Ashoka Buildcon Senior Project Manager Interview Questions, Process, and Tips

Updated 12 Sep 2022

Ashoka Buildcon Senior Project Manager Interview Experiences

1 interview found

Round 1 - Technical 

(14 Questions)

  • Q1. Two types road 1 Flexible pavement 2 Rigid pavement Before new project start Surveying, NGL,Encroachment , OGL
  • Q2. Flexible pavement:- 1:- EMBANKMENT:- Take thicknesses 3m approximately as per site conditions 95% compaction 1:- large size soil particles 75mm lumps and cloud. Liquid limit <50%, plastic limit<25% Swel...
  • Ans. 

    The question is about the specifications of different layers in a flexible pavement.

    • The embankment layer has a thickness of 3m and is compacted at 95% with large size soil particles and effective CBR as per design.

    • The subgrade layer has a total thickness of 500mm and is compacted at 97% with large size soil particles and effective CBR as per design.

    • The GSB layer has a total thickness of 300mm and is a mixture of aggreg...

  • Answered by AI
  • Q3. Emulsion:- Prime coat:- low viscous cut back bitumen on wmm surfaces area and filling pores and void. Tackcoat:- Light application bitumen , asphalt, emulsion and diluted water on wmm surfaces area.
  • Q4. DBM:- it total thickness of 150mm compacted two layer 75mm and 75mm It mix with aggregate 20mm to 28mm and bitumen VG30 GRADE.apply on si
  • Q5. Tackcoat;- light application bitumen, asphalt,emulsion and dilute water on DBM Surfaces area. BC:- It is total thickness of 50mm compacted ,aggregate size 13.1mm and bitumen VG30 grade on DBM. Seal co...
  • Q6. Laying of bitumen concete. :-130 degree celceious to 150 degree celceious. Rolling on bitumen concete :-80 degree celceious 100 degree celceious
  • Q7. Rigid pavements:- 1 :- DLC= 150MM 2:-PQC = 300MM
  • Q8. DLC:-Material sutabilitey 1:- Aggregate size 26.5 mm 2:- water absorption max2% 3:- Soundness test Naso4 - 12% Mgso4-18% 4:- Angle of abr...
  • Q9. DESINGN PROCEDURE :- 1:- Use M15 grade concrete. Aggregate and cement ratio 1:2 2:- The minimum cement content 150kg percum. If flayash is more than 20% the minimum cement contents 120 kg percum. 3:- T...
  • Ans. 

    Design procedure for laying M15 grade concrete with specific requirements for cement content, compressive strength, and compaction.

    • Use M15 grade concrete with aggregate and cement ratio of 1:2

    • Minimum cement content of 150kg per cum, or 120kg per cum if flyash is more than 20%

    • Ensure compressive strength of 10MPA after 7 days curing, with no sample below 7.5MPA

    • Ensure DLC premix batching plant material is homogeneous and ...

  • Answered by AI
  • Q10. PQC:- Material sutabilitey 1:- Aggregate size 31.5mm Material sutabilitey of pqc from Soundness test to sand equivalent
  • Q11. Design procedure of PQC:- Use M40 grade concrete. 1:- The minimum cement content 360kg percum. If flyash more than 20% the minimum cement contents 310 kg percum. 2:-The flexuar strength of cement ...
  • Ans. 

    Design procedure for PQC using M40 grade concrete

    • Minimum cement content of 360kg per cum

    • Flexural strength of 4.5MPA and compressive strength of 40MPA after 28-day curing

    • Dowel bars and tie bars provided for load transfer and prevention of cracking and deflection

    • PQC mix prepared in pre-mix batching plant and transported to site

    • Separation membrane and texturing and sawing operations performed for proper finishing

    • 28-day cu...

  • Answered by AI
  • Q12. DIFFERENT TYPES OF CARRIAGE WAY 1 :- Single lane- 3.75 m 2:- Multlane;- 3.50m 3:- Inter mediate lane:- 5.5m 4 Two lane :- 7.5 m 5:- Thee lane:- 10.50m 6:- Four lane:- 7.5m+ 7.5m
  • Ans. 

    Different types of carriage way include single lane, multilane, intermediate lane, two lane, three lane, and four lane.

    • Single lane has a width of 3.75m

    • Multilane has a width of 3.50m

    • Intermediate lane has a width of 5.5m

    • Two lane has a width of 7.5m

    • Three lane has a width of 10.50m

    • Four lane has a width of 7.5m + 7.5m

  • Answered by AI
  • Q13. TYPES CAMBER 1 :- STRIGTH CAMBER 2:- PAROBOLIC CABER 3 STRAIGHT AND PARABOLIC CAMBER cc amber 1 in 50 to 1in60 Bitumen CAMBER 1in40 to 1in 50 camber Wmm camber 1in30 to 1in40
  • Q14. CBR;- Developed by the California division State of high way to classify and evaluting 1: soil subgrade 2:-GSB CBR-=3% TO 15% Clay=<8% Sand 15% to 35% Gravel >25% THICKNESSES OF PAVEMENT T= (1.75P/...

Interview Preparation Tips

Interview preparation tips for other job seekers - National high way 2 to 4 lane
Expressway way 6 to 8 lane
Minimum right of way 4 lane 6 lane =60M
EXPRESS WAY HAVE MANY SMART AND
INTEILIGENT FEATURS
HTMS = high traffic management system
VIDS=visual incident deduction system0
Expressway advance features to lays
1;- Excess ramp
2:-Line divder
3:- Grade separation
4;- Elevated section
Expressway is no multiple lane
4 lane cast = 8 to 10 core rupees/ km
6 lane coast = 14 core rs / km

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(3 Questions)

  • Q1. Why we are use lap in centre of column or Zone B?
  • Ans. 

    Lap is used in the center of a column or Zone B for structural stability and reinforcement.

    • Lap joints provide additional strength and stability to the column.

    • They help in distributing the load evenly across the column.

    • Lap joints prevent the column from cracking or failing under heavy loads.

    • Zone B is a critical area where the maximum bending moment occurs, and lap joints help in reinforcing this zone.

    • By using lap in the...

  • Answered by AI
  • Q2. Where are construction joint is provide in simply supported slab?
  • Ans. 

    Construction joints are provided at mid-span of simply supported slabs.

    • Construction joints are provided to allow for differential movement between adjacent sections of the slab.

    • They are typically located at mid-span of the slab, where the bending moment is zero.

    • The joint should be designed to transfer shear and moment between the two sections of the slab.

    • Proper reinforcement detailing is necessary to ensure the joint f...

  • Answered by AI
  • Q3. L/6 or L/ 3 where L is sapan of slab
  • Ans. 

    L/6 or L/3 is the ratio used to determine the maximum allowable deflection of a slab.

    • L/6 is used for residential buildings while L/3 is used for commercial buildings.

    • The ratio determines the maximum amount of deflection that a slab can have without causing damage or discomfort to occupants.

    • For example, if the span of a slab is 12 feet, the maximum allowable deflection for a residential building would be 2 inches (12/6)...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If you are doing your job with practical experience then no worries about any interview
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(3 Questions)

  • Q1. DDUGJY Project;- 33/11 KV New PSS ,33 KV Line ,11 KV Line and LT Line
  • Ans. Rerea of New PSS 60*40 mtr control room 1700 sqft road 60 mtr width 3.75 mtr footpath 15 mtr , fencing 40 mtr cable trench 130 mtr , 2 no 5 MVA PTR, 800Amp VCB and 800 Amp rating isolator in switch yards area. cost of civil work by sub cotractor 1.15 cr and electrical work 9.85 lac.
  • Answered Anonymously
  • Q2. RGGVY 12th Plan , HVDS Project, and Segrigation
  • Q3. ADB Project 33/11 KV New PSS R&M 33&11 KV line LT Line
Round 3 - HR 

(1 Question)

  • Q1. Final negotiation of salary

Interview Preparation Tips

Interview preparation tips for other job seekers - Please consider as per work profile in electrical feild
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Selected Selected

I applied via Recruitment Consulltant

Round 1 - Assignment 

Project Management , Production Management and HSE

Round 2 - HR 

(1 Question)

  • Q1. Very understanding and initiate. Motivated HR Department
Round 3 - Case Study 

Deeply interested in RR PACKAGE

Round 4 - Group Discussion 

Well. We used to do everyday

Interview Preparation Tips

Interview preparation tips for other job seekers - Thakur Sir, ♥️ has recommended for this job. I did my best to GREPL. If he allows will do more in this regard.

I applied via Naukri.com and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(4 Questions)

  • Q1. What are your salary expectations?
  • Q2. Share details of your previous job.
  • Q3. Why are you looking for a change?
  • Q4. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - JUST BE CONFIDENT THEY ARE LOOKING FOR CANDIDATE WHO HAVE GOOD DECISION MAKING POWER.

I applied via Campus Placement and was interviewed before Jun 2021. There were 3 interview rounds.

Round 1 - Aptitude Test 

Mathematics, English, Reasoning

Round 2 - Technical 

(2 Questions)

  • Q1. They asked Technical questions
  • Q2. What is antenna What is satcom
  • Ans. 

    An antenna is a device that converts electrical signals into electromagnetic waves and vice versa. Satcom is short for satellite communication.

    • Antennas are used for transmitting and receiving signals in various applications such as radio, television, and wireless communication.

    • Satcom refers to the use of satellites for communication purposes, including television broadcasting, internet access, and military communicatio...

  • Answered by AI
Round 3 - Group Discussion 

Clean India
Corruption

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and believe in yourself

Interview Questionnaire 

1 Question

  • Q1. What is your role in previous company

I applied via Recruitment Consultant and was interviewed before Aug 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Machinery maintenance Dpr maintenance,local purchasing,

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice,good and teritical intrew done and completed

Interview Questionnaire 

3 Questions

  • Q1. Basically questions related to power distribution field & some of college courses.
  • Q2. In this round questions basically related to management & technical composition.
  • Q3. He only asked your previous n current financial requirements as per your interview.

I applied via PLACEMENT

Interview Preparation Tips

Round: Technical Interview
Experience: Good detailed interview in terms of technical knowledge
Tips: Should be thorough with the projects you have done during the course

General Tips: be confident of what you put in your resume
Technical knowledge regarding projects undertaken during engineering should be sound
Be confident
Skills: Communication, Thinking capability, knowledge applying capability
College Name: V.E.S Institute Of Technology
Motivation: Opportunity to work in a renowned and core technical company
Funny Moments: We consider the interview panelists to be as tough as our viva externals. Interviewers are mostly on your side(contrary to viva professors :P)
Contribute & help others!
anonymous
You can choose to be anonymous

Ashoka Buildcon Interview FAQs

How many rounds are there in Ashoka Buildcon Senior Project Manager interview?
Ashoka Buildcon interview process usually has 1 rounds. The most common rounds in the Ashoka Buildcon interview process are Technical.
How to prepare for Ashoka Buildcon Senior Project Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Ashoka Buildcon. The most common topics and skills that interviewers at Ashoka Buildcon expect are Billing, Civil Project Management, Construction Project Management, Design and Project Execution.
What are the top questions asked in Ashoka Buildcon Senior Project Manager interview?

Some of the top questions asked at the Ashoka Buildcon Senior Project Manager interview -

  1. Design procedure of PQC:- Use M40 grade concrete. 1:- The minimum cement c...read more
  2. DESINGN PROCEDURE :- 1:- Use M15 grade concrete. Aggregate and cement ratio 1...read more
  3. Flexible pavement:- 1:- EMBANKMENT:- Take thicknesses 3m approximately as per s...read more

Recently Viewed

SALARIES

Fujitsu

SALARIES

VIKRAN Engineering & Exim

SALARIES

Fujitsu

SALARIES

Sutherland Global Services

INTERVIEWS

Patel Infrastructure

No Interviews

SALARIES

ASC Infratech

SALARIES

Larsen & Toubro Limited

SALARIES

Optum Global Solutions

JOBS

Royal Infraconstru

No Jobs

SALARIES

VIKRAN Engineering & Exim

Tell us how to improve this page.

Ashoka Buildcon Senior Project Manager Salary
based on 4 salaries
₹30.9 L/yr - ₹40.8 L/yr
29% more than the average Senior Project Manager Salary in India
View more details

Ashoka Buildcon Senior Project Manager Reviews and Ratings

based on 2 reviews

4.0/5

Rating in categories

3.9

Skill development

3.0

Work-life balance

3.9

Salary

3.9

Job security

4.9

Company culture

3.0

Promotions

3.9

Work satisfaction

Explore 2 Reviews and Ratings
Engineer
199 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
145 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Store Keeper
80 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Engineer
77 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
77 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Ashoka Buildcon with

IRB Infrastructure

4.0
Compare

Reliance Infrastructure

4.1
Compare

GMR Group

4.0
Compare

Larsen & Toubro Limited

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview