Upload Button Icon Add office photos

Ashoka Buildcon

Compare button icon Compare button icon Compare

Filter interviews by

Ashoka Buildcon Interview Questions, Process, and Tips

Updated 22 Feb 2025

Top Ashoka Buildcon Interview Questions and Answers

View all 49 questions

Ashoka Buildcon Interview Experiences

Popular Designations

65 interviews found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(5 Questions)

  • Q1. What is embackment & Earthwork process
  • Ans. 

    Embankment is a raised bank or wall built to carry a road or to hold back water.

    • Embankment is a raised structure made of earth or other materials to support a road or railway.

    • Earthwork process involves moving, processing, and placing soil or rock to create embankments, excavations, or other earth structures.

    • Embankments are commonly used in road construction to elevate the road above the surrounding terrain.

    • Earthwork pr...

  • Answered by AI
  • Q2. What is PQC laying
  • Ans. 

    PQC laying stands for Pavement Quality Concrete laying, which is the final layer of concrete pavement on roads.

    • PQC laying is the process of laying the final layer of concrete pavement on roads.

    • It is done after the base and sub-base layers have been prepared and compacted.

    • PQC laying ensures a smooth and durable surface for vehicles to travel on.

    • Proper curing of PQC is essential to prevent cracks and ensure longevity.

    • Exa...

  • Answered by AI
  • Q3. What is RCC drain
  • Ans. 

    RCC drain is a reinforced concrete drain used for efficient drainage of rainwater or wastewater.

    • RCC drain is made of reinforced concrete to provide strength and durability.

    • It is used to efficiently channel rainwater or wastewater away from roads, buildings, or other structures.

    • RCC drains come in various shapes and sizes depending on the specific drainage requirements.

    • These drains are commonly used in urban areas to pre...

  • Answered by AI
  • Q4. What is Kerb laying
  • Ans. 

    Kerb laying is the process of installing and positioning curbs along the edges of roads or pavements.

    • Kerb laying involves setting out the alignment and levels for the curbs.

    • The curbs are then placed and fixed in position using concrete or other suitable materials.

    • Kerb laying helps define the edges of roads, provide structural support, and prevent vehicles from driving off the road.

    • Properly laid curbs enhance the overal...

  • Answered by AI
  • Q5. What isKerb painting and road marking
  • Ans. 

    Kerb painting and road marking are techniques used to designate specific areas on roads for various purposes.

    • Kerb painting involves painting the edges of the road, usually in a specific color, to indicate parking restrictions, loading zones, or pedestrian crossings.

    • Road marking includes painting lines, symbols, and signs on the road surface to guide traffic, indicate lanes, show pedestrian crossings, and warn of hazard...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

B Tech Civil Engineer Interview Questions asked at other Companies

Q1. What is the process of earthquake design of a multi storey building?
View answer (2)

Deputy General Manager Interview Questions & Answers

user image Rajendra Vishwanath Tekade

posted on 7 Aug 2024

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Experience Type & Job Responsibility
  • Q2. Regarding Education & Previous Experience
  • Q3. Technical Experience & Knowledge of Past Organization
  • Q4. Salary Negotiations
  • Q5. Finalization of CTC with respect to Posting Order location
  • Ans. 

    Finalizing CTC involves considering various factors like cost of living, market rates, company budget, and employee qualifications.

    • Consider cost of living in the location of posting

    • Compare market rates for similar positions in the area

    • Ensure the CTC fits within the company's budget constraints

    • Take into account the qualifications and experience of the employee

    • Negotiate if necessary to reach a mutually beneficial CTC

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to Improve on Multiple Type of Answer's for Interview

Deputy General Manager Interview Questions asked at other Companies

Q1. Share list of controls which are required to safe guard the organizations from perimeter to end points.
View answer (2)
Ashoka Buildcon Interview Questions and Answers for Freshers
illustration image
Interview experience
3
Average
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected
Round 1 - One-on-one 

(2 Questions)

  • Q1. Tell about yourself
  • Ans. 

    I am a motivated and detail-oriented individual with a background in business consulting and a passion for problem-solving.

    • Background in business consulting

    • Strong problem-solving skills

    • Motivated and detail-oriented

    • Excellent communication skills

    • Experience working in cross-functional teams

  • Answered by AI
  • Q2. Tell something About your project
  • Ans. 

    Developed a project management tool for tracking tasks and deadlines

    • Implemented user-friendly interface for easy task management

    • Integrated calendar feature for scheduling deadlines

    • Generated reports for tracking project progress

    • Utilized agile methodology for project development

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Transformers ratings
  • Q2. Basic questions about distri

Interview Preparation Tips

Interview preparation tips for other job seekers - Ets a simple interview for freshers they ask about Transformer and distribution basic questions and ask about XL knowledge and also ask if you completed SAP Course

Junior Consultant Interview Questions asked at other Companies

Q1. Difference between standard and custom objects? Difference between flow and process builder, and which is better in which way? What are triggers? Write a basic trigger to update contacts from account when certain changes are made. Security ... read more
View answer (2)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. About yourself and your qualification
  • Q2. Salary and past experience
Round 2 - Technical 

(3 Questions)

  • Q1. Depends on your field. In which you are expert
  • Q2. Commonly it's depends on post applied
  • Q3. Management skills

Ashoka Buildcon interview questions for popular designations

 Highway Engineer

 (2)

 Senior Engineer

 (2)

 Civil Structural Engineer

 (2)

 Safety Officer

 (2)

 Electrical Engineer

 (2)

 Senior Project Executive

 (2)

 Junior Officer

 (2)

 Civil Site Engineer

 (2)

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Jun 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. Related to contracts and management core
  • Q2. What is your understanding of FIDIC, specifically regarding compliance, delay events, and the relevant articles in the contract? Additionally, what types of contracts have you previously handled?
  • Ans. 

    FIDIC is a standard form of contract used in the construction industry, covering compliance, delay events, and relevant articles.

    • FIDIC stands for International Federation of Consulting Engineers

    • It provides a framework for construction contracts, including compliance requirements and procedures for handling delay events

    • Key articles in FIDIC contracts include those related to variations, claims, and dispute resolution

    • I h...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It is suitable for long-term commitment, but the work pressure is moderate, and the mental strain to meet strict expectations is excessive.

Management Trainee Interview Questions asked at other Companies

Q1. What do you mean by balance sheet reconciliation could you explain briefly?
View answer (45)

Get interview-ready with Top Ashoka Buildcon Interview Questions

Associate Consultant Interview Questions & Answers

user image ASHISH KR. YADAV

posted on 15 Jul 2024

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jun 2024. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Introduce yourself
  • Q2. How fluent are you in english
Round 2 - Technical 

(2 Questions)

  • Q1. Treatment of depreciation
  • Ans. 

    Depreciation is the allocation of the cost of a tangible asset over its useful life.

    • Depreciation is a non-cash expense that reduces the value of an asset over time.

    • Common methods of depreciation include straight-line, double-declining balance, and units of production.

    • Depreciation is important for accurately reflecting the true value of assets on the balance sheet.

    • It is crucial for financial reporting and tax purposes.

    • D...

  • Answered by AI
  • Q2. Treatment of govt grant
  • Ans. 

    Government grants are typically recognized as income when they are received, but may need to be recognized as deferred income and recognized over time if they are intended to fund specific future expenses.

    • Government grants are usually recognized as income when received

    • However, if the grant is intended to fund specific future expenses, it may need to be recognized as deferred income and recognized over time

    • The treatment...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Should have good knowledge about the Domain you have mentioned in the Cv

Associate Consultant Interview Questions asked at other Companies

Q1. There are 2 cricket teams, A and B, with 11 players each. If every player of team A shakes hands with every player of team B(once), what will be the total number of handshakes?
View answer (15)

Jobs at Ashoka Buildcon

View all
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Survey related questions an salary discuss.

Interview Preparation Tips

Interview preparation tips for other job seekers - If you want to join this company, think carefully.

Survey Engineer Interview Questions asked at other Companies

Q1. What's is traversing, and describe it how to it calculate data.....
View answer (1)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. About Basic Knowledge
  • Q2. What You Studies and about your experience
Round 2 - Technical 

(2 Questions)

  • Q1. Not specific Questions
  • Q2. Depend upon your knowledge and experience you must share with them

Interview Preparation Tips

Interview preparation tips for other job seekers - You need strong Basics if you are fresher and If you are experiance person then it's cherry on top

Quantity Surveyor Interview Questions asked at other Companies

Q1. What will you do if the site qty differ from Drawing qty
View answer (8)

Interview Questions & Answers

user image Rajendra Vishwanath Tekade

posted on 10 Dec 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Nov 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all Resume tips
Round 2 - Technical 

(4 Questions)

  • Q1. Past Experience for 33years Project Operations
  • Ans. 

    I have 33 years of experience in Project Operations, leading successful projects from start to finish.

    • Led project teams to deliver successful outcomes within budget and timeline

    • Implemented efficient project management processes to streamline operations

    • Managed stakeholder relationships to ensure project alignment with organizational goals

    • Utilized risk management strategies to mitigate project challenges

    • Implemented innov

  • Answered by AI
  • Q2. Having All Type of Experience like Billing,Costing,Execution of All Type of Structural Work's, Finishing Work's, Precast Work's, Industrial & Residential Building/Commercial, Power Plant/Academic Build...
  • Q3. Handled All Type of Private/Government Projects from Start to End ...
  • Q4. Completed Most of Projects from Start to End with Good interms of Quality, Safety with Timely Completion
Round 3 - HR 

(2 Questions)

  • Q1. Considering CTC Morethan Earlier Organization
  • Q2. Negotiations with HR About CTC & Take Home Salary & Organization Structures

Interview Preparation Tips

Topics to prepare for Ashoka Buildcon interview:
  • EPGPM
  • Benefits
  • Big Organization
  • System Organization
  • Timely
  • Payment Processing
Interview preparation tips for other job seekers - Every One Can Be Join As Big & Known Organization of India
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Oct 2023. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Gragation. + I.T.I
  • Q2. Electrician Sivil
Round 3 - Technical 

(1 Question)

  • Q1. G.s.b work in highway 3D sistem (Trimble) Work experience 3 year Present time job assistant surveyor Ashoka buildcon Railway project in Chasma Gujarat
  • Ans. 

    Yes, I have 3 years of experience working with G.s.b in highway 3D system (Trimble) as an assistant surveyor on a railway project in Chasma, Gujarat.

    • Experience working with G.s.b in highway 3D system (Trimble) for 3 years

    • Currently working as an assistant surveyor at Ashoka Buildcon on a railway project in Chasma, Gujarat

  • Answered by AI
Round 4 - Technical 

(1 Question)

  • Q1. ITI pass NCVT
Round 5 - Technical 

(2 Questions)

  • Q1. ITI pass NCVT 2 year
  • Q2. G s b work experience highway

Highway Supervisor Interview Questions asked at other Companies

Q1. G.s.b work in highway 3D sistem (Trimble) Work experience 3 year Present time job assistant surveyor Ashoka buildcon Railway project in Chasma Gujarat
View answer (1)
Contribute & help others!
anonymous
You can choose to be anonymous

Ashoka Buildcon Interview FAQs

How many rounds are there in Ashoka Buildcon interview?
Ashoka Buildcon interview process usually has 1-2 rounds. The most common rounds in the Ashoka Buildcon interview process are Technical, Resume Shortlist and HR.
How to prepare for Ashoka Buildcon interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Ashoka Buildcon. The most common topics and skills that interviewers at Ashoka Buildcon expect are Project Management, Civil Engineering, AutoCAD, Accounting and Business Development.
What are the top questions asked in Ashoka Buildcon interview?

Some of the top questions asked at the Ashoka Buildcon interview -

  1. Design procedure of PQC:- Use M40 grade concrete. 1:- The minimum cement c...read more
  2. DESINGN PROCEDURE :- 1:- Use M15 grade concrete. Aggregate and cement ratio 1...read more
  3. Flexible pavement:- 1:- EMBANKMENT:- Take thicknesses 3m approximately as per s...read more
How long is the Ashoka Buildcon interview process?

The duration of Ashoka Buildcon interview process can vary, but typically it takes about less than 2 weeks to complete.

Recently Viewed

LIST OF COMPANIES

Intellect Design Arena

Overview

INTERVIEWS

ServiceNow

No Interviews

SALARIES

Persistent Systems

INTERVIEWS

Flex

No Interviews

INTERVIEWS

nVent

No Interviews

REVIEWS

Persistent Systems

No Reviews

INTERVIEWS

Blackrock

No Interviews

SALARIES

Intellect Design Arena

LIST OF COMPANIES

Persistent Systems

Overview

INTERVIEWS

Zoho

No Interviews

Tell us how to improve this page.

Ashoka Buildcon Interview Process

based on 83 interviews

Interview experience

4.3
  
Good
View more

Interview Questions from Similar Companies

GMR Group Interview Questions
4.0
 • 80 Interviews
GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

Ashoka Buildcon Reviews and Ratings

based on 1.2k reviews

4.1/5

Rating in categories

3.8

Skill development

3.8

Work-life balance

3.8

Salary

3.8

Job security

3.8

Company culture

3.5

Promotions

3.8

Work satisfaction

Explore 1.2k Reviews and Ratings
CEO (International Business)

Nashik,

Mumbai

20-30 Yrs

Not Disclosed

Explore more jobs
Engineer
202 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
145 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Store Keeper
80 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Engineer
77 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
77 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Ashoka Buildcon with

IRB Infrastructure

4.0
Compare

Reliance Infrastructure

4.1
Compare

GMR Group

4.0
Compare

Larsen & Toubro Limited

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent