Add office photos
Employer?
Claim Account for FREE

Megha Engineering & Infrastructures

3.9
based on 5k Reviews
Video summary
Filter interviews by

10+ IPL Biologicals Interview Questions and Answers

Updated 30 Dec 2024
Popular Designations

Q1. What is the procedure to start the earthen dam

Ans.

The procedure to start an earthen dam involves site selection, design, construction, and maintenance.

  • Site selection involves identifying a suitable location with adequate soil and water resources.

  • Design involves determining the dam's height, width, and slope, as well as spillway and outlet structures.

  • Construction involves excavating the foundation, building the embankment, and installing spillway and outlet structures.

  • Maintenance involves regular inspections, repairs, and mon...read more

View 2 more answers

Q2. Intial setting time of concrete

Ans.

Initial setting time of concrete is the time taken by the concrete to reach a particular degree of stiffness.

  • It is the time taken by the concrete to set and harden.

  • It is usually measured in hours and minutes.

  • The initial setting time of concrete is affected by factors such as temperature, humidity, and the type of cement used.

View 2 more answers

Q3. Least count of staff reading

Ans.

The least count of staff reading is the smallest measurement that can be read and recorded using the staff.

  • The least count is determined by the smallest division on the staff scale.

  • It is usually expressed in millimeters or centimeters.

  • For example, if the smallest division on the staff scale is 1 mm, then the least count is 1 mm.

  • The least count is important in accurately measuring and recording distances in civil engineering projects.

View 3 more answers

Q4. Bottom width of the dam

Ans.

Bottom width of the dam is the width of the base of the dam at its lowest point.

  • Bottom width is an important factor in determining the stability of the dam.

  • It is usually wider than the top width to provide a stable foundation.

  • The width varies depending on the height and type of dam.

  • For example, a concrete gravity dam may have a bottom width of 1/4 to 1/3 of its height.

  • A rockfill dam may have a bottom width of 1/2 to 2/3 of its height.

View 2 more answers
Discover IPL Biologicals interview dos and don'ts from real experiences

Q5. How to casting fast and quality of the work

Ans.

To cast fast and maintain quality, prioritize proper planning, use high-quality materials, ensure skilled labor, and implement quality control measures.

  • Proper planning is essential to streamline the casting process and avoid delays.

  • Use high-quality materials to ensure the durability and strength of the casted structure.

  • Skilled labor is crucial for precise casting and to avoid errors that may compromise quality.

  • Implement quality control measures such as regular inspections and...read more

Add your answer

Q6. Bund height of my previous job

Ans.

The bund height of my previous job was 3 meters.

  • The bund height refers to the height of an embankment or barrier constructed to contain or control the flow of liquids, such as water or chemicals.

  • In my previous job, I was responsible for designing and constructing a bund to contain hazardous materials.

  • The bund height of 3 meters was determined based on the volume and characteristics of the materials being stored.

  • I ensured that the bund was constructed according to relevant reg...read more

View 1 answer
Are these interview questions helpful?

Q7. What interests you about Civil Lines?

Ans.

I am fascinated by the impact Civil Lines have on urban development and infrastructure.

  • The opportunity to contribute to the design and construction of roads, bridges, and buildings

  • The challenge of ensuring safety and efficiency in infrastructure projects

  • The chance to work on projects that improve the quality of life for communities

  • The satisfaction of seeing tangible results of your work, such as a new bridge connecting neighborhoods

Add your answer

Q8. What is construction management

Ans.

Construction management involves planning, coordinating, and overseeing construction projects from start to finish.

  • Involves coordinating with architects, engineers, contractors, and other stakeholders

  • Includes scheduling, budgeting, quality control, and safety management

  • Responsible for ensuring projects are completed on time and within budget

  • Examples: creating project timelines, managing subcontractors, resolving construction issues

Add your answer
Share interview questions and help millions of jobseekers 🌟

Q9. What is Bar Bending schedule

Ans.

Bar Bending Schedule is a document that provides details of reinforcement steel bars used in a construction project.

  • It includes details like bar mark, type of bar, diameter, length, shape, and bending dimensions.

  • It helps in estimating the quantity of steel required for the project.

  • It is essential for ensuring proper reinforcement placement as per structural design.

  • Bar Bending Schedule is prepared based on structural drawings and specifications.

  • Example: Bar Bending Schedule fo...read more

Add your answer

Q10. How to manage department side

Ans.

Managing a department involves effective communication, delegation, organization, and leadership.

  • Establish clear goals and expectations for the department.

  • Communicate regularly with team members to ensure everyone is on the same page.

  • Delegate tasks based on individual strengths and skills.

  • Provide support and guidance to team members when needed.

  • Monitor progress and performance to address any issues promptly.

  • Lead by example and foster a positive work environment.

  • Encourage coll...read more

Add your answer

Q11. Minimum setting time of cement

Ans.

Minimum setting time of cement is the shortest time required for cement to harden and develop strength.

  • Minimum setting time varies depending on the type of cement and environmental conditions.

  • For example, ordinary Portland cement typically has a minimum setting time of 30 minutes.

  • Factors affecting setting time include temperature, water-cement ratio, and presence of additives.

  • Setting time can be tested using Vicat apparatus or penetration resistance method.

View 1 answer

Q12. Instrument used in surveying

Ans.

Theodolite is an instrument used in surveying to measure horizontal and vertical angles.

  • Theodolite is used to measure angles in both horizontal and vertical planes.

  • It consists of a telescope mounted on a base with graduated circles for precise measurements.

  • Theodolite is commonly used in construction, mapping, and land surveying.

  • Other instruments used in surveying include total stations, levels, and GPS receivers.

View 1 answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at IPL Biologicals

based on 17 interviews
2 Interview rounds
Technical Round - 1
Technical Round - 2
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Civil Engineer Interview Questions from Similar Companies

4.0
 • 20 Interview Questions
4.0
 • 20 Interview Questions
3.8
 • 12 Interview Questions
4.1
 • 12 Interview Questions
View all
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter