Upload Button Icon Add office photos

Ashoka Buildcon

Compare button icon Compare button icon Compare

Filter interviews by

Ashoka Buildcon Interview Questions, Process, and Tips

Updated 22 Feb 2025

Top Ashoka Buildcon Interview Questions and Answers

View all 49 questions

Ashoka Buildcon Interview Experiences

Popular Designations

65 interviews found

I applied via Walk-in and was interviewed before Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. What is the DTR ?
  • Ans. 

    DTR stands for Data Terminal Ready.

    • DTR is a control signal used in serial communication.

    • It indicates that a data terminal equipment (DTE) is ready to communicate.

    • DTR is typically used to signal the start of a connection or to reset a device.

    • In RS-232 communication, DTR is often used to control the flow of data.

    • For example, when DTR is set to high, it indicates that the DTE is ready to send or receive data.

  • Answered by AI
  • Q2. What are the components used in DTR structure?
  • Ans. 

    DTR structure consists of transformer, rectifier, and filter components.

    • Transformer: used to step down the voltage from the power source

    • Rectifier: used to convert AC to DC

    • Filter: used to smooth out the DC output

    • Components may include diodes, capacitors, resistors, and inductors

    • Example: DTR structure is commonly used in power supplies for electronic devices

  • Answered by AI
  • Q3. How many rating of transformers used in 50 household
  • Ans. 

    The number of transformer ratings required for 50 households depends on their power consumption and distribution network.

    • The power consumption of each household needs to be determined

    • The distribution network and voltage level also affect the transformer rating

    • Assuming an average power consumption of 1 kW per household, a 50 kW transformer may be required

    • However, this can vary greatly depending on the specific circumsta

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Learned about DTR structure, pole type, cable types, installation of transformers

Top Ashoka Buildcon Electrical Engineer Interview Questions and Answers

Q1. How many rating of transformers used in 50 household
View answer (2)

Electrical Engineer Interview Questions asked at other Companies

Q1. What is the difference between Switch gear & Circuit Breakers ?
View answer (13)

I applied via Referral and was interviewed before Jun 2021. There were 4 interview rounds.

Round 1 - Aptitude Test 
Round 2 - HR 

(1 Question)

  • Q1. About the Liaisoning team and handling of works
Round 3 - Group Discussion 

On site work execution

Round 4 - Technical 

(1 Question)

  • Q1. How to take work frount on sites to do work smoothly
  • Ans. 

    To take work front on sites, clear communication, proper planning, and effective coordination are necessary.

    • Establish clear communication channels with all stakeholders involved in the project.

    • Plan the work in advance and ensure that all necessary resources are available on site.

    • Coordinate with the site team regularly to ensure that work is progressing smoothly and any issues are addressed promptly.

    • Ensure that all nece...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always while to do work at Ashoka buildcon ltd

Liaison Officer Interview Questions asked at other Companies

Q1. What is your Experience in Registration of Documents?
View answer (2)

Interview Questionnaire 

1 Question

  • Q1. Auto level, Sg top, Gsb top, Dlc, etc, my experience 03 year 07 months.

Civil Site Supervisor Interview Questions asked at other Companies

Q1. Which survey in earths 🌍 measurement Survay carefully?
View answer (2)

Junior HR Interview Questions & Answers

user image Anonymous

posted on 19 Sep 2021

I applied via Recruitment Consultant and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. How to handle trade union at site.
  • Ans. 

    Trade unions at site can be handled by effective communication, negotiation and conflict resolution.

    • Establish a positive relationship with the union representatives

    • Listen to their concerns and address them in a timely manner

    • Negotiate and compromise on issues to reach a mutually beneficial agreement

    • Create a grievance redressal mechanism to resolve conflicts

    • Ensure compliance with labor laws and regulations

    • Provide a safe ...

  • Answered by AI
  • Q2. How to handle trade union disputes and procedure for collective bargaining
  • Ans. 

    Trade union disputes can be handled through collective bargaining by following a set procedure.

    • Establish communication with the union representatives and understand their demands

    • Negotiate and come to a mutually beneficial agreement

    • If negotiations fail, seek the help of a mediator or arbitrator

    • Ensure compliance with legal requirements and company policies

    • Maintain a positive relationship with the union to prevent future

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Trade union labour laws

Junior HR Interview Questions asked at other Companies

Q1. How to handle trade union disputes and procedure for collective bargaining
View answer (1)

Ashoka Buildcon interview questions for popular designations

 Highway Engineer

 (2)

 Senior Engineer

 (2)

 Civil Structural Engineer

 (2)

 Safety Officer

 (2)

 Electrical Engineer

 (2)

 Senior Project Executive

 (2)

 Junior Officer

 (2)

 Civil Site Engineer

 (2)

I applied via Referral and was interviewed before Oct 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. What can you do for this Company.
  • Ans. 

    I can bring my strong leadership skills, problem-solving abilities, and dedication to achieving company goals.

    • I have experience leading teams and can effectively manage and motivate employees.

    • I am skilled at analyzing complex problems and finding innovative solutions.

    • I am committed to the success of the company and will work hard to achieve its objectives.

    • I have a track record of meeting deadlines and exceeding expecta...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Inter requires confidence & Experience

Junior Officer Interview Questions asked at other Companies

Q1. Process and equipments which i have used and worked on it,
View answer (7)

Get interview-ready with Top Ashoka Buildcon Interview Questions

Ashoka Buildcon Interview FAQs

How many rounds are there in Ashoka Buildcon interview?
Ashoka Buildcon interview process usually has 1-2 rounds. The most common rounds in the Ashoka Buildcon interview process are Technical, Resume Shortlist and HR.
How to prepare for Ashoka Buildcon interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Ashoka Buildcon. The most common topics and skills that interviewers at Ashoka Buildcon expect are Project Management, Civil Engineering, AutoCAD, Accounting and Business Development.
What are the top questions asked in Ashoka Buildcon interview?

Some of the top questions asked at the Ashoka Buildcon interview -

  1. Design procedure of PQC:- Use M40 grade concrete. 1:- The minimum cement c...read more
  2. DESINGN PROCEDURE :- 1:- Use M15 grade concrete. Aggregate and cement ratio 1...read more
  3. Flexible pavement:- 1:- EMBANKMENT:- Take thicknesses 3m approximately as per s...read more
How long is the Ashoka Buildcon interview process?

The duration of Ashoka Buildcon interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Ashoka Buildcon Interview Process

based on 83 interviews

Interview experience

4.3
  
Good
View more

Interview Questions from Similar Companies

GMR Group Interview Questions
4.0
 • 80 Interviews
GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

Ashoka Buildcon Reviews and Ratings

based on 1.2k reviews

4.1/5

Rating in categories

3.8

Skill development

3.8

Work-life balance

3.8

Salary

3.8

Job security

3.8

Company culture

3.5

Promotions

3.8

Work satisfaction

Explore 1.2k Reviews and Ratings
CEO (International Business)

Nashik,

Mumbai

20-30 Yrs

Not Disclosed

Explore more jobs
Engineer
202 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
145 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Store Keeper
80 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Engineer
77 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
77 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Ashoka Buildcon with

IRB Infrastructure

4.0
Compare

Reliance Infrastructure

4.1
Compare

GMR Group

4.0
Compare

Larsen & Toubro Limited

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview