Upload Button Icon Add office photos

Ashoka Buildcon

Compare button icon Compare button icon Compare

Filter interviews by

Ashoka Buildcon Civil Site Engineer Interview Questions and Answers

Updated 25 Aug 2023

Ashoka Buildcon Civil Site Engineer Interview Experiences

2 interviews found

Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Cut length of spiral stirrup for pile..
  • Ans. 

    The cut length of spiral stirrup for a pile is determined based on the diameter of the pile and the spacing required for the stirrups.

    • Calculate the circumference of the pile using the formula C = π * d, where d is the diameter of the pile.

    • Determine the spacing required for the spiral stirrups based on design specifications.

    • Multiply the circumference of the pile by the number of required spiral stirrups to get the total...

  • Answered by AI
  • Q2. Axial load on column
  • Ans. 

    Axial load on column refers to the vertical force acting on the column, typically due to the weight of the structure it supports.

    • Axial load is the force that acts along the longitudinal axis of the column.

    • It is important to consider axial load in column design to ensure structural stability.

    • Examples of factors affecting axial load include dead loads, live loads, and wind loads on the structure.

  • Answered by AI

I applied via Referral and was interviewed before Oct 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. Grades of concrete, Grades of cement Grades of steel
  • Ans. 

    Grades of concrete, cement, and steel are important in civil engineering.

    • Grades of concrete refer to the strength and durability of the concrete mix.

    • Common grades of concrete include M10, M15, M20, M25, etc.

    • Grades of cement indicate the compressive strength of the cement.

    • Common grades of cement include 33, 43, and 53.

    • Grades of steel refer to the strength and ductility of the steel used in construction.

    • Common grades of

  • Answered by AI
  • Q2. Type pf pavement and
  • Q3. Rigid and flexible Rigid:-concrete pavement Flexible:-Bituminous concrete
  • Q4. Test on cement and concrete
  • Q5. Physical and chemical test And concrete:- Compressive strength test

Interview Preparation Tips

Topics to prepare for Ashoka Buildcon Civil Site Engineer interview:
  • Highways
Interview preparation tips for other job seekers - Best of luck for interview
And interview is not too much hard

Civil Site Engineer Interview Questions Asked at Other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
Q2. If you have 10x10 feet room and you have 600x600 mm size tiles th ... read more
asked in TCE
Q3. If your concrete is M50 and 28 days cube test result is below 100 ... read more
Q4. 1.What is the thickness of plastering?, 2.What is name of plaster ... read more
Q5. What is the time period of open bag cement

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - HR 

(3 Questions)

  • Q1. Have you maintained standard quality in your previous company?
  • Ans. 

    Yes, I have consistently maintained standard quality in my previous company by following industry best practices and ensuring compliance with regulations.

    • Implemented quality control measures to ensure compliance with project specifications

    • Regularly conducted quality inspections and audits to identify and address any issues

    • Collaborated with project team members to address quality concerns and make necessary improvements

    • ...

  • Answered by AI
  • Q2. Do you use drawing and technology in your work?
  • Ans. 

    Yes, I use drawing software like AutoCAD and technology like GPS in my work.

    • I use drawing software like AutoCAD to create detailed plans and designs for construction projects.

    • I utilize technology like GPS to accurately survey and map out sites for construction.

    • Drawing and technology help me streamline the design and construction process, leading to more efficient and precise results.

  • Answered by AI
  • Q3. Are you doing to maintain time in your life
  • Ans. 

    I prioritize tasks, set goals, use time management tools, and maintain a healthy work-life balance.

    • Prioritize tasks based on deadlines and importance

    • Set specific goals and create a schedule to achieve them

    • Use time management tools such as calendars, to-do lists, and reminders

    • Maintain a healthy work-life balance by setting boundaries and taking breaks

    • Delegate tasks when necessary to avoid burnout

    • Examples: Using project ...

  • Answered by AI
Round 2 - Aptitude Test 

Calculator for material quantity on site material

Round 3 - HR 

(2 Questions)

  • Q1. How do you calculate the quantity of a specific item or material?
  • Ans. 

    Quantity of a specific item or material is calculated by multiplying the dimensions and density of the material.

    • Calculate volume by multiplying length, width, and height

    • Determine density of the material

    • Multiply volume by density to get quantity

    • For example, to calculate quantity of concrete needed for a slab, multiply slab dimensions by density of concrete

  • Answered by AI
  • Q2. What methods do you use to verify information?
  • Ans. 

    I use a combination of document review, site visits, and communication with stakeholders to verify information.

    • Reviewing project documents such as drawings, specifications, and reports

    • Conducting site visits to physically inspect the work and verify conditions

    • Communicating with project team members, clients, and contractors to clarify information

    • Utilizing surveying and testing equipment to validate data

    • Cross-referencing...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Thank you for providing me with this opportunity.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - HR 

(5 Questions)

  • Q1. Working time in site work
  • Q2. Working time period
  • Q3. Som soil survey steel
  • Q4. Highway engineering
  • Q5. Irrigation Fluid machinces
Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Dec 2023. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Project and salary discussion
  • Q2. Expected date of joining
Round 2 - Technical 

(2 Questions)

  • Q1. Parts of building
  • Q2. Plaster thickness, steel calculation
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Slop of stairs case
  • Ans. 

    The slope of stairs refers to the angle at which the stairs are inclined, affecting safety and accessibility.

    • The slope of stairs is typically between 30-35 degrees for comfortable and safe use.

    • Building codes may dictate specific slope requirements for stairs to ensure safety and accessibility.

    • The slope of stairs can be calculated using trigonometry, with the rise and run of the stairs determining the angle.

    • A steep slop...

  • Answered by AI
  • Q2. Why covering provided in steel reinforcement?
  • Ans. 

    Covering is provided in steel reinforcement to protect it from corrosion and to ensure proper bond with concrete.

    • Covering protects steel reinforcement from corrosion caused by exposure to moisture and chemicals in the environment.

    • It helps in maintaining the bond between steel reinforcement and concrete, ensuring structural integrity.

    • Proper covering thickness is important to prevent rusting of steel bars and maintain du...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. What is the leaping zone of steel rainforcement ?
  • Ans. 

    The leaping zone of steel reinforcement refers to the area where the steel bars are not provided in a concrete member.

    • The leaping zone is typically found in beams and slabs where the steel reinforcement is not required to be continuous.

    • It is important to ensure that the leaping zone does not compromise the structural integrity of the member.

    • Proper detailing and design considerations are necessary to determine the exten...

  • Answered by AI
  • Q2. How can identify the site uses materials?
  • Ans. 

    Site uses materials can be identified through visual inspection, testing, and documentation.

    • Conduct visual inspection of materials on site to identify their type and quality

    • Perform tests on materials such as soil, concrete, and asphalt to determine their properties

    • Review documentation such as material specifications, delivery receipts, and quality control reports

    • Consult with suppliers and manufacturers to verify the au

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. Draw the section of stairs case with reinforcement.
  • Ans. 

    A section of stairs case with reinforcement is a structural drawing showing the details of the stairs and the reinforcement bars used for strength.

    • Include dimensions and materials used for the stairs and reinforcement bars

    • Show the arrangement of reinforcement bars in the section view

    • Label the different components of the stairs case for clarity

  • Answered by AI
  • Q2. What is the component of maivan technology
  • Ans. 

    Maivan technology consists of various components including sensors, software, and data analytics for monitoring and managing civil infrastructure.

    • Sensors are used to collect data on various parameters such as temperature, humidity, and structural integrity.

    • Software is utilized to process the data collected by sensors and provide real-time monitoring and analysis.

    • Data analytics tools are employed to identify patterns, t...

  • Answered by AI
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Technical side question
  • Q2. Civil engineering jobs in
Round 3 - Technical 

(2 Questions)

  • Q1. Civil structure
  • Q2. Civil engineering construction

Interview Preparation Tips

Topics to prepare for H.G. Infra Engineering Civil Site Engineer interview:
  • Civil Construction
  • Steel Structures
  • Sarvey
  • Building Construction
Interview preparation tips for other job seekers - Please company in job
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2023. There were 3 interview rounds.

Round 1 - Group Discussion 

It was very good , they give certain time to prepare yourself

Round 2 - Aptitude Test 

It's basically arithmetic and reasoning test

Round 3 - Technical 

(2 Questions)

  • Q1. What is the nominal size of brick
  • Ans. 

    The nominal size of a brick is the size specified by the manufacturer for identification and classification purposes.

    • The nominal size of a brick is typically larger than its actual size to account for mortar joints.

    • Common nominal sizes for bricks include 4 inches by 8 inches by 2 1/4 inches and 3 5/8 inches by 2 1/4 inches by 8 inches.

    • It is important to consider the nominal size when planning and designing brickwork pr

  • Answered by AI
  • Q2. What are the admixture of concrete
  • Ans. 

    Admixtures are added to concrete to alter its properties or enhance its performance.

    • Admixtures can improve workability, durability, strength, and set time of concrete

    • Types of admixtures include water reducers, accelerators, retarders, air-entraining agents, and superplasticizers

    • Example: Adding a water reducer admixture can increase the workability of concrete without compromising strength

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Get your knowledge about construction

I applied via Naukri.com and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About tunneling pramery and secondary structure

Interview Preparation Tips

Topics to prepare for Patel Engineering Civil Site Engineer interview:
  • About tunneling
Interview preparation tips for other job seekers - My name is bashir Ahmad koka I am from Jammu and Kashmir and I have completed my education specialisation in civil engineering please find enclosed here with my curriculum vitae for a post at your project still I am working at NATM tunnel Jammu and Kashmir
Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Basic construction techniques to be known
  • Ans. 

    Basic construction techniques include excavation, foundation construction, concrete pouring, framing, and finishing.

    • Excavation: Digging and removing soil to prepare the site for construction.

    • Foundation construction: Building the base of the structure to provide stability.

    • Concrete pouring: Pouring and leveling concrete to create floors, walls, and other structural elements.

    • Framing: Constructing the skeletal framework of...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be clear in your project need before reach the interview..

Ashoka Buildcon Interview FAQs

How many rounds are there in Ashoka Buildcon Civil Site Engineer interview?
Ashoka Buildcon interview process usually has 2 rounds. The most common rounds in the Ashoka Buildcon interview process are Resume Shortlist, One-on-one Round and Technical.
What are the top questions asked in Ashoka Buildcon Civil Site Engineer interview?

Some of the top questions asked at the Ashoka Buildcon Civil Site Engineer interview -

  1. Grades of concrete, Grades of cement Grades of st...read more
  2. Cut length of spiral stirrup for pil...read more
  3. Axial load on col...read more

Tell us how to improve this page.

Ashoka Buildcon Civil Site Engineer Interview Process

based on 2 interviews

Interview experience

2.5
  
Poor
View more
Ashoka Buildcon Civil Site Engineer Salary
based on 49 salaries
₹1.8 L/yr - ₹5 L/yr
At par with the average Civil Site Engineer Salary in India
View more details

Ashoka Buildcon Civil Site Engineer Reviews and Ratings

based on 16 reviews

3.9/5

Rating in categories

3.7

Skill development

3.4

Work-life balance

2.9

Salary

3.5

Job security

3.4

Company culture

3.0

Promotions

3.7

Work satisfaction

Explore 16 Reviews and Ratings
Engineer
202 salaries
unlock blur

₹1.8 L/yr - ₹5.6 L/yr

Senior Engineer
143 salaries
unlock blur

₹3.5 L/yr - ₹9.7 L/yr

Store Keeper
80 salaries
unlock blur

₹1.8 L/yr - ₹4.2 L/yr

Civil Engineer
78 salaries
unlock blur

₹2.1 L/yr - ₹6 L/yr

Site Engineer
77 salaries
unlock blur

₹2 L/yr - ₹5.5 L/yr

Explore more salaries
Compare Ashoka Buildcon with

IRB Infrastructure

4.1
Compare

Reliance Infrastructure

4.1
Compare

GMR Group

4.1
Compare

Larsen & Toubro Limited

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview