Q1. 9) What is Regulating equipment and what is the purpose of it?
Regulating equipment is used to control the flow, pressure, or temperature of a system to maintain desired conditions.
Regulating equipment includes valves, regulators, controllers, and sensors.
The purpose of regulating equipment is to ensure that the system operates within specified parameters.
For example, a pressure regulator is used to maintain a constant pressure in a gas pipeline.
Another example is a thermostat that regulates the temperature in a heating system.
Q2. 1) Why portals are being used in OHE? 2) How many types of portals are being used in OHE? 3) Parts of Guy rod? 4) How many types of relation to be ised in Project planning??
Portals are used in OHE for easy access to information, different types of portals are used, guy rod consists of various parts, and different types of relationships are used in project planning.
Portals are used in OHE for easy access to information and communication among team members.
Types of portals used in OHE include project management portals, document sharing portals, and collaboration portals.
Parts of a guy rod include the rod itself, the anchor plate, the guy wire, an...read more
Assistant Manager Planning Interview Questions and Answers for Freshers
Q3. What is the difference between delete and dissolve in Primavera P6
Delete removes an activity from the project, while dissolve removes a relationship between activities.
Delete removes an activity from the project and all its relationships with other activities.
Dissolve removes a relationship between two activities, but the activities themselves remain in the project.
Deleting an activity can have a cascading effect on the rest of the project, while dissolving a relationship only affects the two activities involved.
For example, if Activity A i...read more
Q4. What about primavera, planning scheduling, planning tools? WHAT about quantity calculation, sub contractor bill, client bill ?
Primavera is a popular planning tool used for scheduling and quantity calculation, while subcontractor and client billing are essential aspects of project management.
Primavera is a widely used planning tool for creating schedules and managing resources in construction projects.
Planning tools help in creating timelines, assigning tasks, and tracking progress to ensure projects are completed on time.
Quantity calculation is crucial for determining the amount of materials needed ...read more
Q5. 5) How many tyoes of foundation are beings used in OHE? 6) List out the parts of Bracket Assembly? 7) How many tyoes of Insulator are being used in OHE??
Different types of foundations, parts of Bracket Assembly, and types of insulators used in OHE.
Types of foundations used in OHE: Direct Embedment, Pile Foundation, Raft Foundation, etc.
Parts of Bracket Assembly: Bracket, Insulator, Clamp, Bolts, Nuts, etc.
Types of insulators used in OHE: Pin Type Insulator, Suspension Type Insulator, Strain Type Insulator, etc.
Q6. How to plan 2 lacs Cum concrete in 1 year. How many RMC to deploy for the same work.
To plan 2 lacs Cum concrete in 1 year, calculate daily production target and number of RMC plants needed.
Calculate daily production target by dividing total volume by number of working days in a year
Determine the capacity of each RMC plant and divide the daily production target by it to find out how many plants are needed
Consider factors like downtime, maintenance, and transportation in your planning
Share interview questions and help millions of jobseekers 🌟
Q7. 10) What is the size of Contact and Catenary wire??
The size of Contact and Catenary wire varies depending on the specific application and requirements.
Contact wire typically ranges from 10 mm to 14 mm in diameter
Catenary wire can range from 7 mm to 12 mm in diameter
The size of the wire is determined by factors such as the weight it needs to support and the amount of current it needs to carry
Q8. How can you manage supply and demand and plan accordingly.
Managing supply and demand involves forecasting, monitoring inventory levels, adjusting production schedules, and collaborating with sales and marketing teams.
Forecast demand based on historical data, market trends, and customer feedback.
Monitor inventory levels to ensure sufficient stock to meet demand without excess inventory.
Adjust production schedules based on demand forecasts and inventory levels.
Collaborate with sales and marketing teams to align supply with demand and ...read more
Assistant Manager Planning Jobs
Q9. Will you be able to manage site
Yes, I have experience managing sites and coordinating with various stakeholders.
I have successfully managed multiple construction sites simultaneously
I have coordinated with contractors, vendors, and clients to ensure project timelines are met
I have experience in resolving site-related issues and ensuring compliance with safety regulations
Q10. Do you know MS project software ?
Yes, I am familiar with MS Project software.
I have used MS Project to create and manage project schedules.
I am proficient in creating tasks, assigning resources, and tracking progress.
I have experience in generating reports and analyzing project data using MS Project.
I am also familiar with other project management tools such as Trello and Asana.
Q11. Would you have worked any substation project ?
Yes, I have worked on multiple substation projects.
I have experience working on substation projects in my previous role as a Planning Assistant.
I have successfully managed the planning and execution of substation projects, ensuring timely completion and adherence to budget.
I have collaborated with cross-functional teams, including engineers, contractors, and stakeholders, to ensure smooth project delivery.
I have knowledge of substation design, equipment installation, and comm...read more
Q12. What is crash time and how it is implemented
Crash time is the shortest possible time in which a project can be completed by assigning additional resources.
Crash time helps in speeding up project completion by adding more resources to critical path activities
It involves identifying critical activities that can be shortened without affecting the project timeline
Crash time is implemented by adding extra resources, working overtime, or fast-tracking activities
Example: If a construction project is behind schedule, the proje...read more
Q13. Briefing of sequence of activities in Planning/Scheduling of Project
Planning/scheduling of project involves several activities that need to be sequenced properly.
Identify project scope and objectives
Breakdown project into smaller tasks
Determine task dependencies and sequence
Estimate task duration and resource requirements
Develop project schedule
Monitor and control project progress
Q14. Do you Method Statements
Method statements are detailed descriptions of how a task will be carried out, including the necessary resources and procedures.
Method statements outline the steps, resources, and procedures required to complete a task safely and efficiently.
They are commonly used in construction and engineering projects to ensure work is carried out in a systematic and organized manner.
Method statements help identify potential hazards and risks, and outline control measures to mitigate them....read more
Q15. 8) What is the purpose of Anticreep?
Anticreep is a feature in gas turbines that prevents the rotor from creeping during shutdown.
Prevents rotor from moving slowly during shutdown
Helps maintain proper alignment of components
Reduces wear and tear on turbine parts
Improves overall efficiency and performance of the turbine
Q16. What is schedule crashing
Schedule crashing is a technique used in project management to shorten the project duration without changing the scope of work.
Schedule crashing involves adding more resources to critical path activities to reduce their duration.
It may involve working overtime, hiring additional staff, or using more efficient equipment.
The goal of schedule crashing is to meet project deadlines or finish the project earlier than planned.
For example, if a construction project is behind schedule...read more
Q17. What is SCM, explain inventory planning.
SCM stands for Supply Chain Management. Inventory planning involves forecasting demand, determining optimal inventory levels, and managing stock levels.
SCM involves the coordination of all activities involved in sourcing, procurement, production, and logistics.
Inventory planning includes forecasting demand based on historical data, market trends, and customer preferences.
Determining optimal inventory levels involves balancing the costs of holding inventory against the costs o...read more
Q18. What is use of SQL in data analytics.
SQL is used in data analytics to query, manipulate, and analyze data stored in databases.
SQL is used to retrieve data from databases using queries.
It can be used to filter, sort, and aggregate data for analysis.
SQL can also be used to join multiple tables to combine data from different sources.
Common SQL functions like SUM, AVG, COUNT, etc. are used in data analytics.
Example: SELECT * FROM sales_data WHERE date BETWEEN '2021-01-01' AND '2021-12-31';
Q19. How do you take up schedule time line
I prioritize tasks based on urgency and importance to create a realistic schedule timeline.
Evaluate the scope of the project and break it down into smaller tasks
Estimate the time required for each task and allocate resources accordingly
Consider dependencies between tasks and adjust the schedule as needed
Regularly monitor progress and make adjustments to the timeline as necessary
Q20. Do you know SAP software ?
Yes, I have experience working with SAP software.
I have used SAP for inventory management and production planning.
I am familiar with SAP modules such as MM, PP, and SD.
I have also worked on SAP implementation projects.
I am comfortable using SAP reports and analyzing data.
I have received training on SAP and have a good understanding of its functionalities.
Q21. MS Program cost schedule
The MS Program cost schedule outlines the expenses associated with the program over time.
The cost schedule should include tuition fees, books, materials, and any other expenses
It should also outline payment deadlines and any available financial aid options
Regularly review and update the cost schedule to ensure accuracy and transparency
Q22. how to tracking the progress of work
Progress of work can be tracked through regular updates, milestones, and key performance indicators.
Regularly update project timelines and task lists
Set milestones to track progress towards larger goals
Monitor key performance indicators to measure success and identify areas for improvement
Q23. 11) Explain bonding and its purpose??
Bonding is the process of creating a strong emotional connection between individuals, often through shared experiences and mutual trust.
Bonding helps to build trust and loyalty among team members
It fosters collaboration and communication within a group
Bonding can improve morale and motivation in the workplace
Examples include team-building activities, group projects, and social events
Q24. Extension of time frame in operation
Extension of time frame in operation allows for flexibility and adjustment to meet changing needs.
Extension of time frame can be necessary due to unforeseen circumstances or delays.
It allows for more thorough planning and implementation of strategies.
Examples include extending a project deadline to accommodate additional research or adjusting a production schedule to meet increased demand.
Q25. Tell us about EOT proposal
EOT proposal is a request for an extension of time in a construction project due to delays beyond the contractor's control.
EOT stands for Extension of Time.
It is a formal request made by the contractor to the client or project owner.
The request is usually accompanied by supporting documentation such as delay analysis reports, weather reports, and other relevant evidence.
EOT proposals are typically reviewed by the project team and may require approval from the client or contra...read more
Q26. How you prepare programme
I prepare programme by identifying objectives, breaking them down into tasks, assigning resources and setting timelines.
Identify objectives and goals
Break down objectives into smaller tasks
Assign resources and responsibilities to team members
Set timelines and deadlines for each task
Regularly review and update the programme to ensure progress is on track
Q27. Scaffolding time line for deshuttering
The scaffolding time line for deshuttering involves planning and coordination to ensure safe and efficient removal of scaffolding.
Create a detailed schedule outlining when each section of scaffolding will be removed
Coordinate with the construction team to ensure deshuttering aligns with project timelines
Consider factors such as weather conditions and safety regulations when planning the deshuttering process
Q28. How to track commodity prices
Commodity prices can be tracked through various sources and methods.
Use online platforms like Bloomberg, Reuters, and Yahoo Finance to track commodity prices.
Follow commodity market news and reports to stay updated on price trends.
Monitor supply and demand factors that affect commodity prices.
Track commodity futures and options contracts to anticipate price movements.
Utilize data analysis tools to identify patterns and forecast future prices.
Collaborate with industry experts ...read more
Q29. Latest technology in construction.
The latest technology in construction includes 3D printing, drones, and Building Information Modeling (BIM).
3D printing allows for faster and more efficient construction of complex structures.
Drones can be used for site inspections, surveying, and monitoring progress.
BIM is a digital representation of a building that allows for better collaboration and communication among stakeholders.
Other technologies include virtual and augmented reality, prefabrication, and robotics.
Q30. What is Lead Time
Lead time is the amount of time it takes for a product to be delivered after an order is placed.
Lead time includes processing, production, and delivery time.
It helps in planning inventory levels and production schedules.
Short lead times are preferred to reduce waiting time for customers.
Example: If a product has a lead time of 2 weeks, it means it will be delivered 2 weeks after the order is placed.
Q31. Project Planning Process
Project planning process involves defining project scope, creating a schedule, allocating resources, and monitoring progress.
Define project scope and objectives
Create a project schedule with milestones and deadlines
Allocate resources such as budget, manpower, and materials
Monitor progress and make adjustments as needed
Communicate with stakeholders regularly
Interview experiences of popular companies
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month