Q1. How much accepted 8mm to 10mm steel rod rolling margine value ?

Ans.

The accepted rolling margin value for 8mm to 10mm steel rods varies depending on the specific project requirements and industry standards.

  • The accepted rolling margin value can range from 2% to 5%.

  • It is important to consult project specifications and industry guidelines for the specific rolling margin value.

  • For example, if the rolling margin value is set at 3%, a 10mm steel rod could have a diameter between 9.7mm and 10.3mm.

  • The rolling margin value ensures that the steel rods ...read more

View 9 more answers

Q2. What types of equipment are used for leveling and what are the different types of surveys?

Ans.

Various types of equipment such as levels, theodolites, and total stations are used for leveling. Different types of surveys include topographic, construction, and boundary surveys.

  • Equipment used for leveling include levels, theodolites, and total stations

  • Levels are used for basic leveling tasks, theodolites for measuring angles and distances, and total stations for combined angle and distance measurements

  • Types of surveys include topographic surveys for mapping land features,...read more

Add your answer

Q3. Aluminium (mivan) structure sequence of activities?

Ans.

The sequence of activities for aluminium (mivan) structure construction involves several steps.

  • Preparing the site and marking the layout

  • Constructing the foundation and footings

  • Erecting the aluminium formwork panels

  • Fixing reinforcement bars and embedment items

  • Pouring concrete into the formwork

  • Curing the concrete

  • Stripping the formwork

  • Finishing and cleaning the structure

View 4 more answers

Q4. What is the unit used for estimating painting work?

Ans.

The unit used for estimating painting work is square feet.

  • Square feet is commonly used to estimate the amount of paint needed for a project.

  • Other units like square meters can also be used depending on the region.

  • Calculations are based on the surface area to be painted.

Add your answer
Discover Vanpeux Global Synergy interview dos and don'ts from real experiences

Q5. What are customer issues related to monsoon and how did you handle them ?

Ans.

Customer issues during monsoon were related to delayed deliveries and water damage. I handled them by ensuring timely communication and offering compensation.

  • Delayed deliveries due to heavy rain and flooding

  • Water damage to products during transit

  • Ensured timely communication with customers regarding delays

  • Offered compensation for damaged products

  • Implemented measures to prevent water damage during transit

Add your answer

Q6. What is mix of M20 grade of concrete

Ans.

M20 grade of concrete is a mix of 1:1.5:3 ratio of cement, sand, and aggregate.

  • M20 grade of concrete has a compressive strength of 20 MPa after 28 days.

  • The mix ratio for M20 grade concrete is 1:1.5:3 (cement:sand:aggregate).

  • It is commonly used for residential construction projects like flooring, beams, and columns.

Add your answer
Are these interview questions helpful?

Q7. What is the grade of concrete

Ans.

The grade of concrete refers to its strength and is determined by the ratio of cement to sand to aggregate.

  • The grade of concrete is typically denoted by a number followed by the letter 'M', such as M20, M30, etc.

  • The number in the grade represents the compressive strength of the concrete in megapascals (MPa) after 28 days of curing.

  • For example, M20 concrete has a compressive strength of 20 MPa, while M30 concrete has a compressive strength of 30 MPa.

  • Higher grade concrete (e.g....read more

Add your answer

Q8. What you mean by RL in survey

Ans.

RL in survey stands for Reduced Level, which is the vertical distance between a point and a reference point.

  • RL is used in surveying to determine the elevation of a point relative to a known reference point.

  • It is commonly used in construction projects to ensure accurate leveling of structures and surfaces.

  • RL can be calculated using leveling instruments such as a dumpy level or a theodolite.

  • For example, if a benchmark has an RL of 100 meters and a point on a site has an RL of 1...read more

Add your answer
Share interview questions and help millions of jobseekers 🌟

Q9. What is the full form of SBC

Ans.

SBC stands for Safe Bearing Capacity.

  • SBC is the maximum pressure that can be applied to the soil without causing shear failure.

  • It is an important factor in the design of foundations for structures.

  • Example: The SBC of a particular soil type is 200 kN/m^2.

Add your answer

Q10. What is the Diamter of TBM

Ans.

The diameter of a Tunnel Boring Machine (TBM) varies depending on the project requirements and can range from a few meters to over 15 meters.

  • The diameter of a TBM is typically determined by the size of the tunnel being constructed.

  • TBMs used for subway tunnels may have a smaller diameter compared to those used for large transportation tunnels.

  • Some TBMs can have diameters exceeding 15 meters for mega tunneling projects.

  • The diameter of a TBM can also impact the cost and efficien...read more

Add your answer

Q11. What is the RL in survey

Ans.

RL in survey stands for Reduced Level, which is the height of a point relative to a chosen reference point.

  • RL is used in surveying to determine the elevation of points on the ground.

  • It is usually measured in meters or feet above or below a specific reference point, such as a benchmark.

  • RL is important for designing drainage systems, roads, and buildings to ensure proper water flow and structural stability.

  • Example: If a benchmark has an RL of 100 meters, a point with an RL of 1...read more

Add your answer

Q12. What component of budget is expenses most during handover and after handover

Ans.

The expenses that are most significant during and after handover are typically related to staffing and training.

  • Staffing costs, such as hiring and training new employees, can be a significant expense during handover.

  • Training costs for existing employees to learn new systems or processes can also be a significant expense.

  • Other expenses may include equipment or technology upgrades, legal fees, and consulting fees.

  • After handover, ongoing staffing and training costs may continue ...read more

Add your answer

Q13. What is Full form of SBC

Ans.

SBC stands for Safe Bearing Capacity.

  • SBC is the maximum pressure that can be applied to the soil without risk of shear failure.

  • It is an important factor in the design of foundations for structures.

  • For example, if the SBC of a soil is 200 kN/m^2, it means that the soil can safely support a load of 200 kN per square meter.

Add your answer

Q14. What is full form of RCC

Ans.

Reinforced Cement Concrete

  • RCC stands for Reinforced Cement Concrete

  • It is a composite material made of cement, sand, aggregate, and steel reinforcement

  • RCC is commonly used in construction for its strength and durability

  • Examples of RCC structures include bridges, buildings, dams, and pavements

Add your answer

Q15. What is payback period?

Ans.

Payback period is the time it takes for an investment to generate enough cash flow to cover its initial cost.

  • Payback period is a financial metric used to evaluate the time it takes for an investment to recoup its initial cost.

  • It is calculated by dividing the initial investment by the annual cash inflows generated by the investment.

  • A shorter payback period is generally preferred as it indicates a quicker return on investment.

  • For example, if a project costs $100,000 and generat...read more

Add your answer

Q16. Find different RLs from the given figure

Ans.

Different RLs can be found by measuring the vertical distance between points on the figure.

  • Measure the vertical distance between points A and B to find RL AB

  • Measure the vertical distance between points C and D to find RL CD

  • Measure the vertical distance between points E and F to find RL EF

Add your answer

Q17. Density of steel, concrete, bricks

Ans.

Density of steel, concrete, bricks

  • Steel: 7850 kg/m^3

  • Concrete: 2400 kg/m^3

  • Bricks: 1900-2100 kg/m^3

Add your answer

Q18. What parameters who you to get feedback from customers

Ans.

We use various methods to gather feedback from customers.

  • We conduct surveys through email, phone, and in-person interactions.

  • We monitor social media platforms and online reviews.

  • We analyze customer complaints and suggestions.

  • We track sales data and customer retention rates.

  • We encourage customers to provide feedback through comment cards and online forms.

Add your answer

Q19. Unit Weight of Steel?

Ans.

The unit weight of steel refers to the weight of a given volume of steel material.

  • The unit weight of steel is typically measured in pounds per cubic foot or kilograms per cubic meter.

  • The specific unit weight of steel can vary depending on the type and grade of steel being used.

  • For example, the unit weight of structural steel is around 490 pounds per cubic foot or 7850 kilograms per cubic meter.

  • The unit weight of reinforcing steel bars, commonly known as rebars, is typically a...read more

View 3 more answers

Q20. Process of water treatment plant

Ans.

Water treatment plant process involves several steps to remove impurities and make water safe for consumption.

  • Coagulation: Chemicals are added to water to make impurities clump together.

  • Sedimentation: The clumped impurities settle at the bottom of the tank.

  • Filtration: Water passes through layers of sand, gravel, and charcoal to remove remaining impurities.

  • Disinfection: Chlorine or other chemicals are added to kill bacteria and viruses.

  • Storage: Treated water is stored in tanks...read more

Add your answer

Q21. Water proofing ponding test hours?

Ans.

Waterproofing ponding test hours determine the duration for which a waterproofing system can withstand water ponding.

  • Waterproofing ponding test hours measure the ability of a waterproofing system to resist water penetration under prolonged ponding conditions.

  • The test involves subjecting the waterproofing system to a specified water depth for a certain duration.

  • The duration of the test can vary depending on the project requirements and industry standards.

  • The test helps evaluat...read more

View 2 more answers

Q22. Finishing worksequence of activities?

Ans.

The finishing work sequence of activities involves the final steps in a construction project to complete the project and prepare it for use.

  • Inspecting and correcting any defects or deficiencies

  • Installing finishes such as flooring, paint, and fixtures

  • Completing final electrical and plumbing work

  • Cleaning and tidying up the site

  • Obtaining necessary permits and certifications

  • Conducting final inspections

  • Handing over the completed project to the client

View 1 answer

Q23. Which equipment can be used to determine the diameter of reinforcement bar at the site

Ans.

A caliper or a measuring tape can be used to determine the diameter of reinforcement bar at the site.

  • Caliper: A tool used to measure the diameter of round objects by clamping onto the bar and reading the measurement on the scale.

  • Measuring tape: Can be wrapped around the reinforcement bar to measure its diameter.

  • Ultrasonic thickness gauge: Can also be used to measure the diameter of reinforcement bars by sending ultrasonic waves through the material.

Add your answer

Q24. Different grades of concrete

Ans.

Different grades of concrete refer to the strength and quality of the concrete mix.

  • Different grades of concrete are designated by their strength in megapascals (MPa), such as M20, M30, etc.

  • Higher grade concrete has a higher strength and is typically used for structural purposes.

  • Lower grade concrete is suitable for non-structural applications like paving or flooring.

  • The mix proportions and ingredients vary for different grades of concrete.

  • For example, M20 concrete has a mix ra...read more

Add your answer

Q25. Different types Of cement.

Ans.

Different types of cement include Portland cement, rapid hardening cement, low heat cement, and sulfate resisting cement.

  • Portland cement is the most common type used in construction.

  • Rapid hardening cement sets quickly and gains strength faster than other types.

  • Low heat cement generates less heat during hydration, making it suitable for large concrete structures.

  • Sulfate resisting cement is used in environments with high sulfate content to prevent deterioration.

Add your answer

Q26. Please write down the sequence of works of construction and so on.

Ans.

The sequence of works in construction typically involves planning, site preparation, foundation work, structural construction, finishing touches, and final inspection.

  • Planning: Develop project plans, obtain permits, and create a timeline.

  • Site preparation: Clear the site, set up temporary facilities, and install utilities.

  • Foundation work: Excavate, pour footings, and construct foundation walls.

  • Structural construction: Build the framework, floors, walls, and roof.

  • Finishing touc...read more

Add your answer

Q27. Size of columns

Ans.

The size of columns in civil engineering is determined based on the load they will support and the height of the structure.

  • Columns are sized based on the load they will support, with larger loads requiring larger columns.

  • The height of the structure also plays a role in determining column size, with taller structures requiring larger columns for stability.

  • Factors such as material strength, column spacing, and building codes also influence column size.

  • Examples: In a high-rise b...read more

Add your answer

Q28. Density of steel

Ans.

Density of steel is approximately 7850 kg/m^3.

  • The density of steel is around 7850 kg/m^3.

  • Density can vary slightly depending on the type of steel.

  • Steel is a commonly used material in construction and engineering projects.

Add your answer

Q29. Types of cement

Ans.

Types of cement include Portland cement, white cement, rapid hardening cement, and low heat cement.

  • Portland cement is the most common type used in construction.

  • White cement is used for architectural purposes and to create colored concrete.

  • Rapid hardening cement sets quickly and is used in projects with tight deadlines.

  • Low heat cement generates less heat during hydration and is used in large concrete structures.

Add your answer

Q30. Types of Structure.

Ans.

Structures can be categorized into buildings, bridges, dams, towers, and tunnels.

  • Buildings: Residential, commercial, industrial

  • Bridges: Beam, arch, suspension

  • Dams: Gravity, arch, buttress

  • Towers: Communication, observation

  • Tunnels: Road, rail, water

Add your answer

Q31. Atd adjustment in a BWA that 665 kg whay not 660&670 as a 665 whay

Ans.

The weight adjustment in a BWA of 665 kg may not be exactly 660 or 670 due to various factors such as rounding errors, measurement precision, or specific requirements.

  • Rounding errors in measurements can lead to slight variations in the adjusted weight.

  • The specific requirements of the BWA may dictate a certain range of acceptable adjustments.

  • Measurement precision limitations may result in the adjustment not being exactly 660 or 670 kg.

Add your answer

Q32. Describe the planning process of construction of a building from start to end

Ans.

The planning process of construction involves various stages from design to completion.

  • Initial design phase where architects create blueprints and plans

  • Obtaining necessary permits and approvals from local authorities

  • Creating a detailed project schedule and budget

  • Hiring contractors and subcontractors for different aspects of construction

  • Procuring materials and equipment needed for the project

  • Breaking ground and starting the actual construction work

  • Regular inspections and quali...read more

Add your answer

Q33. Health faucet which hand provided right hand or laft hand

Add your answer

Q34. Briefing of sequence of activities in Planning/Scheduling of Project

Ans.

Planning/scheduling of project involves several activities that need to be sequenced properly.

  • Identify project scope and objectives

  • Breakdown project into smaller tasks

  • Determine task dependencies and sequence

  • Estimate task duration and resource requirements

  • Develop project schedule

  • Monitor and control project progress

Add your answer

Q35. What is the Standard Proctor Test?

Ans.

Standard Proctor Test is a laboratory method used to determine the optimal moisture content and maximum dry density of soil for compaction.

  • The test involves compacting a soil sample in a standard mold using a specified amount of energy.

  • Measurements are taken to determine the moisture content and density of the compacted soil.

  • The test helps in determining the compaction characteristics of soil for construction purposes.

  • Results of the test are used to establish the compaction c...read more

Add your answer

Q36. How many Limit switch in tower crane.?

Ans.

The number of limit switches in a tower crane varies depending on the specific model and manufacturer.

  • The number of limit switches in a tower crane can range from 2 to 6 or more.

  • Limit switches are used to prevent the crane from overtraveling in certain directions or reaching unsafe positions.

  • Common types of limit switches in tower cranes include hoisting limit switches, trolley limit switches, and slewing limit switches.

Add your answer

Q37. Lapping zone in columns & beams

Ans.

Lapping zone in columns & beams refers to the overlapping area where two reinforcement bars are spliced together.

  • Lapping zone is typically located at the mid-height of the column or beam.

  • It is important to ensure proper lapping length and overlap to maintain structural integrity.

  • Lapping zone should be free from rust, oil, grease, or any other contaminants.

  • Proper anchorage length should be provided to prevent failure at the lapping zone.

  • Example: In a reinforced concrete column...read more

Add your answer

Q38. SI Adjustment bracket to -mtr?

Ans.

Adjust the SI adjustment bracket to the meter

  • Adjust the bracket to match the meter reading accurately

  • Ensure the bracket is securely fastened to prevent any movement

  • Use appropriate tools and follow manufacturer's instructions for adjustment

Add your answer

Q39. How ur unload metal (bulk material)

Ans.

I unload metal bulk material using heavy machinery and following safety protocols.

  • Use forklifts or cranes to lift and move metal materials

  • Follow proper safety procedures to prevent accidents

  • Ensure proper storage of unloaded materials to prevent damage

  • Coordinate with team members to efficiently unload materials

  • Inspect materials for any damages or defects before storing

Add your answer

Q40. Define Pile Foundation and its types?

Ans.

Pile foundation is a type of deep foundation used to transfer loads from a structure to a stronger layer of soil or rock below.

  • Pile foundation is used when shallow foundations are not feasible due to weak soil conditions or high loads.

  • Types of pile foundations include driven piles, bored piles, and screw piles.

  • Driven piles are installed by driving them into the ground using impact hammers or vibratory hammers.

  • Bored piles are created by drilling a hole into the ground and fill...read more

Add your answer

Q41. Cutting length of beam

Ans.

Cutting length of a beam is the total length of the beam including the extra length required for bending and overlapping reinforcement.

  • Cutting length is calculated by adding the clear span of the beam to the development length of the reinforcement on both sides.

  • Extra length is added for bending and overlapping reinforcement to ensure proper strength and stability.

  • Proper calculation of cutting length is crucial for the structural integrity of the beam.

  • Example: If the clear spa...read more

Add your answer

Q42. Current CTC and Expected?

Ans.

Current CTC is INR 6 LPA and Expected CTC is INR 8 LPA.

  • Current CTC: INR 6 LPA

  • Expected CTC: INR 8 LPA

Add your answer

Q43. Soil bearing capacity

Ans.

Soil bearing capacity is the maximum load that the soil can safely support without undergoing excessive settlement.

  • Soil bearing capacity is influenced by factors such as soil type, moisture content, compaction, and depth.

  • It is important to determine the soil bearing capacity before designing foundations for structures.

  • Common methods to determine soil bearing capacity include plate load tests, standard penetration tests, and cone penetration tests.

Add your answer

Q44. Full form of SBC?

Ans.

SBC stands for Safe Bearing Capacity.

  • SBC is the maximum pressure that can be applied to the soil without causing shear failure.

  • It is an important parameter in geotechnical engineering for designing foundations.

  • SBC is determined through field tests like Standard Penetration Test (SPT) or Plate Load Test.

  • The value of SBC varies for different types of soil, such as clay, sand, or gravel.

Add your answer

Q45. Site experience in QA/QC

Ans.

I have 5 years of site experience in QA/QC, including managing inspections, audits, and documentation.

  • Managed and conducted inspections to ensure compliance with project specifications

  • Performed quality audits to identify areas for improvement and ensure adherence to quality standards

  • Maintained detailed documentation of all QA/QC activities and reported findings to management

  • Implemented corrective actions to address non-conformities and improve overall quality performance

Add your answer

Q46. Explain CPM.

Ans.

CPM stands for Critical Path Method, a project management technique used to identify the longest sequence of dependent activities to determine the minimum time needed to complete a project.

  • CPM helps in scheduling, organizing, and coordinating tasks within a project.

  • It identifies the critical path, which is the longest sequence of dependent activities that determines the shortest possible duration for completing the project.

  • CPM involves creating a network diagram to visualize ...read more

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at Vanpeux Global Synergy

based on 89 interviews
Interview experience
4.3
Good
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

3.4
 • 791 Interview Questions
3.8
 • 488 Interview Questions
3.8
 • 403 Interview Questions
4.2
 • 330 Interview Questions
3.8
 • 301 Interview Questions
3.8
 • 142 Interview Questions
View all
Top Kalpataru Limited Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter