Filter interviews by
I was interviewed in Jan 2025.
I have 5 years of experience in HRD, worked in Mumbai and Bangalore. Knowledgeable about CLMS.
5 years of experience in HRD
Worked in Mumbai and Bangalore
Knowledgeable about CLMS
Yes, I am willing to travel to 5-6 sites in Karnataka if required for the job.
I am open to traveling to different sites within Karnataka as part of my job responsibilities.
I have previous experience in managing multiple sites in different locations.
I am familiar with the geography and culture of Karnataka, which will help me in adapting to new locations.
I am willing to relocate if necessary for the job.
Welding machines are used to join materials together using heat and pressure. The choice of welding machine and material depends on the specific requirements of the project.
Different types of welding machines are used for different welding processes such as MIG, TIG, and stick welding.
The material being welded determines the type of welding machine and welding process to be used.
Factors such as material thickness, join...
GVPR Engineers interview questions for popular designations
Get interview-ready with Top GVPR Engineers Interview Questions
I applied via Walk-in and was interviewed in Nov 2023. There were 3 interview rounds.
Hydro testing is a process of testing the integrity of pipelines by filling them with water and pressurizing them to ensure they can withstand the required pressure.
Pipelines are filled with water and pressurized to a specified pressure level.
Pressure is held for a specified duration to check for leaks or weaknesses.
Any leaks or weaknesses found are repaired before the pipeline is put into service.
Water pressure in a pipeline can vary depending on factors such as pipe diameter, flow rate, and elevation changes.
Water pressure is typically measured in pounds per square inch (PSI).
Factors affecting water pressure include pipe diameter, flow rate, elevation changes, and friction losses.
For example, a pipeline with a larger diameter will have lower water pressure compared to a pipeline with a smaller diameter at the ...
Special joints in MS pipes are used for specific purposes like connecting pipes of different materials or sizes.
Special joints include flanged joints, expansion joints, and mechanical couplings.
Flanged joints are used for connecting pipes to valves or other equipment.
Expansion joints allow for movement in the piping system due to temperature changes.
Mechanical couplings are used to connect pipes of different materials ...
The welding rod used depends on the type of metal being welded and the welding process being used.
Different welding rods are used for different types of metals such as steel, aluminum, and stainless steel.
The welding rod must be compatible with the welding process being used, such as stick welding, MIG welding, or TIG welding.
Common welding rods include E6010, E7018, ER4043, and ER308L.
DI Pepe water testing pressure is a crucial aspect of ensuring pipeline safety and efficiency.
DI Pepe water testing pressure refers to the process of measuring the pressure of water in the pipeline to ensure it is within safe operating limits.
This testing is essential for detecting any leaks, blockages, or other issues that could compromise the integrity of the pipeline.
Regular water testing pressure helps in maintaini...
DI Pepe length and Daya is a measurement used in pipeline construction to determine the distance between two points.
DI Pepe length is the distance between two pipeline joints, typically measured in meters or feet.
Daya is the depth at which the pipeline is buried underground, usually measured in meters.
Understanding DI Pepe length and Daya is crucial for ensuring proper installation and maintenance of pipelines.
A DI pipe push up joint is a type of joint used in ductile iron pipelines to connect two pipes together.
DI pipe push up joints are designed to allow for easy installation and maintenance of pipelines.
They typically consist of a rubber gasket that fits between the two pipe ends, creating a watertight seal.
The joint is then secured with bolts or clamps to ensure a secure connection.
DI pipe push up joints are commonly use...
I applied via Referral and was interviewed in Sep 2023. There were 2 interview rounds.
I applied via Company Website and was interviewed in Dec 2023. There were 2 interview rounds.
I applied via Referral and was interviewed before Aug 2023. There was 1 interview round.
Top trending discussions
The duration of GVPR Engineers interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 58 interviews
Interview experience
based on 782 reviews
Rating in categories
Senior Engineer
234
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
154
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
154
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
148
salaries
| ₹0 L/yr - ₹0 L/yr |
Mechanical Engineer
66
salaries
| ₹0 L/yr - ₹0 L/yr |
L&T Construction
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company