I applied via Walk-in and was interviewed in Apr 2024. There were 3 interview rounds.
Conduct the offline test
Density of common construction materials
Steel: 7850 kg/m^3
Cement: 1440 kg/m^3
Concrete: 2400 kg/m^3
Sand: 1600-1700 kg/m^3
Aggregates: 1500-1750 kg/m^3
Triangle concrete quantity can be found using the formula: 1/2 * base * height * thickness.
Calculate the area of the triangle using the formula: 1/2 * base * height.
Multiply the area by the thickness to get the concrete quantity.
For example, if the base of the triangle is 5 meters, height is 8 meters, and thickness is 0.2 meters, the concrete quantity would be: 1/2 * 5 * 8 * 0.2 = 4 cubic meters.
Circular column concrete quantity can be found using the formula: Volume = πr^2h
Calculate the area of the circular column using the formula A = πr^2
Measure the height of the column
Multiply the area by the height to get the volume of concrete needed
Consider any additional factors such as wastage or reinforcement bars
Slump test is a method to measure the consistency of concrete before it sets.
Slump test is used to determine the workability of fresh concrete.
It involves filling a cone-shaped mold with concrete, then lifting the mold to see how much the concrete slumps or settles.
The amount of slump indicates the consistency of the concrete - a higher slump means a more workable mix.
Slump test helps in ensuring that the concrete mix ...
Compressive strength of concrete is typically measured after 14 and 28 days to assess its strength development.
Compressive strength of concrete is usually measured in pounds per square inch (psi) or megapascals (MPa).
After 14 days, the average compressive strength of concrete is around 60-75% of its ultimate strength.
After 28 days, the concrete typically reaches about 90-95% of its ultimate strength.
The percentage of s...
Mix ratios of concrete refer to the proportions of cement, sand, and aggregate used in a concrete mix.
Mix ratios are typically expressed as a ratio of cement:sand:aggregate, such as 1:2:4.
The mix ratio will vary depending on the strength and durability requirements of the concrete.
Common mix ratios include 1:2:3 for low strength concrete and 1:1.5:3 for high strength concrete.
Water is also added to the mix to achieve t
I applied via Company Website and was interviewed in Sep 2023. There were 3 interview rounds.
Column lap length is the length of overlap between two reinforcing bars in a column.
Column lap length is important for ensuring proper structural integrity in a column.
It is typically specified in construction drawings or codes.
The lap length is determined based on the diameter of the reinforcing bars and the structural requirements.
For example, a column may require a lap length of 40 times the diameter of the bar.
2D and 4D refer to dimensions in geometry and physics.
2D refers to two-dimensional space, like a flat surface with length and width.
4D refers to four-dimensional space, which includes the three dimensions of space (length, width, height) and the dimension of time.
Examples of 2D objects include a square or a circle, while examples of 4D concepts include spacetime in physics.
Average problems, time, train, ven daiharms, simple intrest
Top trending discussions
Seeking new challenges and opportunities for growth in a dynamic work environment.
Desire for professional development and advancement
Looking for new challenges and learning opportunities
Seeking a more dynamic work environment
Interested in applying skills and knowledge to different projects
Negotiable based on industry standards and job responsibilities.
Salary expectations are based on industry standards and the responsibilities of the role.
Consider factors such as location, company size, and years of experience when determining salary expectations.
Research average salaries for Site Engineers in the specific industry and location to have a realistic expectation.
Be prepared to discuss salary expectations d...
posted on 10 Jul 2024
I applied via Referral and was interviewed in Jun 2024. There was 1 interview round.
I applied via Campus Placement and was interviewed in Sep 2022. There were 3 interview rounds.
I am a Site Engineer with expertise in cement density, brick size, and concrete grade.
I have extensive knowledge of different types of cement and their densities.
I am familiar with various brick sizes and their applications in construction.
I have experience working with different concrete grades for different structural requirements.
I can provide recommendations on the appropriate cement density, brick size, and concre
I am a dedicated and experienced Site Engineer with a strong background in construction and project management.
Bachelor's degree in Civil Engineering
5 years of experience in managing construction projects
Proficient in using construction software and tools
Strong problem-solving and decision-making skills
Excellent communication and leadership abilities
Completed successful projects such as building a commercial complex an
My family background is diverse and has influenced my values and work ethic.
My parents are both engineers, which inspired me to pursue a career in engineering.
I come from a close-knit family that values education and hard work.
My grandparents were farmers, teaching me the importance of perseverance and adaptability.
I have a sibling who is a doctor, which has given me insights into the medical field.
My family has always...
I applied via Company Website and was interviewed in Jan 2022. There were 3 interview rounds.
posted on 9 Oct 2021
I applied via Referral and was interviewed in Sep 2021. There were 4 interview rounds.
High rise buildings require careful planning, design, and construction techniques.
Site selection and analysis
Structural design and analysis
Foundation design and construction
Use of high-strength materials
Installation of elevators and other building systems
Safety measures for workers and occupants
Quality control and testing
Regular maintenance and inspections
I applied via Approached by Company and was interviewed before Feb 2022. There were 4 interview rounds.
To calculate the concrete value of a trapezoidal foundation, you need to determine the volume of concrete required.
Calculate the area of the trapezoidal foundation by using the formula: (a + b) * h / 2, where a and b are the lengths of the parallel sides and h is the height.
Multiply the area by the desired thickness of the foundation to get the volume of concrete required.
Consider any additional factors such as wastage...
As a site engineer, my role and responsibilities on my previous site included overseeing construction activities, managing subcontractors, ensuring compliance with safety regulations, and resolving technical issues.
Overseeing construction activities and ensuring they are carried out according to plans and specifications
Managing subcontractors and coordinating their work schedules
Ensuring compliance with safety regulati...
I would expect a salary that is competitive and reflective of my skills and experience as a Site Engineer.
I believe my salary expectation should align with industry standards for Site Engineers.
Considering my qualifications and expertise, I would expect a fair and reasonable compensation package.
I am open to discussing salary based on the specific responsibilities and scope of the role.
I value opportunities for growth ...
I applied via Referral and was interviewed in Oct 2023. There was 1 interview round.
Project planning management estimate and costing
I applied via Walk-in and was interviewed before Feb 2022. There were 2 interview rounds.
One way slab is supported on two opposite sides while two way slab is supported on all four sides.
One way slab is designed to carry the load in one direction only
Two way slab is designed to carry the load in both directions
One way slab is economical for small spans and light loads
Two way slab is suitable for larger spans and heavy loads
One way slab requires less reinforcement compared to two way slab
If the ratio of length and width of slab is 2 or more, then it's a two-way slab.
A two-way slab is supported by beams on all four sides.
The ratio of length and width determines the direction of the main reinforcement.
A one-way slab is supported by beams on two opposite sides only.
Interview experience
based on 14 reviews
Rating in categories
Project Engineer
473
salaries
| ₹3.2 L/yr - ₹8 L/yr |
Senior Engineer
469
salaries
| ₹2.5 L/yr - ₹6.2 L/yr |
Assistant Manager
320
salaries
| ₹3.2 L/yr - ₹10.5 L/yr |
Deputy Manager
192
salaries
| ₹5 L/yr - ₹11 L/yr |
Civil Site Engineer
190
salaries
| ₹2.2 L/yr - ₹4.5 L/yr |
DLF
Godrej Properties
Prestige Group
Brigade Group