Filter interviews by
Design mix M25 is a concrete mix with a compressive strength of 25 MPa after 28 days.
M25 mix consists of 1 part cement, 1 part coarse aggregates, and 2 parts fine aggregates.
Water-cement ratio should be maintained at 0.5 for M25 mix.
M25 mix is commonly used in construction of buildings, bridges, and roads.
The mix should be properly cured for at least 28 days to achieve the desired strength.
I applied via Naukri.com and was interviewed before Sep 2021. There were 2 interview rounds.
The covered area of the project is approximately 10,000 square feet.
The covered area includes the indoor space of the project.
It does not include any outdoor space or open areas.
The exact covered area may vary depending on the project.
In this particular project, the covered area is approximately 10,000 square feet.
I applied via Company Website and was interviewed in Feb 2020. There was 1 interview round.
I applied via Approached by Company and was interviewed before Sep 2021. There were 3 interview rounds.
I was interviewed before May 2020.
To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.
Determine the cost of materials required for 1 cum metre RCC for M10 and M20
Calculate the labor cost involved in the construction process
Consider the cost of equipment required for the construction process
Include overheads like transportation, insurance, and taxes
Compare the ra...
I applied via Naukri.com and was interviewed before Sep 2020. There were 4 interview rounds.
When faced with a shortage of material received, we take immediate action to address the issue and minimize any negative impact.
Contact the supplier to inform them about the shortage and request immediate resolution
Check inventory records and cross-verify with the supplier's delivery documentation
Investigate the cause of the shortage, such as shipping errors or miscommunication
Implement measures to prevent future short...
Yes, corrections can be made in an invoice by following certain steps.
The correction should be made as soon as possible to avoid any confusion.
The original invoice should not be destroyed, but rather marked as 'void' or 'cancelled'.
A new invoice should be created with the correct information and a reference to the original invoice.
The reason for the correction should be clearly stated on the new invoice.
Both the origin...
Various SAP T codes for Issues
MB21 - Create Reservation
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
MB1T - Transfer Posting
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
I applied via Referral and was interviewed before Feb 2023. There were 2 interview rounds.
I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.
Gear box replacement work
based on 2 interviews
Interview experience
based on 13 reviews
Rating in categories
Senior Engineer
234
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
154
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
154
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
149
salaries
| ₹0 L/yr - ₹0 L/yr |
Mechanical Engineer
66
salaries
| ₹0 L/yr - ₹0 L/yr |
L&T Construction
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company