Top L&T Construction Assistant Manager Interview Questions and Answers

  • Q1. How much sqm plastering done by Mason per day, concrete blocks sizes, workability, painting, gypsum work
  • Q2. Elaborate VT pump installation process step by step.. How many valves & types used in Raising main? Explain about Cooling Lubrication system.
  • Q3. How to work in metro city with EPB machine
View all 10 questions

L&T Construction Assistant Manager Interview Experiences

13 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Related TBM Tunnelling
  • Q2. How to work in metro city with EPB machine
  • Ans. 

    To work in a metro city with an EPB machine, one must be familiar with its operation and maintenance.

    • Understand the operation of the EPB machine and follow safety protocols

    • Regularly maintain and inspect the EPB machine to ensure proper functioning

    • Coordinate with other team members and stakeholders for efficient project execution

    • Stay updated on the latest technology and advancements in EPB machines

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Discussion about qualification
  • Q2. About salary and qualification
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Elaborate VT pump installation process step by step.. How many valves & types used in Raising main? Explain about Cooling Lubrication system.
  • Ans. 

    The VT pump installation process involves several steps. The raising main has multiple valves of different types. The cooling lubrication system is also important.

    • The VT pump installation process involves selecting the right location for the pump, preparing the foundation, and installing the pump.

    • The raising main typically has gate valves, check valves, and air release valves.

    • The cooling lubrication system is responsib...

  • Answered by AI
  • Q2. Why are you going to quit the current job?
  • Ans. 

    I am looking for new challenges and opportunities for growth.

    • Seeking new challenges and opportunities for growth

    • Wanting to expand my skill set and knowledge

    • Desire for a higher level of responsibility

    • Seeking a better work-life balance

    • Unsatisfied with the current work environment or company culture

  • Answered by AI
  • Q3. What is your salary expectation?
  • Ans. 

    I expect a competitive salary that reflects my experience and the responsibilities of the Assistant Manager role.

    • I am looking for a salary that is in line with industry standards and the level of responsibility associated with the Assistant Manager position.

    • I have researched the average salary range for Assistant Managers in this industry and location, and I believe my skills and experience warrant a salary within that...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Confident..
Be Genuine..
Listen each & every Qustion or case study & Explain properly as per practical conditions.

Assistant Manager Interview Questions Asked at Other Companies

asked in Axis Bank
Q1. You are Handling cash operations then how you manage operations w ... read more
asked in Jio
Q2. What are the different layers of OSI model?
asked in JSW Steel
Q3. 1. Whats is Cooling tower performance aspects, Vacuume breaker us ... read more
asked in Adani Group
Q4. What IS Codes do you follow for structural steel fabrication and ... read more
Q5. Why is SAS used of there are other open source tools available?

Assistant Manager Interview Questions & Answers

user image Kumar Dhananjay

posted on 10 Jan 2025

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jan 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. What is the process of developing an erection plan?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be calm and focused towars your goal
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jun 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Reagarding work experiences & background.
Round 2 - Technical 

(4 Questions)

  • Q1. Related to technical aspects of projects executed.
  • Q2. Concrete mix designs
  • Q3. P&M productivity - Earth works
  • Q4. Customer relationship related

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident in your answers. See the scope and technical aspects of the experience claimed.

L&T Construction interview questions for designations

 Assistant Store Manager

 (1)

 Assistant Manager/Manager -(Technical)

 (1)

 Assistant Construction Manager

 (8)

 Assistant Engineering Manager

 (3)

 Assistant Manager - EHS

 (2)

 Assistant Manager Civil

 (2)

 Assistant Manager Planning

 (1)

 Assistant Manager HSE

 (1)

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - Technical 

(9 Questions)

  • Q1. Stairs case ralling Section and fixing process
  • Q2. Productivity of plaster work and tiles
  • Ans. 

    The productivity of plaster work and tiles is an important factor in construction projects.

    • Productivity in plaster work can be measured by the amount of plaster applied per hour or per day.

    • Factors that can affect plaster work productivity include the skill level of the workers, the quality of materials used, and the efficiency of the tools and equipment.

    • For example, experienced plasterers may be able to apply plaster m...

  • Answered by AI
  • Q3. Centiler beam steel design
  • Ans. 

    Centiler beam steel design is a method used to determine the appropriate size and shape of steel beams for structural support.

    • Centiler beam steel design involves calculating the load and span of the beam to determine the required section modulus.

    • The section modulus is then used to select the appropriate beam size from standard steel beam tables.

    • Factors such as the type of load, material properties, and safety factors a...

  • Answered by AI
  • Q4. In footing 25 mm dia bend deduction yes ya No
  • Q5. Responsibility and team' work
  • Q6. Your work at site?
  • Q7. Work permit at site
  • Q8. Density of steel with unit
  • Ans. 

    The density of steel is a measure of its mass per unit volume.

    • Density of steel is typically measured in units of grams per cubic centimeter (g/cm³) or kilograms per cubic meter (kg/m³).

    • The density of steel can vary depending on the specific type and composition of the steel.

    • For example, the density of carbon steel is around 7.85 g/cm³, while stainless steel has a density of about 8 g/cm³.

    • The density of steel is an impo...

  • Answered by AI
  • Q9. AAC block price and size details
  • Ans. 

    AAC blocks are a type of lightweight concrete blocks used in construction. They come in various sizes and prices.

    • AAC blocks are made from autoclaved aerated concrete, which is a mixture of cement, lime, sand, water, and an expanding agent.

    • The size of AAC blocks can vary, but common sizes include 600mm x 200mm x 100mm and 600mm x 200mm x 150mm.

    • The prices of AAC blocks depend on factors such as the brand, quality, and qu...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for L&T Construction Assistant Manager interview:
  • Nice

Get interview-ready with Top L&T Construction Interview Questions

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. 1. Tell me about your previous job experience 2. Challenges in construction 3. Why safety and quality standards needed at site 4. Work procedure of Pile

Interview Preparation Tips

Topics to prepare for L&T Construction Assistant Manager interview:
  • Core subject
  • Safety Management
  • Management
Interview preparation tips for other job seekers - L&T focused on quality & safety with progress of the project.

I applied via Recruitment Consulltant and was interviewed in Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Aluminium formwork slab cycle, components, sqm work for per carpenters
  • Q2. How much sqm plastering done by Mason per day, concrete blocks sizes, workability, painting, gypsum work
  • Ans. 

    The amount of sqm plastering done by a Mason per day depends on various factors such as the size of concrete blocks, workability, painting, and gypsum work.

    • The size of concrete blocks can affect the amount of plastering done per day.

    • Workability of the plastering material can also affect the speed of work.

    • Painting and gypsum work can add to the time required for plastering.

    • It is difficult to give an exact number for the...

  • Answered by AI
  • Q3. Conventional shuttering, BBS, steel weight per metre, field test for steel
  • Q4. Field concrete tests, cement, grade of concrete
Round 3 - HR 

(1 Question)

  • Q1. Reason for job change, why should we hire you

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil basics and site execution work to be have good knowledge
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Aug 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Group Discussion 

All technical questions and taken interview 45 minutes i am fail to answer 3 from 50 but my performance good. 10 giants take interview.after all interview complited one list on notice board select 3 from 200 candidaye at L&T office andheri bombay.

Round 3 - HR 

(5 Questions)

  • Q1. You think what your position in company. Fix my position officer cader.suggest by hr and i agree. As per position seen my sellary structure and i say yes he will tell to me please submit your interview cos...
  • Q2. Yes officer cader
  • Q3. There is officer and manager both cader
  • Q4. What you want responsibility
  • Q5. You are take now officer

Interview Preparation Tips

Interview preparation tips for other job seekers - If you want to job in L&T prepare site problem and there fore you required some site experience and deep intrest in construction field number one company select number one employee only

I applied via Job Portal

Round 1 - One-on-one 

(1 Question)

  • Q1. Brief description on maintenance schedule.
  • Ans. 

    Maintenance schedule is a plan for regular upkeep of equipment or facilities to ensure their optimal performance.

    • Maintenance schedule includes regular inspections, cleaning, lubrication, and replacement of parts as needed.

    • It helps prevent breakdowns, prolongs equipment life, and reduces repair costs.

    • Examples of maintenance schedules include daily, weekly, monthly, and annual checklists.

    • Maintenance schedules should be t...

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. Technical specifications regarding excavator.

Interview Preparation Tips

Interview preparation tips for other job seekers - Best wishes for their future endeavours.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Your previous experience
  • Q2. Describe about yourself
  • Q3. Asked about my management skills

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be confident on, what you have done in your previous job.

L&T Construction Interview FAQs

How many rounds are there in L&T Construction Assistant Manager interview?
L&T Construction interview process usually has 2 rounds. The most common rounds in the L&T Construction interview process are Technical, Resume Shortlist and HR.
What are the top questions asked in L&T Construction Assistant Manager interview?

Some of the top questions asked at the L&T Construction Assistant Manager interview -

  1. How much sqm plastering done by Mason per day, concrete blocks sizes, workabili...read more
  2. Elaborate VT pump installation process step by step.. How many valves & types u...read more
  3. How to work in metro city with EPB mach...read more

Tell us how to improve this page.

L&T Construction Assistant Manager Interview Process

based on 5 interviews in last 1 year

1 Interview rounds

  • Technical Round
View more

People are getting interviews through

based on 10 L&T Construction interviews
Job Portal
WalkIn
50%
30%
20% candidates got the interview through other sources.
Moderate Confidence
?
Moderate Confidence means the data is based on a sufficient number of responses received from the candidates
L&T Construction Assistant Manager Salary
based on 1.1k salaries
₹6 L/yr - ₹17.8 L/yr
32% more than the average Assistant Manager Salary in India
View more details

L&T Construction Assistant Manager Reviews and Ratings

based on 289 reviews

3.9/5

Rating in categories

3.9

Skill development

2.9

Work-Life balance

3.8

Salary & Benefits

4.3

Job Security

3.4

Company culture

3.3

Promotions/Appraisal

3.3

Work Satisfaction

Explore 289 Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹6 L/yr - ₹17.8 L/yr

Senior Engineer
856 salaries
unlock blur

₹3 L/yr - ₹12.2 L/yr

Assistant Construction Manager
526 salaries
unlock blur

₹5.4 L/yr - ₹17.5 L/yr

Civil Site Engineer
377 salaries
unlock blur

₹1.6 L/yr - ₹8.3 L/yr

Assistant Engineering Manager
322 salaries
unlock blur

₹6 L/yr - ₹17 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.3
Compare

Shapoorji Pallonji Group

4.2
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview