Filter interviews by
The question is about the specifications of different layers in a flexible pavement.
The embankment layer has a thickness of 3m and is compacted at 95% with large size soil particles and effective CBR as per design.
The subgrade layer has a total thickness of 500mm and is compacted at 97% with large size soil particles and effective CBR as per design.
The GSB layer has a total thickness of 300mm and is a mixture of aggreg...
Design procedure for laying M15 grade concrete with specific requirements for cement content, compressive strength, and compaction.
Use M15 grade concrete with aggregate and cement ratio of 1:2
Minimum cement content of 150kg per cum, or 120kg per cum if flyash is more than 20%
Ensure compressive strength of 10MPA after 7 days curing, with no sample below 7.5MPA
Ensure DLC premix batching plant material is homogeneous and ...
Design procedure for PQC using M40 grade concrete
Minimum cement content of 360kg per cum
Flexural strength of 4.5MPA and compressive strength of 40MPA after 28-day curing
Dowel bars and tie bars provided for load transfer and prevention of cracking and deflection
PQC mix prepared in pre-mix batching plant and transported to site
Separation membrane and texturing and sawing operations performed for proper finishing
28-day cu...
Different types of carriage way include single lane, multilane, intermediate lane, two lane, three lane, and four lane.
Single lane has a width of 3.75m
Multilane has a width of 3.50m
Intermediate lane has a width of 5.5m
Two lane has a width of 7.5m
Three lane has a width of 10.50m
Four lane has a width of 7.5m + 7.5m
Embankment is a raised bank or wall built to carry a road or to hold back water.
Embankment is a raised structure made of earth or other materials to support a road or railway.
Earthwork process involves moving, processing, and placing soil or rock to create embankments, excavations, or other earth structures.
Embankments are commonly used in road construction to elevate the road above the surrounding terrain.
Earthwork pr...
PQC laying stands for Pavement Quality Concrete laying, which is the final layer of concrete pavement on roads.
PQC laying is the process of laying the final layer of concrete pavement on roads.
It is done after the base and sub-base layers have been prepared and compacted.
PQC laying ensures a smooth and durable surface for vehicles to travel on.
Proper curing of PQC is essential to prevent cracks and ensure longevity.
Exa...
RCC drain is a reinforced concrete drain used for efficient drainage of rainwater or wastewater.
RCC drain is made of reinforced concrete to provide strength and durability.
It is used to efficiently channel rainwater or wastewater away from roads, buildings, or other structures.
RCC drains come in various shapes and sizes depending on the specific drainage requirements.
These drains are commonly used in urban areas to pre...
Kerb laying is the process of installing and positioning curbs along the edges of roads or pavements.
Kerb laying involves setting out the alignment and levels for the curbs.
The curbs are then placed and fixed in position using concrete or other suitable materials.
Kerb laying helps define the edges of roads, provide structural support, and prevent vehicles from driving off the road.
Properly laid curbs enhance the overal...
Kerb painting and road marking are techniques used to designate specific areas on roads for various purposes.
Kerb painting involves painting the edges of the road, usually in a specific color, to indicate parking restrictions, loading zones, or pedestrian crossings.
Road marking includes painting lines, symbols, and signs on the road surface to guide traffic, indicate lanes, show pedestrian crossings, and warn of hazard...
posted on 7 Aug 2024
I applied via Recruitment Consulltant and was interviewed in Jul 2024. There was 1 interview round.
Finalizing CTC involves considering various factors like cost of living, market rates, company budget, and employee qualifications.
Consider cost of living in the location of posting
Compare market rates for similar positions in the area
Ensure the CTC fits within the company's budget constraints
Take into account the qualifications and experience of the employee
Negotiate if necessary to reach a mutually beneficial CTC
I am a motivated and detail-oriented individual with a background in business consulting and a passion for problem-solving.
Background in business consulting
Strong problem-solving skills
Motivated and detail-oriented
Excellent communication skills
Experience working in cross-functional teams
Developed a project management tool for tracking tasks and deadlines
Implemented user-friendly interface for easy task management
Integrated calendar feature for scheduling deadlines
Generated reports for tracking project progress
Utilized agile methodology for project development
Ashoka Buildcon interview questions for popular designations
Get interview-ready with Top Ashoka Buildcon Interview Questions
I was interviewed in Jun 2024.
FIDIC is a standard form of contract used in the construction industry, covering compliance, delay events, and relevant articles.
FIDIC stands for International Federation of Consulting Engineers
It provides a framework for construction contracts, including compliance requirements and procedures for handling delay events
Key articles in FIDIC contracts include those related to variations, claims, and dispute resolution
I h...
I applied via Walk-in and was interviewed in Jun 2024. There were 2 interview rounds.
Depreciation is the allocation of the cost of a tangible asset over its useful life.
Depreciation is a non-cash expense that reduces the value of an asset over time.
Common methods of depreciation include straight-line, double-declining balance, and units of production.
Depreciation is important for accurately reflecting the true value of assets on the balance sheet.
It is crucial for financial reporting and tax purposes.
D...
Government grants are typically recognized as income when they are received, but may need to be recognized as deferred income and recognized over time if they are intended to fund specific future expenses.
Government grants are usually recognized as income when received
However, if the grant is intended to fund specific future expenses, it may need to be recognized as deferred income and recognized over time
The treatment...
I applied via Referral and was interviewed in Mar 2024. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Nov 2023. There were 3 interview rounds.
I have 33 years of experience in Project Operations, leading successful projects from start to finish.
Led project teams to deliver successful outcomes within budget and timeline
Implemented efficient project management processes to streamline operations
Managed stakeholder relationships to ensure project alignment with organizational goals
Utilized risk management strategies to mitigate project challenges
Implemented innov
I applied via Company Website and was interviewed in Oct 2023. There were 5 interview rounds.
Yes, I have 3 years of experience working with G.s.b in highway 3D system (Trimble) as an assistant surveyor on a railway project in Chasma, Gujarat.
Experience working with G.s.b in highway 3D system (Trimble) for 3 years
Currently working as an assistant surveyor at Ashoka Buildcon on a railway project in Chasma, Gujarat
I applied via AmbitionBox and was interviewed in May 2024. There was 1 interview round.
Some of the top questions asked at the Ashoka Buildcon interview -
The duration of Ashoka Buildcon interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 83 interviews
Interview experience
based on 1.2k reviews
Rating in categories
Engineer
202
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
145
salaries
| ₹0 L/yr - ₹0 L/yr |
Store Keeper
80
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
77
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
77
salaries
| ₹0 L/yr - ₹0 L/yr |
IRB Infrastructure
Reliance Infrastructure
GMR Group
Larsen & Toubro Limited