Upload Button Icon Add office photos

L&T Construction

Compare button icon Compare button icon Compare

Filter interviews by

L&T Construction Civil Site Engineer Interview Questions, Process, and Tips

Updated 20 Feb 2025

Top L&T Construction Civil Site Engineer Interview Questions and Answers

View all 32 questions

L&T Construction Civil Site Engineer Interview Experiences

33 interviews found

Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - Technical 

(3 Questions)

  • Q1. Steel structure
  • Q2. All supervision
  • Q3. All measurements
Round 2 - Technical 

(3 Questions)

  • Q1. Steel structure
  • Q2. All supervision
  • Q3. All measurement
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - HR 

(3 Questions)

  • Q1. Have you maintained standard quality in your previous company?
  • Ans. 

    Yes, I have consistently maintained standard quality in my previous company by following industry best practices and ensuring compliance with regulations.

    • Implemented quality control measures to ensure compliance with project specifications

    • Regularly conducted quality inspections and audits to identify and address any issues

    • Collaborated with project team members to address quality concerns and make necessary improvements

    • ...

  • Answered by AI
  • Q2. Do you use drawing and technology in your work?
  • Ans. 

    Yes, I use drawing software like AutoCAD and technology like GPS in my work.

    • I use drawing software like AutoCAD to create detailed plans and designs for construction projects.

    • I utilize technology like GPS to accurately survey and map out sites for construction.

    • Drawing and technology help me streamline the design and construction process, leading to more efficient and precise results.

  • Answered by AI
  • Q3. Are you doing to maintain time in your life
  • Ans. 

    I prioritize tasks, set goals, use time management tools, and maintain a healthy work-life balance.

    • Prioritize tasks based on deadlines and importance

    • Set specific goals and create a schedule to achieve them

    • Use time management tools such as calendars, to-do lists, and reminders

    • Maintain a healthy work-life balance by setting boundaries and taking breaks

    • Delegate tasks when necessary to avoid burnout

    • Examples: Using project ...

  • Answered by AI
Round 2 - Aptitude Test 

Calculator for material quantity on site material

Round 3 - HR 

(2 Questions)

  • Q1. How do you calculate the quantity of a specific item or material?
  • Ans. 

    Quantity of a specific item or material is calculated by multiplying the dimensions and density of the material.

    • Calculate volume by multiplying length, width, and height

    • Determine density of the material

    • Multiply volume by density to get quantity

    • For example, to calculate quantity of concrete needed for a slab, multiply slab dimensions by density of concrete

  • Answered by AI
  • Q2. What methods do you use to verify information?
  • Ans. 

    I use a combination of document review, site visits, and communication with stakeholders to verify information.

    • Reviewing project documents such as drawings, specifications, and reports

    • Conducting site visits to physically inspect the work and verify conditions

    • Communicating with project team members, clients, and contractors to clarify information

    • Utilizing surveying and testing equipment to validate data

    • Cross-referencing...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Thank you for providing me with this opportunity.

Civil Site Engineer Interview Questions Asked at Other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
Q2. If you have 10x10 feet room and you have 600x600 mm size tiles th ... read more
asked in TCE
Q3. If your concrete is M50 and 28 days cube test result is below 100 ... read more
Q4. 1.What is the thickness of plastering?, 2.What is name of plaster ... read more
Q5. What is the time period of open bag cement
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jun 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Face to face interview

Round 2 - Technical 

(5 Questions)

  • Q1. What is the BBS and Survey
  • Ans. 

    BBS stands for Bar Bending Schedule and Survey refers to the process of measuring and mapping an area.

    • BBS is a document that provides details of reinforcement cutting length, type, and bending shape for construction.

    • Survey involves measuring and mapping land to determine boundaries, elevations, and other important information.

    • Both BBS and Survey are crucial in the construction industry to ensure accurate and efficient

  • Answered by AI
  • Q2. What is the estimation
  • Ans. 

    Estimation is the process of calculating the quantities and costs of materials, labor, and equipment required for a construction project.

    • Estimation involves determining the quantities of materials needed for a project.

    • It also includes calculating the labor hours required for the project.

    • Estimation considers the costs of equipment and other resources needed for the project.

    • Estimation helps in creating a budget and timel

  • Answered by AI
  • Q3. What is the soil test
  • Ans. 

    Soil test is a process of analyzing the properties of soil to determine its suitability for construction purposes.

    • Soil tests help in determining the strength, permeability, compaction, and other important properties of soil.

    • Different types of soil tests include sieve analysis, moisture content test, proctor compaction test, etc.

    • Results of soil tests help in designing foundations, pavements, retaining walls, and other s...

  • Answered by AI
  • Q4. What is the RCC
  • Ans. 

    RCC stands for Reinforced Cement Concrete, a composite material made of concrete and steel reinforcement.

    • RCC is a versatile construction material used in buildings, bridges, dams, etc.

    • It combines the compressive strength of concrete with the tensile strength of steel reinforcement.

    • RCC elements include beams, columns, slabs, and foundations.

    • Example: RCC beams are used to support the load of the structure and transfer it...

  • Answered by AI
  • Q5. What is the DPR
  • Ans. 

    DPR stands for Detailed Project Report, which is a comprehensive document that outlines the details of a construction project.

    • DPR includes information on project scope, objectives, cost estimates, timelines, resources, and potential risks.

    • It serves as a roadmap for the project, guiding the engineers and stakeholders throughout the construction process.

    • DPR is crucial for obtaining approvals, funding, and ensuring the su...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Which material use in construction?
  • Ans. 

    Various materials are used in construction including concrete, steel, wood, brick, and asphalt.

    • Concrete is commonly used for foundations, walls, and floors

    • Steel is used for structural frames and reinforcement

    • Wood is used for framing, flooring, and finishing

    • Brick is used for walls and facades

    • Asphalt is used for roads and pavements

  • Answered by AI
  • Q2. What are the temprature of concrete?
  • Ans. 

    The temperature of concrete can vary depending on factors such as the mix design, curing conditions, and ambient temperature.

    • The temperature of freshly mixed concrete is typically between 50-75 degrees Fahrenheit.

    • During curing, the concrete temperature should be maintained above 50 degrees Fahrenheit for proper hydration.

    • Extreme temperatures, either too hot or too cold, can affect the strength and durability of concret...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for L&T Construction Civil Site Engineer interview:
  • Construction Engineering
Interview preparation tips for other job seekers - Good technical skill, and computer knowledge,etc

L&T Construction interview questions for designations

 Civil Site & Billing Engineer

 (1)

 Senior Civil Site Engineer

 (1)

 Civil Site Supervisor

 (5)

 Civil Engineer

 (25)

 Site Engineer

 (18)

 Site Engineer/Site Supervisor

 (1)

 Civil Site Engineer & Site Incharge

 (2)

 Civil Site Engineer,site Supervising

 (1)

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Building construction
  • Q2. Site engineer civil

Get interview-ready with Top L&T Construction Interview Questions

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. How to find dry density at field
  • Ans. 

    Dry density at field can be found using the sand replacement method.

    • Use sand replacement method to find the volume of the hole

    • Calculate the weight of the excavated soil

    • Divide the weight of soil by the volume of the hole to get the dry density

    • Dry density = Weight of soil / Volume of hole

  • Answered by AI
  • Q2. What is full form of OMC
  • Ans. 

    OMC stands for Optimum Moisture Content.

    • OMC is the moisture content at which a soil becomes most workable for compaction.

    • It is an important parameter in soil mechanics and geotechnical engineering.

    • OMC is determined through laboratory tests like Proctor compaction test.

    • Knowing the OMC helps in achieving the desired level of compaction for construction projects.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
-

I applied via Campus Placement and was interviewed in Dec 2023. There were 2 interview rounds.

Round 1 - Case Study 

Can you describe your experience with major civil engineering projects?How do you approach the planning and design phase of a civil engineering project?What software tools are you proficient in for structural analysis and design?How do you ensure compliance with building codes and regulations in your projects?Can you provide an example of a challenge you faced on a project and how you overcame it?What role do sustainability and environmental considerations play in your design process?How do you manage and coordinate with multidisciplinary teams on construction projects?Can you explain your approach to cost estimation and budget management in civil engineering projects?What safety measures do you prioritize on construction sites, and how do you enforce them?How do you stay updated on the latest developments and trends in the field of civil engineering?

Round 2 - Technical 

(1 Question)

  • Q1. Sure, here's a technical civil engineering question:Explain the process and considerations involved in determining the bearing capacity of soil for a foundation design.

Civil Site Engineer Interview Questions & Answers

user image Dropadi namdev

posted on 11 May 2024

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Nov 2023.

Round 1 - Technical 

(1 Question)

  • Q1. Type of foundation
  • Ans. 

    Different types of foundations include shallow foundations, deep foundations, and special foundations.

    • Shallow foundations are typically used for light structures and consist of spread footings, mat foundations, and slab-on-grade foundations.

    • Deep foundations are used when the soil near the surface is not suitable for supporting the structure's load. Examples include pile foundations and drilled shafts.

    • Special foundation...

  • Answered by AI
Round 2 - Technical 

(7 Questions)

  • Q1. What is the construction materials
  • Ans. 

    Construction materials are substances used for building and construction purposes.

    • Common construction materials include concrete, steel, wood, brick, and asphalt.

    • Each material has specific properties and uses in construction projects.

    • Materials must meet certain standards and regulations for safety and durability.

    • Selection of materials depends on factors like cost, availability, and project requirements.

  • Answered by AI
  • Q2. Disscus the foundation
  • Q3. What is the railway guage
  • Ans. 

    The railway gauge is the distance between the inner sides of the two parallel rails on a railway track.

    • Standard gauge is 1435 mm (4 ft 8 1/2 in) used in most of the world

    • Narrow gauge is less than standard gauge, used in mountainous regions or for heritage railways

    • Broad gauge is wider than standard gauge, used in some countries like India and Russia

  • Answered by AI
  • Q4. Types of sleepers
  • Ans. 

    Sleepers are structural elements used to support railway tracks. Types include wooden, concrete, steel, and composite sleepers.

    • Wooden sleepers are traditional and cost-effective but require frequent maintenance.

    • Concrete sleepers are durable and have a longer lifespan compared to wooden sleepers.

    • Steel sleepers are used in special applications where high strength and durability are required.

    • Composite sleepers are a newer...

  • Answered by AI
  • Q5. Explain Railway point and crossing
  • Ans. 

    Railway point and crossing are components of railway tracks that allow trains to switch between different tracks.

    • Railway points are movable rails that allow trains to switch from one track to another.

    • Crossings are where two tracks intersect, allowing trains to cross over from one track to another.

    • Points and crossings are essential for ensuring smooth and safe operation of trains on railway networks.

  • Answered by AI
  • Q6. Explain in railway budget
  • Ans. 

    Railway budget is the financial plan specifically for the development and maintenance of railway infrastructure.

    • Railway budget allocates funds for various projects such as new railway lines, station upgrades, and safety improvements.

    • It also includes provisions for modernization of railway systems, procurement of new rolling stock, and implementation of technology upgrades.

    • The budget is crucial for ensuring the efficien...

  • Answered by AI
  • Q7. Explain in railway ballast
  • Ans. 

    Railway ballast is a layer of crushed rock or gravel placed beneath the tracks to provide stability and drainage.

    • Railway ballast is typically made of crushed stone or gravel.

    • It is placed beneath the railway tracks to provide stability and support.

    • Ballast helps to distribute the weight of the trains and prevent the tracks from shifting.

    • It also helps with drainage to prevent water from pooling on the tracks.

    • Regular maint...

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. What is BBS and how is it used?
Round 2 - Aptitude Test 
Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Sep 2023. There was 1 interview round.

Round 1 - One-on-one 

(6 Questions)

  • Q1. What is the concrete compensation what percentage
  • Ans. 

    Concrete compensation percentage varies based on factors like experience, location, and company size.

    • Concrete compensation percentage can range from 5% to 20% of the total project cost.

    • Factors influencing concrete compensation percentage include experience level of the engineer, location of the project, and size of the company.

    • For example, a junior civil site engineer may receive a lower percentage compared to a senior...

  • Answered by AI
  • Q2. What is the concrete seting
  • Ans. 

    Concrete setting is the process in which concrete hardens and gains strength over time.

    • Concrete setting is the transformation of concrete from a plastic state to a hardened state.

    • It involves a chemical reaction called hydration, where water reacts with the cement in the concrete mixture.

    • The setting time of concrete can vary depending on factors like temperature, humidity, and mix design.

    • Proper curing is essential to en...

  • Answered by AI
  • Q3. What is column cover size
  • Ans. 

    Column cover size refers to the dimensions of the material used to cover or encase a structural column.

    • Column cover size is typically specified in terms of width, depth, and height.

    • It is important to consider the aesthetic and functional requirements when determining the column cover size.

    • Examples of column cover materials include metal, wood, stone, or composite materials.

    • Column cover size can vary depending on the de...

  • Answered by AI
  • Q4. What is size of parapet wall
  • Ans. 

    The size of a parapet wall can vary depending on the specific design requirements and building codes.

    • The typical height of a parapet wall is around 3 feet, but it can be higher for safety reasons or aesthetic purposes.

    • The thickness of a parapet wall is usually around 8 inches to provide structural support.

    • The length of a parapet wall will depend on the length of the building facade it is protecting.

    • Parapet walls can be...

  • Answered by AI
  • Q5. What is the concrete ratio .very nic grade
  • Ans. 

    Concrete ratio is the proportion of cement, sand, and aggregate in a concrete mix.

    • Concrete ratio is typically expressed as a ratio of cement:sand:aggregate, such as 1:2:4.

    • The ratio may vary depending on the strength and durability requirements of the concrete mix.

    • Common concrete ratios include 1:1.5:3, 1:2:4, and 1:3:6.

    • The grade of concrete (e.g. M20, M25) also determines the concrete ratio.

  • Answered by AI
  • Q6. What is the beam cover
  • Ans. 

    Beam cover is the distance between the outer face of the concrete beam and the outer face of the column or slab.

    • Beam cover is important for protecting the reinforcement bars from corrosion and fire damage.

    • It also helps in providing adequate strength and durability to the structure.

    • The beam cover requirement may vary based on the type of structure and environmental conditions.

    • For example, in coastal areas where there is...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for L&T Construction Civil Site Engineer interview:
  • Civil .work interview nic perfor
Interview preparation tips for other job seekers - Civil engineering is the

Skills evaluated in this interview

L&T Construction Interview FAQs

How many rounds are there in L&T Construction Civil Site Engineer interview?
L&T Construction interview process usually has 2-3 rounds. The most common rounds in the L&T Construction interview process are Technical, Resume Shortlist and HR.
What are the top questions asked in L&T Construction Civil Site Engineer interview?

Some of the top questions asked at the L&T Construction Civil Site Engineer interview -

  1. Minimum used in which grade of concr...read more
  2. How do you calculate the quantity of a specific item or materi...read more
  3. What is the concrete compensation what percent...read more
How long is the L&T Construction Civil Site Engineer interview process?

The duration of L&T Construction Civil Site Engineer interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

L&T Construction Civil Site Engineer Interview Process

based on 40 interviews

3 Interview rounds

  • Resume Shortlist Round
  • Technical Round
  • HR Round
View more
L&T Construction Civil Site Engineer Salary
based on 307 salaries
₹1.6 L/yr - ₹8.2 L/yr
31% more than the average Civil Site Engineer Salary in India
View more details

L&T Construction Civil Site Engineer Reviews and Ratings

based on 156 reviews

4.2/5

Rating in categories

4.4

Skill development

3.7

Work-life balance

4.1

Salary

4.3

Job security

4.1

Company culture

3.7

Promotions

4.0

Work satisfaction

Explore 156 Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹6 L/yr - ₹18.2 L/yr

Senior Engineer
711 salaries
unlock blur

₹3 L/yr - ₹12 L/yr

Assistant Construction Manager
504 salaries
unlock blur

₹5.4 L/yr - ₹18 L/yr

Construction Management
332 salaries
unlock blur

₹8.2 L/yr - ₹35 L/yr

Assistant Engineering Manager
321 salaries
unlock blur

₹6 L/yr - ₹17 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview