Filter interviews by
To work in a metro city with an EPB machine, one must be familiar with its operation and maintenance.
Understand the operation of the EPB machine and follow safety protocols
Regularly maintain and inspect the EPB machine to ensure proper functioning
Coordinate with other team members and stakeholders for efficient project execution
Stay updated on the latest technology and advancements in EPB machines
The VT pump installation process involves several steps. The raising main has multiple valves of different types. The cooling lubrication system is also important.
The VT pump installation process involves selecting the right location for the pump, preparing the foundation, and installing the pump.
The raising main typically has gate valves, check valves, and air release valves.
The cooling lubrication system is responsib...
I am looking for new challenges and opportunities for growth.
Seeking new challenges and opportunities for growth
Wanting to expand my skill set and knowledge
Desire for a higher level of responsibility
Seeking a better work-life balance
Unsatisfied with the current work environment or company culture
I expect a competitive salary that reflects my experience and the responsibilities of the Assistant Manager role.
I am looking for a salary that is in line with industry standards and the level of responsibility associated with the Assistant Manager position.
I have researched the average salary range for Assistant Managers in this industry and location, and I believe my skills and experience warrant a salary within that...
I applied via Naukri.com and was interviewed before Jan 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed before Jun 2023. There were 2 interview rounds.
L&T Construction interview questions for designations
I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.
The productivity of plaster work and tiles is an important factor in construction projects.
Productivity in plaster work can be measured by the amount of plaster applied per hour or per day.
Factors that can affect plaster work productivity include the skill level of the workers, the quality of materials used, and the efficiency of the tools and equipment.
For example, experienced plasterers may be able to apply plaster m...
Centiler beam steel design is a method used to determine the appropriate size and shape of steel beams for structural support.
Centiler beam steel design involves calculating the load and span of the beam to determine the required section modulus.
The section modulus is then used to select the appropriate beam size from standard steel beam tables.
Factors such as the type of load, material properties, and safety factors a...
The density of steel is a measure of its mass per unit volume.
Density of steel is typically measured in units of grams per cubic centimeter (g/cm³) or kilograms per cubic meter (kg/m³).
The density of steel can vary depending on the specific type and composition of the steel.
For example, the density of carbon steel is around 7.85 g/cm³, while stainless steel has a density of about 8 g/cm³.
The density of steel is an impo...
AAC blocks are a type of lightweight concrete blocks used in construction. They come in various sizes and prices.
AAC blocks are made from autoclaved aerated concrete, which is a mixture of cement, lime, sand, water, and an expanding agent.
The size of AAC blocks can vary, but common sizes include 600mm x 200mm x 100mm and 600mm x 200mm x 150mm.
The prices of AAC blocks depend on factors such as the brand, quality, and qu...
Get interview-ready with Top L&T Construction Interview Questions
I applied via Walk-in and was interviewed before Mar 2023. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Dec 2021. There were 3 interview rounds.
The amount of sqm plastering done by a Mason per day depends on various factors such as the size of concrete blocks, workability, painting, and gypsum work.
The size of concrete blocks can affect the amount of plastering done per day.
Workability of the plastering material can also affect the speed of work.
Painting and gypsum work can add to the time required for plastering.
It is difficult to give an exact number for the...
I was interviewed before Aug 2022.
All technical questions and taken interview 45 minutes i am fail to answer 3 from 50 but my performance good. 10 giants take interview.after all interview complited one list on notice board select 3 from 200 candidaye at L&T office andheri bombay.
I applied via Job Portal
Maintenance schedule is a plan for regular upkeep of equipment or facilities to ensure their optimal performance.
Maintenance schedule includes regular inspections, cleaning, lubrication, and replacement of parts as needed.
It helps prevent breakdowns, prolongs equipment life, and reduces repair costs.
Examples of maintenance schedules include daily, weekly, monthly, and annual checklists.
Maintenance schedules should be t...
I applied via Recruitment Consulltant and was interviewed before Mar 2022. There were 2 interview rounds.
Top trending discussions
1 Interview rounds
based on 289 reviews
Rating in categories
Assistant Manager
1.1k
salaries
| ₹6 L/yr - ₹17.8 L/yr |
Senior Engineer
856
salaries
| ₹3 L/yr - ₹12.2 L/yr |
Assistant Construction Manager
526
salaries
| ₹5.4 L/yr - ₹17.5 L/yr |
Civil Site Engineer
377
salaries
| ₹1.6 L/yr - ₹8.3 L/yr |
Assistant Engineering Manager
322
salaries
| ₹6 L/yr - ₹17 L/yr |
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company
GAMMON INDIA