoft Azure, and Google Cloud Platform.
Q33. What do you know about Faclon labs and what services we provide?
Falcon Labs is a leading provider of pharmaceutical development and manufacturing services.
Falcon Labs specializes in pharmaceutical development and manufacturing.
They offer services such as formulation development, analytical testing, and clinical trial manufacturing.
Falcon Labs has a strong reputation for quality and innovation in the pharmaceutical industry.
Q34. 3. If you reach out to a vendor for API integration, what information would you look for?
Key information for API integration with a vendor
Vendor's API documentation
Authentication methods required
Rate limits and usage restrictions
Data formats supported (JSON, XML, etc.)
Error handling and response codes
Testing environment availability
Q35. how you solve problems in site and what type of critical errors you get in site.
I solve problems on site by identifying the root cause and implementing effective solutions.
I analyze the problem thoroughly to understand its underlying causes.
I collaborate with the team to gather relevant information and perspectives.
I prioritize the critical errors based on their impact and urgency.
I develop and implement action plans to address the identified issues.
I monitor the progress of the solutions and make adjustments as necessary.
I ensure effective communication...read more
Q36. How will you make a low-performing resource a high-performing one?
Provide clear expectations, offer support and training, provide feedback and recognition, set goals and milestones.
Clearly communicate expectations and goals to the resource.
Offer support and training to help the resource improve their skills and knowledge.
Provide regular feedback and recognition for progress made.
Set specific goals and milestones to track improvement.
Create a development plan with the resource to address areas of improvement.
Provide opportunities for the res...read more
Q37. What is Stakeholders in Project Management and type?
Stakeholders in project management are individuals or groups who have an interest in the project and can influence or be influenced by its outcome.
Stakeholders can include project sponsors, team members, clients, end users, suppliers, and regulatory bodies.
They can be classified into internal stakeholders (e.g. team members) and external stakeholders (e.g. clients).
Stakeholders can have varying levels of influence and interest in the project, which can impact project success....read more
Q38. What is Scrum & related ceremonies? How effective is scrum? Difference between waterfall and scrum?
Scrum is an agile framework for managing and completing complex projects. It involves iterative and incremental development.
Scrum involves a team of cross-functional members who work together to deliver a potentially shippable product increment at the end of each sprint.
The ceremonies in Scrum include Sprint Planning, Daily Scrum, Sprint Review, and Sprint Retrospective.
Scrum is effective in promoting collaboration, transparency, and adaptability in project management.
The mai...read more
Q39. What % to be use for project planning
The percentage to be used for project planning varies depending on the project's complexity and scope.
The percentage can range from 5% to 25% of the total project time and budget.
The percentage should be determined based on the project's size, complexity, and risk.
The percentage should also consider the level of detail required for the project plan.
For example, a small project with a clear scope may only require 5% of the total time and budget for planning, while a large, com...read more
Q40. How to present to customer when delivery is not on time
Be honest and transparent, provide a clear explanation of the delay, offer solutions and a plan to mitigate future delays.
Acknowledge the delay and apologize for any inconvenience caused
Explain the reason for the delay and provide any relevant details
Offer solutions to mitigate the impact of the delay, such as expedited shipping or a discount
Provide a plan to prevent future delays, such as improved communication or better project management
Maintain open communication with the...read more
Q41. How to plan a project? How to create project on Jira, etc.
Planning a project involves defining goals, creating a timeline, assigning tasks, and using tools like Jira.
Define project goals and objectives
Create a project timeline with milestones
Assign tasks to team members with deadlines
Use project management tools like Jira to track progress and manage tasks
Q42. What are all kinds of documents as PM you will create?
As a Project Manager, I will create various documents such as project plans, schedules, budgets, status reports, risk assessments, and communication plans.
Project plans
Schedules
Budgets
Status reports
Risk assessments
Communication plans
Q43. What are the details of your Key Performance Indicators (KPIs) and the achievements you have accomplished?
My KPIs include project completion rate, budget adherence, client satisfaction, and team performance.
Maintained a project completion rate of 95% by effectively managing timelines and resources
Achieved a budget adherence of 98% by closely monitoring expenses and making adjustments as needed
Received consistently high client satisfaction scores, with an average rating of 4.8 out of 5
Improved team performance by implementing regular feedback sessions and training programs
Q44. 8. How you done the controls the materials, equipments & labour Contractor arrange?
I have implemented a system of checks and balances to ensure proper control of materials, equipment, and labor provided by contractors.
Established a detailed inventory system to track all materials and equipment provided by contractors
Implemented regular inspections to ensure equipment is in good working condition and being used properly
Conducted regular meetings with contractors to discuss labor allocation and progress
Implemented a system of performance metrics to evaluate c...read more
Q45. How about an incident where you think the solution could have been better and why it couldn't be done?
An incident where a better solution could have been implemented
During a software development project, we faced a delay due to a miscommunication between the development and testing teams
The solution was to extend the testing timeline, but it resulted in a delay in the project delivery
A better solution would have been to have a clear communication plan and regular meetings between the teams to avoid such delays
However, due to the tight project timeline and lack of resources, i...read more
Q46. How many feature you have added to your application by providing inputs through user stories as long as Agile frameworks is concerned?
I have added 50 features through user stories in Agile framework.
I have been working on Agile framework for 2 years.
I have added features like user login, payment gateway integration, and search functionality.
I prioritize user stories based on business value and impact.
I collaborate with the development team to ensure the features are implemented correctly.
I continuously gather feedback from users to improve the application.
Q47. What do you know about virtualization?
Virtualization is the creation of a virtual version of something, such as an operating system, server, storage device, or network resource.
Virtualization allows multiple operating systems to run on a single physical machine
It enables better utilization of hardware resources
Examples include VMware, Hyper-V, and VirtualBox
Virtualization can also be used for cloud computing and disaster recovery
Q48. How would you determine the power loading requested by Telecom service provider is below actual energy consumption at site.
To determine if power loading requested by Telecom service provider is below actual energy consumption at site, conduct a power audit.
Conduct a power audit to measure the actual energy consumption at the site
Compare the power audit results with the power loading requested by the Telecom service provider
If the power loading requested is lower than the actual energy consumption, it indicates a discrepancy
Investigate the reasons for the discrepancy, such as incorrect calculation...read more
Q49. What are Agile Values? Scrum Values? Scrum Ceremonies? Story Points?
Agile values include individuals and interactions over processes and tools, while Scrum values include commitment, courage, focus, openness, and respect.
Agile values prioritize individuals and interactions over processes and tools
Scrum values include commitment, courage, focus, openness, and respect
Scrum ceremonies include Sprint Planning, Daily Standup, Sprint Review, and Sprint Retrospective
Story points are a unit of measure used in Agile to estimate the size of user storie...read more
Q50. what is your current CTC and what is your expected CTC
I prefer not to disclose my current CTC. My expected CTC is based on industry standards and my experience.
I am not comfortable sharing my current CTC as it is confidential information.
My expected CTC is based on my experience and the industry standards.
I am open to negotiation based on the job responsibilities and benefits offered.
I have researched the market rates for this position and have a realistic expectation.
I am more interested in discussing the job responsibilities a...read more
Interview Questions of Similar Designations
Top Interview Questions for Project Manager Related Skills
Interview experiences of popular companies