QS roles include cost estimation, budgeting, tendering, contract administration, and project management.
Estimating and costing of construction projects
Preparing tender documents and analyzing bids
Contract administration and management
Project management and coordination
Ensuring compliance with regulations and standards
Overlapping can be monitored by using software tools that can detect and highlight overlapping areas.
Use software tools like AutoCAD, Revit, or Navisworks to detect overlapping elements
Check for clashes between different systems like mechanical, electrical, and plumbing
Perform regular clash detection tests during the design and construction phases
Ensure that all stakeholders are aware of the overlapping issues and work
Software used for quantity calculation includes AutoCAD, Revit, Bluebeam, PlanSwift, and On-Screen Takeoff.
AutoCAD is a popular software for 2D and 3D design and drafting
Revit is a BIM software used for building design and construction
Bluebeam is a PDF software with measurement tools for estimating
PlanSwift is a takeoff and estimating software for construction
On-Screen Takeoff is a digital takeoff software for construc
I applied via Company Website and was interviewed before Apr 2022. There were 2 interview rounds.
CA stands for Contract Administration. There are typically 3 schedules in a construction contract.
CA involves managing and enforcing the terms of a construction contract.
The 3 schedules in a construction contract are typically: Schedule of Values, Payment Schedule, and Change Order Schedule.
The Schedule of Values outlines the budget for the project, the Payment Schedule outlines when payments will be made, and the Chan...
EPC Contract stands for Engineering, Procurement, and Construction Contract.
EPC Contract is a type of construction contract where the contractor is responsible for the entire project from design to construction.
The contractor is responsible for the engineering, procurement, and construction of the project.
EPC Contracts are commonly used in large-scale infrastructure projects such as power plants, oil refineries, and hi...
FDD stands for Field Density Test. Loose soil density ranges from 1.2 to 1.4 g/cm³ and compacted soil density ranges from 1.4 to 1.6 g/cm³.
FDD is a test used to determine the density of soil in the field.
Loose soil density ranges from 1.2 to 1.4 g/cm³.
Compacted soil density ranges from 1.4 to 1.6 g/cm³.
The density of soil affects its strength and load-bearing capacity.
The density of soil can be increased through compac
OGL Sampling stands for OpenGL Sampling. It is a technique used to improve the quality of graphics rendering in computer graphics.
OGL Sampling is used to reduce aliasing and improve the quality of graphics.
It involves taking multiple samples of a pixel and averaging the color values to produce a smoother image.
The number of samples taken per pixel can be adjusted to balance quality and performance.
OGL Sampling is commo...
The IS code for BBS & Measurements is IS 13920:2016.
IS 13920:2016 is the Indian Standard code for detailing of reinforcement in concrete structures.
It provides guidelines for the preparation of bar bending schedules (BBS) and measurement of reinforcement.
The code specifies the requirements for the dimensions, shape, and position of reinforcement in various structural elements.
It also covers the calculation of cutting l...
Top trending discussions
I applied via Approached by Company and was interviewed in Mar 2023. There were 2 interview rounds.
posted on 28 Dec 2022
I applied via Approached by Company and was interviewed in Jun 2022. There were 2 interview rounds.
Rate analysis is the process of determining the rates of various items of work involved in a construction project.
It involves breaking down the cost of a project into individual components
It helps in estimating the total cost of a project
It helps in comparing the cost of different projects
Yes, I have done rate analysis for various construction projects
Steel reinforcement of piles is calculated based on the load capacity and design of the pile.
Determine the load capacity and design of the pile
Calculate the required cross-sectional area of steel reinforcement
Determine the spacing and diameter of the reinforcement bars
Calculate the total length of steel reinforcement required
Consider any additional factors such as corrosion protection
Ensure compliance with relevant cod
I applied via Walk-in and was interviewed in Jun 2024. There was 1 interview round.
posted on 21 Aug 2024
I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.
The size of a concrete cube is typically 150mm x 150mm x 150mm for standard testing purposes.
Standard size for concrete cube is 150mm x 150mm x 150mm
Used for testing the compressive strength of concrete
Other sizes may be used for specific projects or requirements
posted on 3 Mar 2024
Shuttering quantity calculation involves determining the amount of formwork needed for a construction project.
Calculate the surface area of the structure that needs formwork
Determine the type of formwork material to be used
Consider the complexity of the structure and any special requirements
Account for wastage and extra material for safety
Use standard formulas or software for accurate calculations
posted on 3 May 2023
I applied via Campus Placement and was interviewed in Apr 2023. There were 3 interview rounds.
based on 1 review
Rating in categories
Junior Engineer
30
salaries
| ₹1.8 L/yr - ₹4 L/yr |
Executive Accountant
30
salaries
| ₹2 L/yr - ₹4.2 L/yr |
Highway Engineer
26
salaries
| ₹1.9 L/yr - ₹4.9 L/yr |
Senior Engineer
24
salaries
| ₹4 L/yr - ₹7.8 L/yr |
Assistant Manager
22
salaries
| ₹4 L/yr - ₹9.6 L/yr |
Larsen & Toubro Limited
Tata Projects
Reliance Infrastructure
GMR Group