Upload Button Icon Add office photos

Filter interviews by

Megha Engineering & Infrastructures Interview Questions, Process, and Tips

Updated 6 Feb 2025

Top Megha Engineering & Infrastructures Interview Questions and Answers

View all 317 questions

Megha Engineering & Infrastructures Interview Experiences

Popular Designations

430 interviews found

Store Keeper Interview Questions & Answers

user image Anonymous

posted on 21 Dec 2024

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - One-on-one 

(5 Questions)

  • Q1. My Experience is good and best Experience this this my problem is company dropuot , My interview this HR.and CEO. BM .and Accounted this all company best Experience members this me interview show That is ...
  • Q2. Company manufacturing work this BHEL part and CGL part working this manufacturing company
  • Q3. What is skill? Ans:- MS word ms excel and telly knowledge all store keepers knowledge
  • Q4. What this professional and personal? Ans:-I am work times professional and that is work out time personal
  • Q5. What did you house? Working side areas areng
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. I am interested to face any kind of interview
  • Q2. Can I get the job as for my profile
  • Q3. I am ready to give interview
  • Q4. I ready to technical interview
  • Q5. I ready to give operation interview

Factory Manager Interview Questions asked at other Companies

Q1. How to control operators attrition and possible solution for it to avoid losses
View answer (1)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Sep 2024.

Round 1 - Technical 

(4 Questions)

  • Q1. Description for Tunnel NATM
  • Ans. 

    NATM stands for New Austrian Tunneling Method, a construction method for tunnels.

    • NATM is a tunneling method that involves excavating the tunnel while providing support using rock bolts, shotcrete, and steel ribs.

    • It is a flexible and adaptable method that allows for adjustments during construction based on the geological conditions encountered.

    • NATM is commonly used in soft ground conditions where traditional tunneling m...

  • Answered by AI
  • Q2. Description for Standup time and Tunnel Supports
  • Ans. 

    Standup time refers to the time it takes for concrete to set and gain enough strength to support itself. Tunnel supports are structures used to stabilize the tunnel walls and roof.

    • Standup time is crucial for ensuring the stability of the tunnel during construction.

    • Tunnel supports can include rock bolts, shotcrete, steel ribs, and lattice girders.

    • The type of tunnel support used depends on the geology of the surrounding ...

  • Answered by AI
  • Q3. Describe the blast details with powder factor and quantity
  • Ans. 

    Blast details include powder factor and quantity of explosives used.

    • Powder factor is the amount of explosives used per unit volume of rock to be blasted

    • Quantity of explosives used is typically measured in kilograms or pounds

    • Blast details are crucial for ensuring safe and efficient tunnel excavation

  • Answered by AI
  • Q4. Describe the Cycle time
  • Ans. 

    Cycle time is the total time taken to complete a task or process from start to finish.

    • Cycle time includes all the time spent on actual work as well as any waiting time or delays.

    • It is an important metric in project management to assess efficiency and productivity.

    • For tunnel engineering, cycle time could refer to the time taken to complete a specific phase of tunnel construction, such as excavation or lining installatio

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Salary expecting
  • Q2. What you specially do for company

Top Megha Engineering & Infrastructures Tunnel Engineer Interview Questions and Answers

Q1. What is pullout test and where it is used
View answer (1)

Tunnel Engineer Interview Questions asked at other Companies

Q1. What information is required when designing tunnel projects
View answer (1)

QA QC Engineer Interview Questions & Answers

user image Vishal Kumar

posted on 21 Dec 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. What is cement and components
  • Q2. Type of cement
  • Q3. What is concrete
  • Q4. What is Dia of rod
  • Q5. What is ratio of concrete M20

Interview Preparation Tips

Interview preparation tips for other job seekers - Site engineer quality engineer

Top Megha Engineering & Infrastructures QA QC Engineer Interview Questions and Answers

Q1. What are the tests you have done
View answer (16)

QA QC Engineer Interview Questions asked at other Companies

Q1. wha is your response ?, if material will purchase from any factory then what will u do that ? , how many hours can u do work in a day?, do u know all plant calibration?, how the borrow area will select ?, how u manage your junior in work pe... read more
View answer (2)

Megha Engineering & Infrastructures interview questions for popular designations

 Senior Engineer

 (19)

 Civil Site Engineer

 (17)

 Civil Engineer

 (13)

 Store Executive

 (13)

 Graduate Engineer Trainee (Get)

 (11)

 QA QC Engineer

 (11)

 Senior Civil Engineer

 (10)

 Engineer

 (8)

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What interests you about Civil Lines?
  • Ans. 

    I am fascinated by the impact Civil Lines have on urban development and infrastructure.

    • The opportunity to contribute to the design and construction of roads, bridges, and buildings

    • The challenge of ensuring safety and efficiency in infrastructure projects

    • The chance to work on projects that improve the quality of life for communities

    • The satisfaction of seeing tangible results of your work, such as a new bridge connecting

  • Answered by AI
  • Q2. What factors influenced your decision to choose our company?
  • Ans. 

    I was impressed by your company's reputation for innovative projects and commitment to sustainability.

    • Reputation for innovative projects

    • Commitment to sustainability

    • Positive reviews from current employees

    • Company's values align with my own

    • Opportunities for professional growth and development

  • Answered by AI

Top Megha Engineering & Infrastructures Civil Engineer Interview Questions and Answers

Q1. What is the procedure to start the earthen dam
View answer (3)

Civil Engineer Interview Questions asked at other Companies

Q1. What is the curing formalities for our precast segment???
View answer (20)

Get interview-ready with Top Megha Engineering & Infrastructures Interview Questions

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 27 Sep 2024

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Aug 2024.

Round 1 - Technical 

(6 Questions)

  • Q1. Why use Steel in Construction works.
  • Ans. 

    Steel is used in construction works due to its strength, durability, versatility, and cost-effectiveness.

    • Steel is known for its high tensile strength, making it ideal for supporting heavy loads in buildings and bridges.

    • Steel is durable and resistant to corrosion, ensuring the longevity of structures.

    • Steel can be easily fabricated into different shapes and sizes, allowing for versatile design options.

    • Steel is cost-effec...

  • Answered by AI
  • Q2. Why Provided Concrete Cover in all Structures Members.
  • Ans. 

    Concrete cover is provided in all structural members to protect the reinforcement bars from corrosion and fire damage.

    • Concrete cover protects the reinforcement bars from corrosion caused by exposure to moisture and chemicals in the environment.

    • It also provides protection against fire damage by acting as a barrier between the reinforcement and the fire.

    • Proper concrete cover helps in maintaining the durability and streng...

  • Answered by AI
  • Q3. How to do Calculate Staircase Steel.
  • Ans. 

    Calculate the amount of steel required for a staircase based on design and dimensions.

    • Calculate the total length of all the steel bars needed for the staircase

    • Determine the diameter and spacing of the steel bars based on design requirements

    • Consider the number of steps and the dimensions of the staircase in the calculation

    • Account for any additional reinforcement needed for structural integrity

    • Consult structural drawings

  • Answered by AI
  • Q4. How do I Find Concrete Workability.
  • Ans. 

    Concrete workability can be determined by conducting a slump test.

    • Conduct a slump test to measure the consistency of the concrete mix.

    • Adjust the water content or use admixtures to achieve the desired workability.

    • Consider factors such as temperature, humidity, and type of aggregates in determining workability.

    • Consult with concrete mix design experts for guidance on achieving the desired workability.

    • Use tools like flow t...

  • Answered by AI
  • Q5. What is Slum test for Concrete.
  • Ans. 

    Slump test is a method to measure the consistency of concrete before it sets.

    • Slump test involves filling a cone-shaped mold with concrete, then lifting the mold to see how much the concrete slumps or settles.

    • The amount of slump indicates the workability of the concrete - higher slump means more workable concrete.

    • The test helps ensure the concrete is of the right consistency for proper placement and compaction.

    • Slump tes...

  • Answered by AI
  • Q6. What is Concrete Mix Design.
  • Ans. 

    Concrete mix design is the process of selecting suitable ingredients and determining their proportions to produce concrete with desired properties.

    • Involves selecting the right combination of materials like cement, aggregates, water, and admixtures

    • Proportions are determined based on desired strength, workability, durability, and other properties

    • Testing and adjusting the mix design to meet project requirements

    • Example: A ...

  • Answered by AI

Top Megha Engineering & Infrastructures Site Engineer Interview Questions and Answers

Q1. Why Provided Concrete Cover in all Structures Members.
View answer (1)

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (2)

Jobs at Megha Engineering & Infrastructures

View all
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(3 Questions)

  • Q1. Basic engineering questions
  • Q2. Air valve locations
  • Q3. Pump house related questions

Top Megha Engineering & Infrastructures Senior Engineer Interview Questions and Answers

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (54)

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (54)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I was interviewed in Jul 2024.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Lifo & Fifo Lifo :- Last in first out Fifo :- Fast in fast out
  • Q2. Inventry kitne parkar ke hote hain Inventry three parkar ke hote hai Row meterial Work in progress Finished good
  • Q3. Tmt steel ka weight kaise nikalte hain D*D/162*Lenth*quantity
  • Q4. Hywa ka weight kaise nikalte hain Hywa ka sab se pahale measurement lete hain ush ke baad ushka formula hai Lenth x height x width
  • Q5. Issue kitne parkar se hote hain Contractor issue Fuel issue General issue

Store Supervisor Interview Questions asked at other Companies

Q1. What are the importance of Specifications and Standards in a manufacturing company?
View answer (1)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Aug 2024.

Round 1 - HR 

(2 Questions)

  • Q1. Previous work progress
  • Q2. About documentation

Document Controller Interview Questions asked at other Companies

Q1. How many Engineering Documents will be process if you handle EPC project?
View answer (4)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(5 Questions)

  • Q1. Electrical engineer
  • Q2. Solar technician
  • Q3. Lisoining hand over take over
  • Q4. Erection testing commissioning
  • Q5. Row solve sub contractors billing
  • Ans. 

    To row solve sub contractors billing, ensure accurate tracking of work completed, materials used, and hours worked.

    • Maintain detailed records of work completed by each subcontractor

    • Verify invoices against work completed and materials used

    • Track hours worked by subcontractors to ensure accurate billing

    • Address any discrepancies or issues promptly to avoid delays in payment

  • Answered by AI

Senior Electrical Supervisor Interview Questions asked at other Companies

Q1. What are safely precautions you used in while working on height
View answer (4)

Megha Engineering & Infrastructures Interview FAQs

How many rounds are there in Megha Engineering & Infrastructures interview?
Megha Engineering & Infrastructures interview process usually has 1-2 rounds. The most common rounds in the Megha Engineering & Infrastructures interview process are Technical, Resume Shortlist and HR.
How to prepare for Megha Engineering & Infrastructures interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Megha Engineering & Infrastructures. The most common topics and skills that interviewers at Megha Engineering & Infrastructures expect are HSE, Refinery, thermal power plant, Safety and Safety Management.
What are the top questions asked in Megha Engineering & Infrastructures interview?

Some of the top questions asked at the Megha Engineering & Infrastructures interview -

  1. what is the meaning of M in M20,M25,M30 grade of concre...read more
  2. What is Critical Lifting (Erection activity) , Tandem Lifting please state its ...read more
  3. When you will perform Half or Full engine overhauli...read more
How long is the Megha Engineering & Infrastructures interview process?

The duration of Megha Engineering & Infrastructures interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Megha Engineering & Infrastructures Interview Process

based on 526 interviews

Interview experience

4.2
  
Good
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 413 Interviews
GMR Group Interview Questions
4.1
 • 78 Interviews
GAMMON INDIA Interview Questions
3.9
 • 29 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

Megha Engineering & Infrastructures Reviews and Ratings

based on 4.9k reviews

3.9/5

Rating in categories

3.7

Skill development

3.7

Work-life balance

3.6

Salary

3.8

Job security

3.6

Company culture

3.1

Promotions

3.6

Work satisfaction

Explore 4.9k Reviews and Ratings
Senior Engineer - QA/QC (Water Supply)

Uttar pradesh

5-10 Yrs

Not Disclosed

ROW Executive - Transmission Lines

Andhra pradesh

5-10 Yrs

Not Disclosed

Explore more jobs
Engineer
869 salaries
unlock blur

₹2.2 L/yr - ₹7 L/yr

Senior Engineer
849 salaries
unlock blur

₹3.2 L/yr - ₹11.5 L/yr

Associate Manager
511 salaries
unlock blur

₹4.8 L/yr - ₹15.5 L/yr

Mechanical Engineer
409 salaries
unlock blur

₹2 L/yr - ₹9 L/yr

Civil Engineer
339 salaries
unlock blur

₹2.2 L/yr - ₹8.2 L/yr

Explore more salaries
Compare Megha Engineering & Infrastructures with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

GMR Group

4.1
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview