Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Mkc Infrastructure Team. If you also belong to the team, you can get access from here

Mkc Infrastructure Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Mkc Infrastructure Assistant Manager Interview Questions and Answers

Updated 24 Oct 2023

Mkc Infrastructure Assistant Manager Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Royalty rate of soil and gravel
  • Ans. 

    The royalty rate of soil and gravel varies depending on factors such as location, quality, and market demand.

    • Royalty rates for soil and gravel are typically calculated as a percentage of the total value of the material extracted.

    • Factors influencing royalty rates include the location of the extraction site, the quality of the material, and the current market demand.

    • For example, a gravel pit located in a high-demand area...

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. What is the hindrance at your site
  • Ans. 

    The hindrance at our site is outdated technology and lack of proper training for employees.

    • Outdated technology slows down processes and hinders productivity

    • Lack of proper training leads to inefficiency and mistakes

    • Both issues need to be addressed to improve overall performance

  • Answered by AI
  • Q2. About permission process for digging soil

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

Assistant Manager Jobs at Mkc Infrastructure

View all

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. EN 15085-2 and the ISO 3834
  • Q2. Welding Experience and Previous job details
  • Ans. 

    I have 5 years of welding experience in a manufacturing company where I was responsible for welding various metal components.

    • Worked as a welder for 5 years in a manufacturing company

    • Responsible for welding metal components

    • Experience with different welding techniques such as MIG, TIG, and stick welding

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - Technical 

(1 Question)

  • Q1. Lattice tower Sub bracing design
  • Ans. 

    Lattice tower sub bracing design involves the structural support system for the tower.

    • Sub bracing design is crucial for maintaining the stability and strength of lattice towers.

    • The design should consider factors such as wind load, weight distribution, and material strength.

    • Examples of sub bracing design elements include diagonal bracing, horizontal bracing, and cross bracing.

    • Computer-aided design software is often used...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - HR 

(5 Questions)

  • Q1. Basic question of personal,professional questions
  • Q2. Technical with Manager
  • Q3. About current company KPI
  • Q4. Customer oriented result
  • Ans. 

    Being customer oriented means focusing on delivering results that meet the needs and expectations of the customer.

    • Understanding the needs and preferences of customers

    • Providing excellent customer service

    • Ensuring customer satisfaction and loyalty

    • Adapting products or services to meet customer demands

    • Seeking feedback and implementing improvements based on customer input

  • Answered by AI
  • Q5. Special cost saving projects
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Load test process
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2024. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Job description, location ,salary negotiation
Round 2 - Technical 

(1 Question)

  • Q1. Core working skill , working related point to point questions
Round 3 - HR 

(1 Question)

  • Q1. Final offer given by hr

Interview Preparation Tips

Interview preparation tips for other job seekers - Good interview experience
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Self information work experience salary requirements
Round 3 - Technical 

(1 Question)

  • Q1. Technical questions for relevant department

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical background is must.
Speak confident.
Must prepare for technical concepts which department want to work there.

I applied via Referral and was interviewed in Nov 2021. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the roles and responsibilities of safety person as per the BOCW act
  • Ans. 

    The safety person's roles and responsibilities as per the BOCW act include ensuring safety measures are in place, conducting safety inspections, and providing safety training.

    • Ensuring safety measures are in place at the worksite

    • Conducting safety inspections to identify potential hazards

    • Providing safety training to workers and management

    • Maintaining records of safety inspections and incidents

    • Ensuring compliance with safe...

  • Answered by AI
  • Q2. What are the roles and responsibilities of you in your current organization
Round 2 - HR 

(1 Question)

  • Q1. Salary expectation and other facilities required.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good organization feeling positive toward the company
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via campus placement at National Institute of Construction Management and Research, Pune and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Material procurement
  • Q2. Different types of steel
  • Ans. 

    There are various types of steel, each with different properties and uses.

    • Carbon Steel: Contains varying amounts of carbon, used in construction and manufacturing.

    • Alloy Steel: Contains additional elements like nickel or chromium for improved strength and durability.

    • Stainless Steel: Contains chromium for corrosion resistance, commonly used in kitchen appliances and medical instruments.

    • Tool Steel: Designed for making too...

  • Answered by AI

I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Civil work regarding
  • Q2. I am ready for civil and structural.

Interview Preparation Tips

Interview preparation tips for other job seekers - Presently I' m working in ahluwalia contract India limited. I am working there in dental now. When are u calling me for interview , I am ready for interview.

Mkc Infrastructure Interview FAQs

How many rounds are there in Mkc Infrastructure Assistant Manager interview?
Mkc Infrastructure interview process usually has 3 rounds. The most common rounds in the Mkc Infrastructure interview process are Resume Shortlist, HR and Technical.
How to prepare for Mkc Infrastructure Assistant Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Mkc Infrastructure. The most common topics and skills that interviewers at Mkc Infrastructure expect are Accounting, Accounts Finalisation, Balance Sheet Finalisation, Bonds and DFT.
What are the top questions asked in Mkc Infrastructure Assistant Manager interview?

Some of the top questions asked at the Mkc Infrastructure Assistant Manager interview -

  1. What is the hindrance at your s...read more
  2. Royalty rate of soil and gra...read more
  3. About permission process for digging s...read more

Tell us how to improve this page.

Mkc Infrastructure Assistant Manager Interview Process

based on 5 interviews

Interview experience

4.4
  
Good
View more
Mkc Infrastructure Assistant Manager Salary
based on 19 salaries
₹4.8 L/yr - ₹9.6 L/yr
22% less than the average Assistant Manager Salary in India
View more details

Mkc Infrastructure Assistant Manager Reviews and Ratings

based on 5 reviews

3.7/5

Rating in categories

3.4

Skill development

2.8

Work-life balance

3.0

Salary

3.2

Job security

3.4

Company culture

2.9

Promotions

3.4

Work satisfaction

Explore 5 Reviews and Ratings
Assistant Manager To Manager

Gandhinagar

6-10 Yrs

₹ 8.4-7.56 LPA

Explore more jobs
Junior Engineer
30 salaries
unlock blur

₹1.8 L/yr - ₹4 L/yr

Executive Accountant
30 salaries
unlock blur

₹2 L/yr - ₹4.2 L/yr

Highway Engineer
27 salaries
unlock blur

₹1.9 L/yr - ₹4.9 L/yr

Mechanical Engineer
25 salaries
unlock blur

₹2.4 L/yr - ₹4.8 L/yr

Senior Engineer
24 salaries
unlock blur

₹4 L/yr - ₹7.8 L/yr

Explore more salaries
Compare Mkc Infrastructure with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Reliance Infrastructure

4.1
Compare

GMR Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview