Basic specifications of plastering include thickness, mix ratio, curing time, etc.
Deductions for plastering depend on the type of surface and thickness of plaster
Bar Bending Schedule is a document that lists the reinforcement details of a structure
Cutting length for stirrups of beam depends on the diameter of the stirrup and spacing
Basic documentation for certifi...
To take block work and plastering quantity from Autocad rqwing, follow these steps:
Open the Autocad rqwing file
Select the block work and plastering area
Use the 'Measure' tool to calculate the area
Multiply the area by the thickness of the block work and plastering to get the volume
Convert the volume to quantity using the density of the material
Repeat the process for all block work and plastering areas
Sum up the quantiti
Top trending discussions
I applied via Naukri.com and was interviewed in Aug 2024. There was 1 interview round.
Baseline schedule is the original project schedule used as a reference point for comparison.
Baseline schedule is the initial approved project schedule that serves as a benchmark for measuring project progress.
It includes the planned start and finish dates for project activities, milestones, and deliverables.
Any changes to the schedule must be compared against the baseline schedule to assess impact.
Baseline schedule hel...
Planning Engineer is responsible for creating project schedules, monitoring progress, identifying delays, and coordinating with stakeholders.
Creating project schedules using software like Primavera P6
Monitoring project progress and identifying potential delays
Coordinating with project team members, subcontractors, and clients
Analyzing project data to make informed decisions
Preparing progress reports and presenting to s
Weekly lookahead schedule involves reviewing upcoming tasks, identifying potential issues, and adjusting the schedule accordingly.
Review current progress and upcoming tasks for the week
Identify any potential issues or constraints that may impact the schedule
Adjust the schedule by re-sequencing tasks or allocating additional resources if needed
Communicate any changes to the project team to ensure alignment
I manage procurement schedule by creating a detailed plan, tracking progress, identifying risks, and communicating with stakeholders.
Create a detailed procurement schedule outlining key milestones and deadlines
Track progress regularly to ensure tasks are completed on time
Identify potential risks and develop contingency plans to mitigate them
Communicate effectively with suppliers, team members, and stakeholders to ensur...
I applied via Company Website and was interviewed in Aug 2024. There were 3 interview rounds.
Plaster wall thickness 6mm slab bottom
12mm plaster smooth surface
Cube test after 7 day nd 14 day
Slump cone test true
posted on 12 Nov 2024
posted on 22 Jul 2024
The weight of 12 mm ply as per IS code varies depending on the type of wood used.
The weight of 12 mm ply can range from 22 to 30 kg per sheet.
The weight can also vary based on the density of the wood used.
IS code may specify a range of acceptable weights for 12 mm ply.
The weight of steel varies depending on the type and dimensions of the steel.
The weight of steel is typically measured in pounds or kilograms.
The weight of steel can range from 7.85 g/cm³ for mild steel to 8.05 g/cm³ for high-strength steel.
The weight of a specific piece of steel can be calculated by multiplying its volume by its density.
posted on 12 Apr 2024
Concrete is a composite material made of cement, water, aggregates, and sometimes additives, used in construction for its strength and durability.
Concrete is made by mixing cement, water, and aggregates like sand and gravel.
It hardens over time through a chemical process called hydration.
Concrete is used in construction for building foundations, roads, bridges, and more.
Different types of concrete can be used based on ...
PCC stands for Plain Cement Concrete and is made of cement, sand, and aggregate. RCC stands for Reinforced Cement Concrete and has steel reinforcement added to increase strength.
PCC is used for non-structural works like levelling, bedding for footing, etc.
RCC is used for structural works like beams, columns, slabs, etc.
RCC has higher strength and durability compared to PCC.
PCC does not have any reinforcement, while RCC...
Contours are imaginary lines that connect points of equal elevation on a map or surface.
Contours are used in topographic maps to show the shape and elevation of the land.
They help visualize the terrain and identify features such as hills, valleys, and slopes.
Closer contour lines indicate steeper slopes, while widely spaced lines represent flatter areas.
Contour lines never cross each other and form closed loops around h...
Reinforcement in civil engineering refers to the process of adding steel bars or mesh to concrete structures to increase their strength and durability.
Reinforcement helps to resist tensile forces in concrete structures.
Common types of reinforcement include rebar (steel bars) and wire mesh.
Reinforcement is placed strategically within the concrete forms before pouring the concrete.
Properly placed reinforcement helps prev...
I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
Cost review techniques are used to evaluate and analyze project costs.
Cost-benefit analysis
Earned value management
Variance analysis
Life cycle costing
Activity-based costing
Project Manager
11
salaries
| ₹6 L/yr - ₹12 L/yr |
Sales Manager
11
salaries
| ₹4.2 L/yr - ₹8 L/yr |
Project Engineer
9
salaries
| ₹3.6 L/yr - ₹8 L/yr |
Site Engineer
9
salaries
| ₹1.8 L/yr - ₹3.6 L/yr |
Billing Engineer
7
salaries
| ₹2.4 L/yr - ₹3.8 L/yr |
Prestige Group
Sobha
Brigade Group
Godrej Properties