Upload Button Icon Add office photos

Filter interviews by

Ivrcl Infrastructures & Projects Interview Questions, Process, and Tips

Updated 25 Jan 2025

Top Ivrcl Infrastructures & Projects Interview Questions and Answers

View all 6 questions

Ivrcl Infrastructures & Projects Interview Experiences

Popular Designations

5 interviews found

Store Keeper Interview Questions & Answers

user image Pritam Singh Panwar

posted on 25 Jan 2025

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Can you provide details about your experience at your previous companies, specifically Ashoka Buildcon Limited in Nashik and Anuj
  • Ans. 

    I have 3 years of experience as a Store Keeper at Ashoka Buildcon Limited in Nashik and Anuj.

    • Managed inventory and stock levels at both companies

    • Handled incoming and outgoing shipments

    • Maintained accurate records of all transactions

    • Collaborated with procurement team to ensure timely supply of materials

  • Answered by AI

Store Keeper Interview Questions asked at other Companies

Q1. What is the process of material receiving??
View answer (4)

Interview Questionnaire 

4 Questions

  • Q1. How many types of fire extinguishers.
  • Ans. 

    There are five main types of fire extinguishers.

    • Water extinguishers are suitable for Class A fires involving solid materials like wood or paper.

    • Foam extinguishers are effective on Class A and B fires, which involve flammable liquids like gasoline or oil.

    • Carbon dioxide (CO2) extinguishers are used for Class B and electrical fires.

    • Dry powder extinguishers can be used on Class A, B, C, and electrical fires.

    • Wet chemical ex...

  • Answered by AI
  • Q2. How many types of safety guards.
  • Ans. 

    There are several types of safety guards used in various industries to protect workers and prevent accidents.

    • Machine guards: Used to protect workers from moving parts of machinery.

    • Fall protection guards: Used to prevent falls from heights, such as guardrails and safety nets.

    • Electrical guards: Used to protect against electrical hazards, such as insulated gloves and barriers.

    • Chemical guards: Used to protect against chemi...

  • Answered by AI
  • Q3. What accident investigation.?
  • Ans. 

    Accident investigation is the process of identifying the root cause of an accident and implementing corrective actions to prevent future occurrences.

    • Accident investigation involves gathering information about the accident, interviewing witnesses and involved parties, and analyzing the data to determine the cause.

    • The investigation should focus on identifying the root cause of the accident, rather than just the immediate...

  • Answered by AI
  • Q4. What is height work?
  • Ans. 

    Height work refers to any work that is performed at a height above ground level.

    • It involves working on ladders, scaffolds, roofs, or any elevated surface.

    • It requires proper safety equipment such as harnesses, helmets, and safety ropes.

    • Workers must be trained in proper safety procedures and techniques.

    • Examples include window cleaning, construction work, and tree trimming.

    • Height work can be dangerous and requires careful

  • Answered by AI

Safety Officer/Manager Interview Questions asked at other Companies

Q1. What is Hirachi of Hazard control
View answer (6)

I applied via Walk-in

Interview Questionnaire 

2 Questions

  • Q1. About Costing per KM for construction of Road Work
  • Q2. Framing of Maintenance of Books of Accounts
  • Ans. 

    Maintenance of Books of Accounts is the process of recording financial transactions of a business.

    • It involves recording all financial transactions accurately and in a timely manner.

    • The books of accounts should be maintained in accordance with the applicable accounting standards and laws.

    • The books of accounts should be reconciled regularly to ensure accuracy.

    • The books of accounts should be kept safe and secure.

    • Examples ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Company is not good position since nclt progress

Accounts Officer Interview Questions asked at other Companies

Q1. How can you handle entire accounts section give me some examples?
View answer (9)

I applied via Walk-in and was interviewed before Jul 2019. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. Roles and responsibility of HSE Supervisor/ Officer?
  • Ans. 

    HSE Supervisor/Officer is responsible for ensuring compliance with health, safety, and environmental regulations in the workplace.

    • Developing and implementing safety policies and procedures

    • Conducting regular inspections and audits to identify potential hazards

    • Training employees on safety protocols and emergency procedures

    • Investigating accidents and incidents to determine root causes and prevent future occurrences

    • Maintai...

  • Answered by AI
  • Q2. How can you manage with site Team for follow the safety rules?
  • Ans. 

    To manage with site team for following safety rules, effective communication, training, and enforcement are key.

    • Establish clear safety policies and procedures

    • Communicate the importance of safety to the team

    • Provide regular safety training and education

    • Lead by example and consistently enforce safety rules

    • Encourage reporting of safety concerns and near misses

    • Conduct regular safety inspections and audits

    • Recognize and rewar...

  • Answered by AI
  • Q3. If any incident/ Accident occurred what action you will be taken?

Interview Preparation Tips

Interview preparation tips for other job seekers - Learn the subject and do the hard work for bright future purpose,
Time management,
Change the Attitude,
Commitment ,
Self motivation - Self Confidence

Safety Supervisor Interview Questions asked at other Companies

Q1. 1> What is Difference between Accident v/s Incident ? 2> What is Hazard ? 3> What is fire and types of Fire ? 4> Tell me about Confined Space ? 5> what is near Miss ? 6> What Is Excavation Safety ? 7> What is work permi... read more
View answer (3)

Ivrcl Infrastructures & Projects interview questions for popular designations

 Safety Supervisor

 (1)

 Accounts Officer

 (1)

 Safety Officer/Manager

 (1)

 HR Officer

 (1)

 Store Keeper

 (1)

HR Officer Interview Questions & Answers

user image MATCHA SURESH

posted on 17 Jul 2017

I appeared for an interview in Oct 2016.

Interview Preparation Tips

Round: Resume Shortlist
Experience: Educational Related...

Round: Group Discussion
Experience: NA
Duration: 1 hour 30 minutes

HR Officer Interview Questions asked at other Companies

Q1. Do you have prior knowledge to work in SAP modules?
View answer (3)

Interview questions from similar companies

I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Load distribution under rigid and flexible footings,water tank design, steel foundation design
  • Q2. Mix design of concrete, btech project
  • Ans. 

    Mix design of concrete and BTech project

    • Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete

    • Factors like strength, workability, durability, and cost are considered while designing the mix

    • BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design

    • Examples of BTech projects...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be well prepared with basics and if you are already experienced, be prepared with site knowledge

Interview Questionnaire 

3 Questions

  • Q1. How many time u take any update shuttering system?
  • Ans. 

    The question is unclear and lacks context.

    • Please provide more information about the 'update shuttering system'.

    • Specify the time frame for the updates.

    • Clarify the purpose or objective of the updates.

    • Provide any relevant examples or scenarios.

  • Answered by AI
  • Q2. Why u want to work as a execution engineer? Why not any special team such as formwork team,or quality team?
  • Ans. 

    I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.

    • As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.

    • I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.

    • While working on a formwork or quality team would be valuable experi...

  • Answered by AI
  • Q3. As contractor farm Engineer in RCC which is most important? 1) Reinforcements 2)Formwork 3)Concrete And why?
  • Ans. 

    Concrete is the most important as it provides the strength and durability to the structure.

    • Concrete is the backbone of any RCC structure.

    • It provides the strength and durability to the structure.

    • Reinforcements and formwork are important too, but without concrete, they are useless.

    • Proper mix design and curing of concrete are crucial for the longevity of the structure.

  • Answered by AI

I applied via Naukri.com and was interviewed before Aug 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. How to start a new project ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Just say what are you doing in the past and what you can do.

I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. About my previous experience, and my scope of work?
  • Q2. Areas of strengths and areas need to develop

Interview Preparation Tips

Interview preparation tips for other job seekers - The interview consisting of two rounds, first is about my personal details, which is intervied by Hr person. the second round is technical one, which was taken by Project director of the particular project. So i advice everyone be confident what you answering them, all the questions were asked about my experience part, and the knowledge what i have gained during the work apart from my education life. They also check all my documents. After completion of my interview and after 1 month, i got the offer letter of this company. Now iam so happy for this achievement. I hope all of the others who were attending for the interviews, hope you all get placed.

Thanks and Regards
Rahman

I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What is the most challenging situation you have been through in your career?

Interview Preparation Tips

Interview preparation tips for other job seekers - To ace an interview you need to be a good listener as much as a good speaker. Try to listen and understand what the interviewer is asking and then reply. Never be in a hurry to answer, take time. If you did not understand what interviewer is asking simply ask him to repeat, pls don't presume anything and answer anything that comes to your mind. Most importantly never fake in an interview just try to be your best...

Ivrcl Infrastructures & Projects Interview FAQs

How many rounds are there in Ivrcl Infrastructures & Projects interview?
Ivrcl Infrastructures & Projects interview process usually has 1 rounds. The most common rounds in the Ivrcl Infrastructures & Projects interview process are Technical.
How to prepare for Ivrcl Infrastructures & Projects interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Ivrcl Infrastructures & Projects. The most common topics and skills that interviewers at Ivrcl Infrastructures & Projects expect are Advocacy, Data Analysis, MM, SAP Netweaver and XML.
What are the top questions asked in Ivrcl Infrastructures & Projects interview?

Some of the top questions asked at the Ivrcl Infrastructures & Projects interview -

  1. How can you manage with site Team for follow the safety rule...read more
  2. How many types of fire extinguisher...read more
  3. How many types of safety guard...read more

Tell us how to improve this page.

Ivrcl Infrastructures & Projects Interview Process

based on 5 interviews

Interview experience

5
  
Excellent
View more

Ivrcl Infrastructures & Projects Reviews and Ratings

based on 462 reviews

4.2/5

Rating in categories

3.7

Skill development

4.0

Work-life balance

3.6

Salary

3.9

Job security

4.0

Company culture

3.4

Promotions

4.0

Work satisfaction

Explore 462 Reviews and Ratings
Assistant Manager
26 salaries
unlock blur

₹5.2 L/yr - ₹9.6 L/yr

Assistant Engineer
24 salaries
unlock blur

₹1.5 L/yr - ₹6 L/yr

Senior Store Assistant
17 salaries
unlock blur

₹2.2 L/yr - ₹2.5 L/yr

Senior Engineer
16 salaries
unlock blur

₹5.2 L/yr - ₹8.1 L/yr

Accounts Officer
13 salaries
unlock blur

₹4 L/yr - ₹5.6 L/yr

Explore more salaries
Compare Ivrcl Infrastructures & Projects with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.4
Compare

ITD Cementation India

4.3
Compare

Ashoka Buildcon

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview