BBS or Bar Bending Schedule is prepared by calculating the weight of steel required for a particular structure.
Understand the structural drawings and identify the different components
Calculate the total length of each component and the number of bars required
Calculate the weight of steel required for each component
Prepare a detailed list of all the components and their corresponding weight of steel
Use software lik...
The number of blocks in one m3 depends on the size of the blocks.
The size of the blocks can vary depending on the material used.
For example, if the blocks are 20cm x 20cm x 20cm, then there would be 125 blocks in one m3.
However, if the blocks are 10cm x 10cm x 10cm, then there would be 1000 blocks in one m3.
Plastering area calculation involves measuring the surface area to be covered with plaster.
Measure the length and height of the surface to be plastered
Multiply the length and height to get the surface area
Subtract the area of any openings such as doors and windows
Add 10% extra for wastage
The formula for plastering area calculation is: (Length x Height) - (Area of Openings) + 10% Wastage
Block work quantity estimation involves calculating the amount of blocks required for a construction project.
Determine the dimensions of the wall to be constructed
Calculate the area of the wall
Determine the size of the blocks to be used
Calculate the number of blocks required by dividing the area of the wall by the area of each block
Add 10% extra blocks for wastage and breakages
To take block work and plastering quantity from Autocad rqwing, follow these steps:
Open the Autocad rqwing file
Select the block work and plastering area
Use the 'Measure' tool to calculate the area
Multiply the area by the thickness of the block work and plastering to get the volume
Convert the volume to quantity using the density of the material
Repeat the process for all block work and plastering areas
Sum up the qua...
Answers to questions related to QS Engineer job interview
Basic specifications of plastering include thickness, mix ratio, curing time, etc.
Deductions for plastering depend on the type of surface and thickness of plaster
Bar Bending Schedule is a document that lists the reinforcement details of a structure
Cutting length for stirrups of beam depends on the diameter of the stirrup and spacing
Basic documentation for ce...
Plastering deductions as per IS code refer to the deductions made in plastering thickness as per Indian Standards code.
IS code specifies deductions for plastering thickness based on the type of surface and the type of plaster used.
For example, for a smooth surface and cement plaster, the deduction is 6mm for internal walls and 8mm for external walls.
Similarly, for a rough surface and lime plaster, the deduction is...
I appeared for an interview in Oct 2024, where I was asked the following questions.
People change jobs for various reasons such as career advancement, better work-life balance, higher salary, or seeking new challenges.
Career advancement opportunities
Better work-life balance
Higher salary
Seeking new challenges
Relocation
Company culture mismatch
Lack of growth opportunities
Burnout or stress
Desire for a career change
I applied via Company Website and was interviewed in Aug 2022. There were 2 interview rounds.
Plastering area calculation involves measuring the surface area to be covered with plaster.
Measure the length and height of the surface to be plastered
Multiply the length and height to get the surface area
Subtract the area of any openings such as doors and windows
Add 10% extra for wastage
The formula for plastering area calculation is: (Length x Height) - (Area of Openings) + 10% Wastage
Block work quantity estimation involves calculating the amount of blocks required for a construction project.
Determine the dimensions of the wall to be constructed
Calculate the area of the wall
Determine the size of the blocks to be used
Calculate the number of blocks required by dividing the area of the wall by the area of each block
Add 10% extra blocks for wastage and breakages
The number of blocks in one m3 depends on the size of the blocks.
The size of the blocks can vary depending on the material used.
For example, if the blocks are 20cm x 20cm x 20cm, then there would be 125 blocks in one m3.
However, if the blocks are 10cm x 10cm x 10cm, then there would be 1000 blocks in one m3.
BBS or Bar Bending Schedule is prepared by calculating the weight of steel required for a particular structure.
Understand the structural drawings and identify the different components
Calculate the total length of each component and the number of bars required
Calculate the weight of steel required for each component
Prepare a detailed list of all the components and their corresponding weight of steel
Use software like Aut...
Plastering deductions as per IS code refer to the deductions made in plastering thickness as per Indian Standards code.
IS code specifies deductions for plastering thickness based on the type of surface and the type of plaster used.
For example, for a smooth surface and cement plaster, the deduction is 6mm for internal walls and 8mm for external walls.
Similarly, for a rough surface and lime plaster, the deduction is 12mm...
I applied via Naukri.com and was interviewed in Mar 2022. There was 1 interview round.
Answers to questions related to QS Engineer job interview
Basic specifications of plastering include thickness, mix ratio, curing time, etc.
Deductions for plastering depend on the type of surface and thickness of plaster
Bar Bending Schedule is a document that lists the reinforcement details of a structure
Cutting length for stirrups of beam depends on the diameter of the stirrup and spacing
Basic documentation for certifi...
To take block work and plastering quantity from Autocad rqwing, follow these steps:
Open the Autocad rqwing file
Select the block work and plastering area
Use the 'Measure' tool to calculate the area
Multiply the area by the thickness of the block work and plastering to get the volume
Convert the volume to quantity using the density of the material
Repeat the process for all block work and plastering areas
Sum up the quantiti...
Top trending discussions
I applied via Referral and was interviewed before Apr 2021. There were 2 interview rounds.
I applied via Referral and was interviewed in Apr 2021. There was 1 interview round.
Absolutely! I am enthusiastic about sales and ready to leverage my skills to drive results and build strong client relationships.
I have a proven track record in sales, having exceeded my targets by 20% in my previous role.
I possess strong communication skills, which help me connect with clients and understand their needs.
I am adaptable and can quickly learn about new products, as demonstrated when I successfully sold a...
I applied via Naukri.com and was interviewed before Jun 2022. There were 3 interview rounds.
I applied via Referral and was interviewed in Feb 2021. There were 4 interview rounds.
I applied via Company Website and was interviewed in May 2021. There was 1 interview round.
In my previous role, I led engineering projects, optimized processes, and collaborated with cross-functional teams to deliver innovative solutions.
Led a team of engineers to develop a new software application that improved user experience by 30%.
Implemented Agile methodologies, resulting in a 25% increase in project delivery speed.
Collaborated with product management to define project scope and requirements, ensuring a...
based on 2 interview experiences
Difficulty level
Duration
based on 66 reviews
Rating in categories
Project Manager
12
salaries
| ₹6 L/yr - ₹12 L/yr |
Sales Manager
11
salaries
| ₹6 L/yr - ₹8 L/yr |
Site Engineer
10
salaries
| ₹1.8 L/yr - ₹3.6 L/yr |
Project Engineer
8
salaries
| ₹5.2 L/yr - ₹8 L/yr |
Senior Engineer
7
salaries
| ₹5.3 L/yr - ₹9 L/yr |
Knight Frank
Investors Clinic
M3M India
Surya Roshni