Upload Button Icon Add office photos

GVPR Engineers

Compare button icon Compare button icon Compare

Filter interviews by

GVPR Engineers Deputy Manager Interview Questions and Answers

Updated 2 Jul 2024

GVPR Engineers Deputy Manager Interview Experiences

3 interviews found

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Family background
  • Q2. Professional background
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Family background
  • Q2. Professional background

Deputy Manager Interview Questions Asked at Other Companies

asked in HDFC Bank
Q1. 1.WHAT IS SPECIAL OF UR HOME TOWN 2.Who is Main compitetor with u ... read more
Q2. How would you sale our products to your existing clients?
asked in ICICI Bank
Q3. What are the important ratios you will check to sanction a loan t ... read more
Q4. What we do for shortage of material received?
Q5. What was your major master areas?

Interview Questionnaire 

3 Questions

  • Q1. Design mix m25
  • Ans. 

    Design mix M25 is a concrete mix with a compressive strength of 25 MPa after 28 days.

    • M25 mix consists of 1 part cement, 1 part coarse aggregates, and 2 parts fine aggregates.

    • Water-cement ratio should be maintained at 0.5 for M25 mix.

    • M25 mix is commonly used in construction of buildings, bridges, and roads.

    • The mix should be properly cured for at least 28 days to achieve the desired strength.

  • Answered by AI
  • Q2. Site execution practically
  • Q3. Mivan shuttering

Interview Preparation Tips

Interview preparation tips for other job seekers - Practice site execution method's

Interview questions from similar companies

I applied via Naukri.com and was interviewed before Sep 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Gm 

(3 Questions)

  • Q1. What is your last project and its site design
  • Q2. What is the covered area of project
  • Ans. 

    The covered area of the project is approximately 10,000 square feet.

    • The covered area includes the indoor space of the project.

    • It does not include any outdoor space or open areas.

    • The exact covered area may vary depending on the project.

    • In this particular project, the covered area is approximately 10,000 square feet.

  • Answered by AI
  • Q3. What type of building

Interview Preparation Tips

Interview preparation tips for other job seekers - Believe in yourself and done your all duties responsibilities properly and report your senior.

I applied via Company Website and was interviewed in Feb 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Power Transmission & distribution

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview for technical purpose.

I applied via Approached by Company and was interviewed before Sep 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. General and deep questions regarding the subject will be asked as per the position applied and past experience.
Round 3 - HR 

(1 Question)

  • Q1. Regarding salary negotiation the discussion was on. TPL always gives a hike from current salary where no other current contractor in the industry can offer the same. Their package is fixed.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well according to your past experiences. Don’t have any loose end in what you have worked on. Be vigilant and have patience while replying becoz mostly interview will be took on Skype during 2019 nowadays using Microsoft teams

I was interviewed before May 2020.

Interview Questionnaire 

1 Question

  • Q1. How to fix rate of 1 cum metre rcc for m10 and m20
  • Ans. 

    To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.

    • Determine the cost of materials required for 1 cum metre RCC for M10 and M20

    • Calculate the labor cost involved in the construction process

    • Consider the cost of equipment required for the construction process

    • Include overheads like transportation, insurance, and taxes

    • Compare the ra...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - technicalviru.in

I applied via Naukri.com and was interviewed before Sep 2020. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. What we do for shortage of material received?
  • Ans. 

    When faced with a shortage of material received, we take immediate action to address the issue and minimize any negative impact.

    • Contact the supplier to inform them about the shortage and request immediate resolution

    • Check inventory records and cross-verify with the supplier's delivery documentation

    • Investigate the cause of the shortage, such as shipping errors or miscommunication

    • Implement measures to prevent future short...

  • Answered by AI
  • Q2. Can we do correction in invoice? if ans is yes then what are the further steps?
  • Ans. 

    Yes, corrections can be made in an invoice by following certain steps.

    • The correction should be made as soon as possible to avoid any confusion.

    • The original invoice should not be destroyed, but rather marked as 'void' or 'cancelled'.

    • A new invoice should be created with the correct information and a reference to the original invoice.

    • The reason for the correction should be clearly stated on the new invoice.

    • Both the origin...

  • Answered by AI
  • Q3. Various SAP T code for Issues
  • Ans. 

    Various SAP T codes for Issues

    • MB21 - Create Reservation

    • MB1A - Goods Withdrawal

    • MB1B - Transfer Posting

    • MB1C - Other Goods Receipts

    • MB1E - Create Stock Transport Order

    • MB1F - Goods Issue

    • MB1H - Maintain Reservation

    • MB1T - Transfer Posting

    • MB1A - Goods Withdrawal

    • MB1B - Transfer Posting

    • MB1C - Other Goods Receipts

    • MB1E - Create Stock Transport Order

    • MB1F - Goods Issue

    • MB1H - Maintain Reservation

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be positive; interviewer may cross checks your confidence through various counter question, but what is right is right it can not be wrong, if interviewer says it wrong then don't go by interviewer words, always stick with your belief and knowledge.

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Feb 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Related to piping knowledge as per ASME Section
Round 2 - HR 

(1 Question)

  • Q1. Working culture and salary package
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Gear box replacement work

Round 2 - HR 

(6 Questions)

  • Q1. Motor replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and old motor remove and new motor replace and bolts nut tightening s...
  • Q2. Barring checking and replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and blumber block top cover open and old slue Barring remove and new slue...
  • Q3. Gear box replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and old gear box remove and new gear box replace and bolts nut tig...
  • Q4. V-scraper replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and old v -scraper remove and new v-scraper replace and bolts nut...
  • Q5. Barring greasing work and safety first and all ppes sure and paper work and walked away clean and fresh and Greasing gun and all pulley checking and savings Greasing work and sure and paper work cancelled
  • Q6. Discharge Chute replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and old discharge chute remove and new discharge chute repl...

Interview Preparation Tips

Interview preparation tips for other job seekers - Because of the opportunity for growth and advancement

GVPR Engineers Interview FAQs

How many rounds are there in GVPR Engineers Deputy Manager interview?
GVPR Engineers interview process usually has 1 rounds. The most common rounds in the GVPR Engineers interview process are HR.
How to prepare for GVPR Engineers Deputy Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at GVPR Engineers. The most common topics and skills that interviewers at GVPR Engineers expect are 132Kv, 220Kv, 33Kv, 400Kv and Bulk Hiring.
What are the top questions asked in GVPR Engineers Deputy Manager interview?

Some of the top questions asked at the GVPR Engineers Deputy Manager interview -

  1. Design mix ...read more
  2. Site execution practica...read more
  3. Mivan shutter...read more

Tell us how to improve this page.

GVPR Engineers Deputy Manager Interview Process

based on 2 interviews

Interview experience

4
  
Good
View more
GVPR Engineers Deputy Manager Salary
based on 23 salaries
₹6.7 L/yr - ₹13.8 L/yr
At par with the average Deputy Manager Salary in India
View more details

GVPR Engineers Deputy Manager Reviews and Ratings

based on 13 reviews

3.2/5

Rating in categories

2.7

Skill development

3.1

Work-life balance

2.8

Salary

2.6

Job security

2.8

Company culture

2.5

Promotions

2.7

Work satisfaction

Explore 13 Reviews and Ratings
Senior Engineer
234 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
154 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
154 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
149 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Mechanical Engineer
66 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare GVPR Engineers with

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview