Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Mkc Infrastructure Team. If you also belong to the team, you can get access from here

Mkc Infrastructure Verified Tick

Compare button icon Compare button icon Compare
3.6

based on 287 Reviews

Filter interviews by

Mkc Infrastructure Interview Questions, Process, and Tips

Updated 21 Oct 2024

Top Mkc Infrastructure Interview Questions and Answers

View all 21 questions

Mkc Infrastructure Interview Experiences

Popular Designations

22 interviews found

Process Developer Interview Questions & Answers

user image Ruksar Rukku

posted on 21 Oct 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Mkn hyugt tgtfedecjnygrf resecfgh
  • Q2. Jjkiu7tgtftr ffgbhhu jnhtdeswswaswqa

Process Developer Interview Questions asked at other Companies

Q1. What is RTR? What is depreciation?types of depreciation and also journal entries
View answer (28)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. About Role in planning
  • Q2. About role in billing

Planning Engineer Interview Questions asked at other Companies

Q1. Prepare a small given example site schedule with sequencing and duration determine project duration in MSP/on Paper What is critical path method? How will you identify while making on paper rather than MSP? How would you track schedule-Proc... read more
View answer (1)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Campus Placement

Round 1 - Aptitude Test 

Gerneral Aptitude Questions

Round 2 - HR 

(4 Questions)

  • Q1. Tell me about yourself
  • Q2. Civil Software knowledges
  • Q3. Which project you have done in your final year project
  • Q4. What is Super elevation?
  • Ans. 

    Super elevation is the banking of a road or railway track around a curve to counteract the effects of centrifugal force.

    • Super elevation is the tilt or incline provided to the outer edge of a road or railway track on a curve.

    • It helps in counteracting the effects of centrifugal force, allowing vehicles or trains to travel at higher speeds safely.

    • The amount of super elevation required depends on factors like design speed,...

  • Answered by AI

Civil Graduate Engineer Trainee Interview Questions asked at other Companies

Q1. Describe how will you design a foundation ? Add all the procedures and all the tests that are pre requistic for construction ?
View answer (1)

Engineer Interview Questions & Answers

user image ANIKET MAURYA

posted on 5 Feb 2024

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
-
Result
-

I applied via Company Website

Round 1 - Technical 

(1 Question)

  • Q1. SAP, what is Rolling margin method, Unit weight of Steel Bar all diameters, Other Engineering Question related to RCC
  • Ans. 

    The rolling margin method is a technique used in engineering to calculate the margin of safety in structural design.

    • The rolling margin method involves calculating the margin of safety by considering the load and resistance factors.

    • It is commonly used in the design of reinforced concrete structures.

    • The margin of safety is calculated by dividing the available strength by the required strength.

    • The unit weight of steel bar...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Discuss salary, Discuss previous company why you left

Skills evaluated in this interview

Engineer Interview Questions asked at other Companies

Q1. ❖ If a team member is unable to carry out his work, he is doing it repetitively, how would you handle it?, would you like to work only on lifing of components, or would you be ready to shift to other departments?
View answer (5)

Mkc Infrastructure interview questions for popular designations

 Planning Engineer

 (2)

 QS Engineer

 (2)

 Admin Manager

 (1)

 Assistant Accounts Manager

 (1)

 Assistant Manager

 (1)

 Civil Graduate Engineer Trainee

 (1)

 Deputy Manager

 (1)

 Electrician

 (1)

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Surveyor realated any questions
  • Q2. Auto cad realated any questions

Senior Surveyor Interview Questions asked at other Companies

Q1. What is the difference of true north and magnetic north ?
View answer (1)

Get interview-ready with Top Mkc Infrastructure Interview Questions

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. About experience and job profile

Deputy Manager Interview Questions asked at other Companies

Q1. 1.WHAT IS SPECIAL OF UR HOME TOWN 2.Who is Main compitetor with us and which products...3.what is main business in your area and its functions...4 Previous comoany achevements 5.Your strengts and weakness.
View answer (64)

Jobs at Mkc Infrastructure

View all
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Gernal electronic and chromatography word question

Interview Preparation Tips

Interview preparation tips for other job seekers - Go with basic knowledge of your field

Service Engineer Interview Questions asked at other Companies

Q1. What are the compulsory policy excess in four wheeler private vehicles?
View answer (11)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Royalty rate of soil and gravel
  • Ans. 

    The royalty rate of soil and gravel varies depending on factors such as location, quality, and market demand.

    • Royalty rates for soil and gravel are typically calculated as a percentage of the total value of the material extracted.

    • Factors influencing royalty rates include the location of the extraction site, the quality of the material, and the current market demand.

    • For example, a gravel pit located in a high-demand area...

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. What is the hindrance at your site
  • Ans. 

    The hindrance at our site is outdated technology and lack of proper training for employees.

    • Outdated technology slows down processes and hinders productivity

    • Lack of proper training leads to inefficiency and mistakes

    • Both issues need to be addressed to improve overall performance

  • Answered by AI
  • Q2. About permission process for digging soil

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

Assistant Manager Interview Questions asked at other Companies

Q1. You are Handling cash operations then how you manage operations with sales ?
View answer (86)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2023. There was 1 interview round.

Round 1 - Coding Test 

Conversation of GST related questanier

Assistant Accounts Manager Interview Questions asked at other Companies

Q1. What kind of task in accounts you don't want to do?
View answer (2)

Senior Engineer Interview Questions & Answers

user image Anand Kumar Singh

posted on 3 Sep 2023

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Basic questions
  • Ans. Iike which place you have to work ,what's your current salary
  • Answered by Anand Kumar Singh
Round 2 - Technical 

(1 Question)

  • Q1. Quantity related question arise

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (54)

Mkc Infrastructure Interview FAQs

How many rounds are there in Mkc Infrastructure interview?
Mkc Infrastructure interview process usually has 1-2 rounds. The most common rounds in the Mkc Infrastructure interview process are HR, Technical and Resume Shortlist.
How to prepare for Mkc Infrastructure interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Mkc Infrastructure. The most common topics and skills that interviewers at Mkc Infrastructure expect are Accounting, Corporate Affairs, Government Relations, Liaison and Recruitment.
What are the top questions asked in Mkc Infrastructure interview?

Some of the top questions asked at the Mkc Infrastructure interview -

  1. What is FDD what is the density of soil Loose and Compact...read more
  2. What is the IS code of BBS & Measuremen...read more
  3. How would you design a box culvert step by ste...read more
How long is the Mkc Infrastructure interview process?

The duration of Mkc Infrastructure interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Mkc Infrastructure Interview Process

based on 8 interviews in last 1 year

Interview experience

4.5
  
Good
View more

People are getting interviews through

based on 15 Mkc Infrastructure interviews
Company Website
Job Portal
WalkIn
Campus Placement
Referral
33%
20%
13%
7%
7%
20% candidates got the interview through other sources.
High Confidence
?
High Confidence means the data is based on a large number of responses received from the candidates.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.3
 • 398 Interviews
GMR Group Interview Questions
4.1
 • 74 Interviews
Ashoka Buildcon Interview Questions
4.1
 • 64 Interviews
GAMMON INDIA Interview Questions
3.9
 • 29 Interviews
View all

Mkc Infrastructure Reviews and Ratings

based on 287 reviews

3.6/5

Rating in categories

3.5

Skill development

3.3

Work-Life balance

3.2

Salary & Benefits

3.4

Job Security

3.2

Company culture

3.2

Promotions/Appraisal

3.3

Work Satisfaction

Explore 287 Reviews and Ratings
Engineer/Sr. Engineer - Planning & Billing

Karimganj,

Dhrol

+1

4-7 Yrs

Not Disclosed

Engineer QA/QC

Gandhinagar

2-4 Yrs

Not Disclosed

Mechanical Engineer

Gandhinagar

3-4 Yrs

Not Disclosed

Explore more jobs
Executive Accountant
32 salaries
unlock blur

₹2 L/yr - ₹4.2 L/yr

Junior Engineer
30 salaries
unlock blur

₹1.8 L/yr - ₹4 L/yr

Highway Engineer
26 salaries
unlock blur

₹1.9 L/yr - ₹4.9 L/yr

Senior Engineer
24 salaries
unlock blur

₹4 L/yr - ₹7.8 L/yr

Junior Engineer Civil
22 salaries
unlock blur

₹1.6 L/yr - ₹3 L/yr

Explore more salaries
Compare Mkc Infrastructure with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.3
Compare

Reliance Infrastructure

4.1
Compare

GMR Group

4.1
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview