I applied via Walk-in and was interviewed in Sep 2024. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Aug 2024. There were 2 interview rounds.
Some general questions
Initiating substructure to finishing work involves proper planning, coordination, and communication.
Develop a detailed project plan outlining the sequence of activities from substructure to finishing work
Coordinate with subcontractors and suppliers to ensure timely delivery of materials and equipment
Communicate effectively with the project team to ensure everyone is clear on their roles and responsibilities
Regularly mo...
I handle my activities by prioritizing tasks, setting goals, creating schedules, delegating when necessary, and staying organized.
Prioritize tasks based on deadlines and importance
Set specific goals for each activity to stay focused
Create a schedule or to-do list to track progress
Delegate tasks to team members when needed to improve efficiency
Stay organized by keeping track of documents, emails, and meetings
My previous company was a construction firm specializing in commercial building projects.
Managed project timelines and budgets
Coordinated with architects, engineers, and subcontractors
Ensured compliance with building codes and regulations
Implemented quality control measures
Completed projects on time and within budget
Waterproofing is the process of making a structure or object resistant to water penetration.
Waterproofing can be done using various materials such as membranes, coatings, and sealants.
Proper surface preparation is essential before applying waterproofing materials.
Regular maintenance and inspections are necessary to ensure the effectiveness of waterproofing.
Examples of waterproofing methods include using waterproof memb...
BBS stands for Behavior-Based Safety, a systematic approach to preventing workplace accidents by focusing on behaviors that can lead to incidents.
Conduct a thorough analysis of the workplace to identify potential hazards and at-risk behaviors
Develop safety procedures and protocols based on the identified hazards
Train employees on the importance of following safety protocols and encourage reporting of unsafe behaviors
Im...
I applied via Walk-in and was interviewed in Aug 2024. There were 2 interview rounds.
General knowledge skills
Worked as a Project Engineer at a construction company for 5 years.
Managed multiple civil engineering projects simultaneously
Coordinated with architects, contractors, and clients to ensure project success
Performed site inspections and quality control checks
Prepared project schedules and budgets
Resolved any issues or conflicts that arose during construction
Sobha interview questions for popular designations
I applied via Walk-in and was interviewed in Aug 2024. There were 2 interview rounds.
General knowledge question
Get interview-ready with Top Sobha Interview Questions
I applied via Walk-in and was interviewed in May 2024. There were 3 interview rounds.
The number of concrete blocks required for 100sft depends on the size of the blocks and the thickness of the wall being built.
The number of concrete blocks needed can be calculated by dividing the total area (100sft) by the area of one block.
The size of the concrete block and the thickness of the wall will determine the number of blocks needed.
For example, if each concrete block is 1ft x 1ft and the wall is 4 inches th
Concrete density is the mass per unit volume of concrete.
Concrete density is typically measured in kilograms per cubic meter (kg/m^3).
The density of normal concrete is around 2400 kg/m^3.
Higher density concrete, such as heavyweight concrete, can have densities up to 4000 kg/m^3.
Lightweight concrete, on the other hand, can have densities as low as 1600 kg/m^3.
The thickness for outer and inner walls plastering typically ranges from 12mm to 20mm.
The thickness of plastering for outer walls is usually around 15mm to 20mm.
The thickness of plastering for inner walls is typically around 12mm to 15mm.
The thickness may vary based on the type of wall surface and the desired finish.
It is important to ensure proper curing and finishing for a durable and aesthetically pleasing result.
Various types of formwork have been used in my recently worked companies, including timber formwork, steel formwork, and aluminum formwork.
Timber formwork is commonly used for small to medium-sized projects due to its cost-effectiveness and flexibility.
Steel formwork is preferred for large and complex structures due to its durability and reusability.
Aluminum formwork is lightweight and easy to handle, making it suitabl
The mix proportion of plastering mortar typically consists of 1 part cement to 3-4 parts sand.
The mix proportion of plastering mortar is usually 1:3 or 1:4 (cement:sand)
The mix can also include lime to improve workability and durability
Water is added to achieve the desired consistency for application
Example: A common mix proportion for plastering mortar is 1 part cement, 3 parts sand, and water as needed
The materials required in 1m3 of plastering mortar include cement, sand, and water.
Cement is typically used in the ratio of 1:4 for plastering mortar.
Sand is used in the ratio of 3-4 times the amount of cement used.
Water is added as needed to achieve the desired consistency.
For example, for 1m3 of plastering mortar, you may need 0.25m3 of cement, 1m3 of sand, and water as needed.
Test was based on numerical, reasoning and verbal,Geometry,Profit & loss, Algebra, Simplication, trigonometry,Load calculation,etc
Yes, I am willing to work for 1-3 years at Sobha Ltd to contribute to the growth of the company and gain knowledge in the technical world of Civil engineering.
I am committed to continuous learning and professional development in the field of Civil engineering.
I understand the importance of gaining practical experience and knowledge to contribute effectively to the growth of the company.
I am excited about the opportunit...
I applied via Walk-in and was interviewed in Nov 2024. There were 2 interview rounds.
I got selected in this round
Power factor is a measure of how effectively electrical power is being used in a circuit.
Power factor is the ratio of real power (kW) to apparent power (kVA) in a circuit.
It indicates how efficiently electrical power is being converted into useful work.
A power factor of 1 (or 100%) means all the power is being used effectively, while a power factor of 0 means none of the power is being used efficiently.
Power factor can...
A megger is used to measure the insulation resistance of electrical wires and equipment.
Used to detect insulation faults in wires and cables
Helps prevent electrical breakdowns and accidents
Can identify deteriorating insulation before it causes damage
Commonly used in electrical maintenance and testing
Example: A megger can be used to test the insulation resistance of a motor winding
I applied via Walk-in and was interviewed in Oct 2024. There were 2 interview rounds.
Yes, I am ready to work at night as required for the job.
I am willing to work night shifts to meet project deadlines
I understand the importance of flexibility in the engineering field
I have previous experience working night shifts on construction projects
I applied via Walk-in and was interviewed in Jul 2024. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Sep 2024. There were 3 interview rounds.
Model a villa in revit with accurate details.
I have worked on various projects including residential buildings, commercial spaces, and public facilities.
Designed a sustainable residential building focusing on energy efficiency
Renovated a historic commercial space while preserving its original features
Collaborated on the design of a community center with accessibility features for all users
Top trending discussions
The duration of Sobha interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 159 interviews
Interview experience
based on 1.8k reviews
Rating in categories
Senior Engineer
510
salaries
| ₹2.5 L/yr - ₹6.5 L/yr |
Project Engineer
472
salaries
| ₹3.2 L/yr - ₹8 L/yr |
Assistant Manager
337
salaries
| ₹4 L/yr - ₹10.5 L/yr |
Civil Site Engineer
201
salaries
| ₹2.2 L/yr - ₹4.5 L/yr |
Deputy Manager
191
salaries
| ₹5 L/yr - ₹11 L/yr |
DLF
Godrej Properties
Prestige Group
Brigade Group