Q1. Why reinforcement is provided alternative in column?
Reinforcement is provided in column to increase its load-bearing capacity and prevent failure due to compression.
Reinforcement helps to resist bending and shear forces in the column.
It also helps to prevent buckling and reduces the risk of collapse.
The amount and type of reinforcement used depends on the size and height of the column.
For example, a taller and thinner column may require more reinforcement than a shorter and thicker one.
Q2. How much accepted 8mm to 10mm steel rod rolling margine value ?
The accepted rolling margin value for 8mm to 10mm steel rods varies depending on the specific project requirements and industry standards.
The accepted rolling margin value can range from 2% to 5%.
It is important to consult project specifications and industry guidelines for the specific rolling margin value.
For example, if the rolling margin value is set at 3%, a 10mm steel rod could have a diameter between 9.7mm and 10.3mm.
The rolling margin value ensures that the steel rods ...read more
Senior Civil Engineer Interview Questions and Answers for Freshers
Q3. Do you have idea about safety and safety rules at L&T?
Yes, safety is a top priority at L&T and there are strict safety rules in place.
L&T has a comprehensive safety policy that covers all aspects of their operations.
All employees are required to undergo safety training and follow safety protocols.
Regular safety audits are conducted to ensure compliance with safety rules.
Personal protective equipment is provided to employees and its use is mandatory in hazardous areas.
Safety is integrated into the design and construction of all p...read more
Q4. What is the estimated cost of 100 feet by 100 feet of office in terms of Vitrified tiling, false ceiling, office furnitures for 20 person?
The estimated cost of 100ft x 100ft office with vitrified tiling, false ceiling, and furniture for 20 people.
The cost of vitrified tiling varies depending on the quality and design chosen.
False ceiling cost depends on the type of material used and the complexity of the design.
Office furniture cost varies based on the type and quality of furniture selected.
The estimated cost can range from $50,000 to $100,000 or more depending on the above factors.
Q5. What is the slump range for boom pressure?
The slump range for boom pressure varies depending on the specific project requirements and concrete mix design.
The slump range for boom pressure is typically determined by the concrete mix design and the desired workability of the concrete.
It can range from low slump (around 25-50 mm) for high-strength concrete with low water-cement ratio to high slump (around 150-200 mm) for self-compacting concrete.
The slump range may also vary based on the type of boom pump being used and...read more
Q6. What are the measures you take for quality control?
We follow a comprehensive quality control plan that includes regular inspections, testing, and documentation.
Develop and implement a quality control plan
Conduct regular inspections and testing
Document all quality control activities
Ensure compliance with industry standards and regulations
Provide training to staff on quality control procedures
Share interview questions and help millions of jobseekers 🌟
Q7. What is density of mild steel,what is the minimum cover for concrete beam,precautionary measures taken for shuttering in raft,least count of theodolite,density of m20 grade concrete,what are the main objectives...
read moreThe density of mild steel is 7850 kg/m³. The minimum cover for a concrete beam depends on various factors such as exposure conditions and reinforcement type. Precautionary measures for shuttering in raft include proper cleaning, oiling, and bracing. The least count of a theodolite depends on its design and specifications. The density of M20 grade concrete is approximately 2400 kg/m³. The main objectives of a civil engineer include designing, constructing, and maintaining infr...read more
Q8. Aluminium (mivan) structure sequence of activities?
The sequence of activities for aluminium (mivan) structure construction involves several steps.
Preparing the site and marking the layout
Constructing the foundation and footings
Erecting the aluminium formwork panels
Fixing reinforcement bars and embedment items
Pouring concrete into the formwork
Curing the concrete
Stripping the formwork
Finishing and cleaning the structure
Senior Civil Engineer Jobs
Q9. What is epoxy flooring and what are the steps it involved?
Epoxy flooring is a durable and long-lasting flooring solution made of epoxy resin and hardener.
The surface is prepared by cleaning and etching
The epoxy mixture is applied using a roller or squeegee
A second coat may be applied after the first coat has cured
The surface is left to cure for 24-72 hours
Optional: a topcoat may be applied for added durability and shine
Q10. What is the basics concept used for construction of Substation from start to Finish
The basic concept for construction of a substation involves site selection, design, equipment installation, and commissioning.
Site selection involves identifying a suitable location for the substation based on factors such as proximity to power sources and load centers.
Design involves creating a plan for the substation layout, including the placement of equipment such as transformers, switchgear, and control systems.
Equipment installation involves the physical installation of...read more
Q11. Which formwork is used in all ur recently worked companies ?
Various types of formwork have been used in my recently worked companies, including timber formwork, steel formwork, and aluminum formwork.
Timber formwork is commonly used for small to medium-sized projects due to its cost-effectiveness and flexibility.
Steel formwork is preferred for large and complex structures due to its durability and reusability.
Aluminum formwork is lightweight and easy to handle, making it suitable for fast-track construction projects.
Q12. What is maximum poring of concrete per day?
The maximum pouring of concrete per day depends on various factors such as project requirements, equipment availability, and workforce.
The maximum pouring of concrete per day is determined by the project specifications and schedule.
Factors such as the size and complexity of the project, weather conditions, and the availability of equipment and manpower play a significant role in determining the maximum pouring capacity.
For large-scale projects with ample resources, it is poss...read more
Q13. What is clean room and what are the requirements of the clean room area?
A clean room is a controlled environment with low levels of pollutants such as dust, airborne microbes, and chemical vapors.
Clean rooms are used in industries such as pharmaceuticals, biotechnology, electronics, and aerospace.
The requirements of a clean room area include controlled air flow, high-efficiency particulate air (HEPA) filters, and strict gowning procedures.
Clean room classifications are based on the number of particles per cubic meter of air, with ISO Class 1 bein...read more
Q14. What is Permit To Work system? What types of work permits you are aware of?
A Permit To Work system is a formal process to control high-risk activities in the workplace.
It ensures that proper precautions are taken before starting any work that could potentially be hazardous.
It involves obtaining a permit from a designated authority before commencing work.
The permit outlines the specific tasks, hazards, safety measures, and duration of the work.
Different types of work permits include hot work permits, confined space permits, electrical work permits, e...read more
Q15. How many materials required in 1m3 Plastering mortar?
The materials required in 1m3 of plastering mortar include cement, sand, and water.
Cement is typically used in the ratio of 1:4 for plastering mortar.
Sand is used in the ratio of 3-4 times the amount of cement used.
Water is added as needed to achieve the desired consistency.
For example, for 1m3 of plastering mortar, you may need 0.25m3 of cement, 1m3 of sand, and water as needed.
Q16. What are the quality aspect to assure good quality of concrete?
Quality aspects for good quality of concrete include proper mix design, adequate curing, and testing.
Proper mix design with appropriate proportions of cement, aggregates, and water
Adequate curing to ensure strength development and prevent cracking
Testing of concrete for compressive strength, workability, and durability
Use of quality materials and proper construction practices
Regular inspection and maintenance of concrete structures
Q17. What is thickness for outer & inner walls Plastering?
The thickness for outer and inner walls plastering typically ranges from 12mm to 20mm.
The thickness of plastering for outer walls is usually around 15mm to 20mm.
The thickness of plastering for inner walls is typically around 12mm to 15mm.
The thickness may vary based on the type of wall surface and the desired finish.
It is important to ensure proper curing and finishing for a durable and aesthetically pleasing result.
Q18. How many workers would you engage for 1 cum concrete? How much binding wire would you require for binding 1MT reinforcement. How much can you negotiate while procuring materials?
The number of workers for 1 cum concrete depends on the project timeline and equipment used. Binding wire requirement for 1MT reinforcement depends on the binding pattern. Negotiation while procuring materials varies based on market conditions and project requirements.
The number of workers for 1 cum concrete can range from 4 to 10, depending on factors like project timeline, equipment used, and labor efficiency.
Binding wire requirement for 1MT reinforcement depends on the bin...read more
Q19. What to do if concrete cube fail? (You will know after 28 days of casting. What to do?)
If concrete cube fails after 28 days of casting, investigate the cause and take corrective measures.
Investigate the cause of failure
Check if the mix design was correct
Check if the curing was done properly
Take corrective measures to prevent future failures
Re-cast the concrete cube for further testing
Q20. What materials are used for making clean room area? (Partition,coving flooring etc. )
Materials commonly used for making clean room areas include partition walls, coving, and specialized flooring.
Partition walls in clean rooms are typically made of materials such as stainless steel, aluminum, or composite panels.
Coving, which is the curved transition between the wall and floor, is often made of materials like PVC or stainless steel.
Clean room flooring can be made of materials such as epoxy resin, vinyl, or rubber, which are easy to clean and maintain.
Other mat...read more
Q21. What is the weight of 12 mm steel bar per meter
The weight of a 12 mm steel bar per meter depends on the density of steel.
The weight of a steel bar can be calculated using the formula: weight = volume × density
The volume of a steel bar can be calculated using the formula: volume = π × (diameter/2)^2 × length
The density of steel is approximately 7850 kg/m^3
To calculate the weight of a 12 mm steel bar per meter, substitute the values into the formulas
Q22. What is accountability and productivity?
Accountability is the responsibility to answer for one's actions, while productivity is the measure of efficiency and output in achieving goals.
Accountability refers to being answerable for one's actions, decisions, and performance.
It involves taking ownership of tasks and outcomes, and being transparent and responsible.
Productivity is the measure of how efficiently and effectively work is completed.
It focuses on achieving goals and delivering results in a timely manner.
Accou...read more
Q23. How many Concrete blocks is required for 100sft ?
The number of concrete blocks required for 100sft depends on the size of the blocks and the thickness of the wall being built.
The number of concrete blocks needed can be calculated by dividing the total area (100sft) by the area of one block.
The size of the concrete block and the thickness of the wall will determine the number of blocks needed.
For example, if each concrete block is 1ft x 1ft and the wall is 4 inches thick, you would need 100 blocks for 100sft area.
Q24. What is the mix proportion of Plastering mortar?
The mix proportion of plastering mortar typically consists of 1 part cement to 3-4 parts sand.
The mix proportion of plastering mortar is usually 1:3 or 1:4 (cement:sand)
The mix can also include lime to improve workability and durability
Water is added to achieve the desired consistency for application
Example: A common mix proportion for plastering mortar is 1 part cement, 3 parts sand, and water as needed
Q25. Answer:- Type of tiles veterified , glazed ,tile marzen 10 to 15%, mortar used in Dado tiles 1:3 and flooring 1:6 used and about M 25 weight unit weight of steel per meters.
The question covers topics related to civil engineering such as tiles, mortar, and steel weight.
Types of tiles commonly used in civil engineering
Mortar ratios for dado tiles and flooring
Unit weight of steel per meter
Importance of using appropriate materials in construction
Q26. How to start block work ? how to check block work quality check before gypsum work ?
To start block work, first prepare the surface and layout the blocks. To check quality, ensure levelness, alignment, and proper mortar joints.
Prepare the surface by cleaning and dampening it.
Layout the blocks according to the design and mark the corners.
Check for levelness and alignment using a spirit level and string lines.
Ensure proper mortar joints by using the correct mix and thickness.
Check for any cracks or damage in the blocks before starting work.
After completion, che...read more
Q27. Like what is M20, what is its ratio what are beams, one way slab two way slab, what is coferdam, some test of concrete and more related to civil engineering
M20 is a concrete mix ratio, beams are structural elements, one-way slab supports load in one direction, two-way slab supports load in two directions, cofferdam is a temporary structure, and there are various tests for concrete.
M20 is a concrete mix ratio of 1:1.5:3 (cement:sand:aggregate)
Beams are horizontal structural elements that support vertical loads
One-way slab is a slab that supports load in one direction, like a bridge deck
Two-way slab is a slab that supports load in...read more
Q28. What is the deviation in compressive strength of concrete cube?
The deviation in compressive strength of concrete cube depends on various factors.
The deviation can be affected by factors such as the quality of materials used, curing conditions, testing procedures, and age of concrete.
The standard deviation of compressive strength for a set of 6 cubes is generally considered to be around 5-10% of the average strength.
The deviation can also be influenced by the size and shape of the cube, as well as the location from where the sample is tak...read more
Q29. What are various types of soils
Various types of soils include clay, sand, silt, peat, and loam.
Clay: fine-grained soil that is sticky when wet and hard when dry
Sand: coarse-grained soil with large particles that drain well
Silt: medium-grained soil with properties between clay and sand
Peat: organic soil made up of decomposed plant material
Loam: a balanced mixture of sand, silt, and clay that is ideal for plant growth
Q30. What is the 10 mm steel bar per meter
The 10 mm steel bar per meter refers to the weight of a 10 mm diameter steel bar per meter length.
The weight of a steel bar per meter length depends on its diameter.
The weight can be calculated using the formula: weight = (diameter^2) * 0.00617, where diameter is in millimeters.
For a 10 mm steel bar, the weight per meter would be approximately 0.617 kg.
Q31. how do you calculate the concrete requirement for slab ??
Concrete requirement for slab is calculated by multiplying the area of the slab with the thickness of the slab.
Calculate the area of the slab by multiplying the length and width of the slab.
Determine the thickness of the slab.
Multiply the area of the slab with the thickness to get the concrete requirement.
Add an additional 10-15% to the total concrete requirement for wastage and spillage.
Consider the type of concrete mix and reinforcement required for the slab.
Example: For a ...read more
Q32. 1-what is the maximum required water cement ratio for M25,M30.
The maximum required water cement ratio for M25 and M30 concrete varies depending on the specific project requirements and design considerations.
The water cement ratio is an important factor in determining the strength and durability of concrete.
For M25 concrete, the maximum water cement ratio typically ranges from 0.55 to 0.6.
For M30 concrete, the maximum water cement ratio is usually around 0.45 to 0.5.
The water cement ratio should be carefully controlled to ensure the desi...read more
Q33. Working procedure, what is the right procedure to start the work
The right procedure to start work as a Senior Civil Engineer involves planning, communication, and safety measures.
Review project plans and specifications
Communicate with team members and stakeholders
Ensure safety measures are in place
Assign tasks and responsibilities
Establish timelines and deadlines
Monitor progress and adjust plans as needed
Q34. What if 28-day concrete strength is not up to the mark?
Investigate potential causes such as improper mix design, curing conditions, or testing errors.
Check mix design for proper proportions of cement, aggregates, and water.
Ensure proper curing conditions such as temperature and moisture levels.
Verify testing procedures and equipment for accuracy and consistency.
Consider environmental factors like temperature and humidity during curing process.
Consult with concrete suppliers or experts for advice on improving strength.
Perform addi...read more
Q35. What is Single Line Diagram of Substation
Single Line Diagram of Substation is a graphical representation of electrical distribution system in a substation.
It shows the electrical components and their connections in a simplified manner
It helps in understanding the flow of power and voltage levels in the system
It is used for planning, designing, and maintenance of the substation
It includes information about transformers, circuit breakers, busbars, and other equipment
It is an important tool for ensuring safety and reli...read more
Q36. How to execution of ms line , DI line ,HDPE line etc
Execution of MS line, DI line, HDPE line involves proper planning, material selection, installation, and testing.
Plan the layout and route of the lines based on project requirements and specifications.
Select appropriate materials such as MS, DI, or HDPE based on factors like pressure rating, corrosion resistance, and cost.
Ensure proper installation of the lines including welding, jointing, and fittings.
Conduct pressure testing and leak testing to ensure the lines are function...read more
Q37. what is the mesh name we usend in plastring?
The mesh used in plastering is called plaster mesh or stucco mesh.
Plaster mesh is made of galvanized metal or fiberglass.
It is used to reinforce plaster or stucco on walls and ceilings.
The mesh helps prevent cracking and improves the durability of the plaster.
Plaster mesh is available in different sizes and shapes depending on the application.
Examples of plaster mesh include diamond mesh, rib lath, and corner bead.
Q38. How to quardinate project work if your position is site incharge
As a site incharge, project work coordination can be achieved through effective communication, delegation, and monitoring.
Establish clear communication channels with all stakeholders involved in the project
Delegate tasks and responsibilities to team members based on their strengths and expertise
Monitor progress regularly and make adjustments as necessary
Ensure that all work is completed on time and within budget
Maintain accurate records and documentation of all project activi...read more
Q39. FHTC full form & How to install connection for tap
FHTC stands for Flexible High Temperature Cable. To install connection for tap, follow these steps:
Turn off the water supply to the tap
Remove the existing tap connection
Clean the area around the tap connection
Apply plumber's tape to the threaded end of the tap connection
Insert the tap connection into the water supply line
Tighten the connection using a wrench
Turn on the water supply and check for any leaks
Q40. How will you react if any mishappening or accident occur at Site?
I will remain calm, assess the situation, ensure safety of all personnel, and take necessary actions to address the mishap.
Remain calm and composed to think clearly
Assess the situation to understand the extent of the mishap
Ensure safety of all personnel at the site
Take necessary actions to address the mishap such as calling emergency services or implementing safety protocols
Investigate the root cause to prevent future accidents
Q41. Is codes for concrete, bathing plant, reinforcement
Yes, there are codes for concrete, batching plant, and reinforcement in civil engineering.
Codes for concrete include ACI 318, Eurocode 2, and BS 8110.
Codes for batching plant include ASTM C94 and ACI 304R.
Codes for reinforcement include ACI 318, Eurocode 2, and BS 8666.
These codes provide guidelines and standards for design, construction, and quality control in civil engineering projects.
Q42. What are the frequency for casting concrete cube?
Concrete cubes are casted at regular intervals to ensure quality control.
The frequency of casting concrete cube depends on the project specifications and requirements.
Generally, cubes are casted at 7 days, 14 days, and 28 days after pouring the concrete.
The cubes are tested for compressive strength to ensure the concrete meets the required standards.
If the cubes fail to meet the required strength, corrective measures are taken to improve the quality of the concrete.
Q43. Tell me about PEB components and its function
PEB components are pre-engineered building components that are manufactured off-site and assembled on-site.
PEB components include primary framing, secondary framing, roof and wall panels, and accessories.
Primary framing consists of columns, rafters, and beams that support the weight of the building.
Secondary framing includes purlins, girts, and eave struts that provide additional support for the roof and walls.
Roof and wall panels are the outermost layer of the building and p...read more
Q44. Composition of material in cement and reinforcement
Cement is composed of limestone, clay, silica, iron ore, and gypsum. Reinforcement materials include steel and fiberglass.
Cement composition: limestone, clay, silica, iron ore, gypsum
Reinforcement materials: steel, fiberglass
Q45. why cracks from between column and brick wall?
Cracks between column and brick wall can be caused by various factors.
Differential settlement between the column and the wall
Thermal expansion and contraction of the materials
Inadequate reinforcement or poor construction practices
Excessive loading or vibrations
Moisture infiltration and freeze-thaw cycles
Chemical reactions between the materials
Age and deterioration of the materials
Design flaws or inadequate detailing
Q46. What are the factors affecting safety at site?
Factors affecting safety at site include human error, equipment failure, weather conditions, and lack of training.
Human error such as negligence, carelessness, and lack of attention to detail
Equipment failure due to poor maintenance or malfunction
Weather conditions such as rain, snow, or extreme heat
Lack of training or experience in handling equipment or performing tasks
Inadequate safety measures or procedures
Poor communication among workers or between workers and management
E...read more
Q47. Various Cocnrete grades and their mix designs
Concrete grades are classified based on their compressive strength. Mix designs vary based on the grade required.
Concrete grades range from M5 to M80, with M representing mix and the number representing compressive strength in MPa.
Mix designs include proportions of cement, aggregates, water, and admixtures to achieve desired strength and workability.
For example, M20 grade concrete typically has a mix design of 1:1.5:3 (cement: sand: aggregates) with water-cement ratio of 0.5.
Q48. What is prior checking before flooring work
Prior checking before flooring work
Ensure the surface is clean and free of debris
Check for any cracks or unevenness in the subfloor
Verify that the moisture content of the subfloor is within acceptable limits
Confirm that the subfloor is level and flat
Inspect the flooring material for any defects or damage
Q49. What is the lap length of column
The lap length of a column is the length of overlap between two reinforcing bars.
The lap length is determined by the diameter of the bars and the strength of the concrete.
It is important to ensure that the lap length is sufficient to transfer the load from one bar to the other.
The lap length can vary depending on the type of column and the design requirements.
For example, in a reinforced concrete column, the lap length may be between 40 to 60 times the diameter of the bar.
In ...read more
Q50. Whole process of residential building from start to bottom.
The process of residential building involves planning, design, construction, and finishing.
1. Planning phase includes site selection, zoning regulations, and obtaining permits.
2. Design phase involves creating architectural and structural plans.
3. Construction phase includes site preparation, foundation laying, framing, and finishing work.
4. Finishing phase includes interior design, landscaping, and final inspections.
5. Each phase requires coordination between architects, eng...read more
Interview Questions of Similar Designations
Interview experiences of popular companies
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month