Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by H.G. Infra Engineering Team. If you also belong to the team, you can get access from here

H.G. Infra Engineering Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Clear (1)

H.G. Infra Engineering Deputy Manager Interview Questions and Answers

Updated 30 Nov 2024

H.G. Infra Engineering Deputy Manager Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

Interview Preparation Tips

Interview preparation tips for other job seekers - They should work on KSA ( knowledge, skill, attitude) to get dream job.

Interview questions from similar companies

Interview Questionnaire 

10 Questions

  • Q1. 1. What you understand the requirement of shuttering material at project site?
  • Ans. 

    Shuttering material refers to temporary structures used in construction projects to support concrete during the curing process.

    • Shuttering material is required to provide formwork support for concrete structures.

    • It helps in creating the desired shape and structure of the concrete element.

    • Common types of shuttering materials include plywood, steel, aluminum, and plastic.

    • The choice of material depends on factors like proj...

  • Answered by AI
  • Q2. 2.Do you able to formulate claim raising and defending strategy basis on contractual provision ?
  • Ans. 

    Yes

    • Yes, I am able to formulate claim raising and defending strategies based on contractual provisions.

    • I have extensive experience in contract management and have successfully raised and defended claims in my previous roles.

    • I am well-versed in analyzing contractual provisions and identifying the relevant clauses for formulating effective strategies.

    • I have a strong understanding of contract law and can leverage it to dev...

  • Answered by AI
  • Q3. 3. What do you understand about preliminary drawing, as-built drawing, drawing schedule, proof checking ?
  • Ans. 

    Preliminary drawing, as-built drawing, drawing schedule, and proof checking are all important aspects of the design and construction process.

    • Preliminary drawing: Initial sketches or plans that outline the basic design concept.

    • As-built drawing: Final drawings that reflect any changes made during construction.

    • Drawing schedule: A timeline or list that outlines when each drawing is expected to be completed.

    • Proof checking: ...

  • Answered by AI
  • Q4. 4. How of sources and requirement (quantity) of materials in projects as per tender ?
  • Ans. 

    The sources and quantity of materials in projects are determined based on the tender requirements.

    • The sources of materials in projects are determined through a procurement process.

    • The quantity of materials required is specified in the tender documents.

    • The tender documents may include a bill of quantities or a detailed scope of work.

    • The procurement team evaluates potential suppliers and selects the most suitable ones.

    • Th...

  • Answered by AI
  • Q5. 5.Explore your knowledge of automated systems, software and IT applications such as MS Project, Prima Vera, SAP, AutoCAD, Auto Plotter, Road Estimator & CalCquen.
  • Q6. 6. Rate Analysis of Earth Work for Road Project.
  • Ans. 

    Rate analysis of earthwork for road project involves calculating the cost of excavation, transportation, and compaction of soil.

    • Rate analysis helps in estimating the cost of earthwork for road construction.

    • It involves determining the quantity of earthwork required and the rates for excavation, transportation, and compaction.

    • The rates are based on factors like the type of soil, distance of transportation, and equipment ...

  • Answered by AI
  • Q7. 7. What is S-Curve ? Explain with example.
  • Ans. 

    The S-Curve is a graphical representation of the growth or progress of a project or business over time.

    • The S-Curve is named after its shape, which resembles the letter 'S'.

    • It is commonly used in project management to track and visualize the progress of tasks or activities.

    • The curve typically shows slow progress at the beginning, followed by a rapid growth phase, and then a tapering off towards the end.

    • The S-Curve helps...

  • Answered by AI
  • Q8. 8. Haw can you prepare R0 Budget for a Road Project ? Describe sequence in brief.
  • Ans. 

    Preparing a R0 budget for a road project involves several steps and considerations.

    • Identify the scope and objectives of the road project

    • Estimate the quantities of materials and resources required

    • Determine the unit costs of materials, labor, and equipment

    • Calculate the total cost for each item and activity

    • Consider any contingencies or unforeseen expenses

    • Sum up the costs to create the overall budget

    • Review and refine the b

  • Answered by AI
  • Q9. 9. What is Change of Scope in Road Project ? Describe sequence in brief.
  • Ans. 

    Change of Scope in a road project refers to any modifications or alterations made to the original project plan.

    • Change of scope can include changes in project objectives, deliverables, timelines, or budget.

    • It may involve adding or removing features, adjusting the project scope, or redefining project requirements.

    • For example, if a road project initially planned to construct a two-lane road but later decides to expand it ...

  • Answered by AI
  • Q10. 10. What is Price Adjustment ? What is its role in Project Cost ? How to calculate it ?
  • Ans. 

    Price adjustment is a mechanism to account for changes in project costs. It helps in maintaining project profitability.

    • Price adjustment is a provision in a contract that allows for changes in project costs due to various factors such as inflation, currency fluctuations, or changes in material prices.

    • Its role in project cost is to ensure that the project remains financially viable and profitable despite cost fluctuation...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please be cool and clam during Interview. Do not hesitate. Most of the Answers of asked Questions has been already very conversant with you and it is related to your routine/periodic work. Do not make any specific strategy. If any Questions are beyond your knowledge, please say clearly sorry.
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Jan 2025.

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jun 2024. There was 1 interview round.

Interview Preparation Tips

Topics to prepare for Larsen & Toubro Limited Senior Manager interview:
  • Project Management
Interview experience
4
Good
Difficulty level
Hard
Process Duration
6-8 weeks
Result
Not Selected

I applied via Recruitment Consulltant and was interviewed before May 2023. There were 2 interview rounds.

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Dec 2022. There were 3 interview rounds.

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Dec 2023. There was 1 interview round.

I applied via Company Website and was interviewed in Oct 2021. There were 3 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well for ur work done and ask for a competitive package

I applied via Referral and was interviewed in Mar 2021. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. How many PTR engaged at BT laying
  • Ans. 

    I don't have the available data to answer this question.

    • Sorry, I don't have access to the current data on the number of PTR engaged at BT laying.

    • I suggest checking with the relevant department or team for the latest information.

  • Answered by AI
  • Q2. 2 nos are engaged at BT lalying
  • Q3. Crusher make model and process of crushing ?
  • Ans. 

    The crusher make model and process of crushing depend on the type of material being crushed.

    • The make and model of the crusher will vary depending on the application and material being crushed.

    • The process of crushing also varies depending on the material and desired output size.

    • For example, a jaw crusher may be used for primary crushing of hard rock, while a cone crusher is more suitable for secondary or tertiary crushi...

  • Answered by AI
  • Q4. Puzolona 300TPh

Interview Preparation Tips

Interview preparation tips for other job seekers - Concentrate on road construction equipments
Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Always feel comfortable while facing the interview
Contribute & help others!
anonymous
You can choose to be anonymous

H.G. Infra Engineering Interview FAQs

How many rounds are there in H.G. Infra Engineering Deputy Manager interview?
H.G. Infra Engineering interview process usually has 1 rounds. The most common rounds in the H.G. Infra Engineering interview process are Technical.
What are the top questions asked in H.G. Infra Engineering Deputy Manager interview?

Some of the top questions asked at the H.G. Infra Engineering Deputy Manager interview -

  1. BBS preparat...read more
  2. Drawings rela...read more

Recently Viewed

INTERVIEWS

Jindal Steel and Power

No Interviews

INTERVIEWS

H.G. Infra Engineering

No Interviews

INTERVIEWS

Jindal Steel and Power

No Interviews

INTERVIEWS

Mitcon Consultancy and Engineering Services

No Interviews

INTERVIEWS

Jindal Steel and Power

No Interviews

INTERVIEWS

Optum Global Solutions

No Interviews

INTERVIEWS

H.G. Infra Engineering

No Interviews

INTERVIEWS

Jindal Steel and Power

No Interviews

INTERVIEWS

Jindal Steel and Power

No Interviews

INTERVIEWS

Jindal Steel and Power

No Interviews

Tell us how to improve this page.

H.G. Infra Engineering Deputy Manager Interview Process

based on 5 interviews

Interview experience

3.8
  
Good
View more
H.G. Infra Engineering Deputy Manager Salary
based on 32 salaries
₹6.5 L/yr - ₹12 L/yr
At par with the average Deputy Manager Salary in India
View more details

H.G. Infra Engineering Deputy Manager Reviews and Ratings

based on 12 reviews

3.4/5

Rating in categories

3.7

Skill development

3.4

Work-life balance

3.8

Salary

3.3

Job security

3.3

Company culture

3.8

Promotions

3.3

Work satisfaction

Explore 12 Reviews and Ratings
Assistant Manager
123 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
84 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineer
78 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
69 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Structural Engineer
67 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare H.G. Infra Engineering with

Ashoka Buildcon

4.1
Compare

IRB Infrastructure

4.0
Compare

Nagarjuna Construction Company

4.1
Compare

PNC Infratech

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview