Site Supervisor
200+ Site Supervisor Interview Questions and Answers

Asked in Lodha Group

Q. What is the handover process to civil or facilities teams?
Handover process involves transferring responsibility and ownership of a project or facility from one party to another.
Ensure all necessary documentation is complete and accurate
Conduct a thorough inspection of the project or facility
Provide training and orientation to the new party
Establish clear communication channels for ongoing support
Obtain sign-off and acknowledgement of the handover
Examples: handover of a construction project from the contractor to the owner, handover ...read more
Asked in Safal Enterprises

Q. What is coping and why it is provide,what is lap length and joggle why provided and right place of placing.what working drawings and submission drawing.what different between 250,450, and 500 reinforcement bar....
read moreCoping is a protective layer on top of a wall, lap length and joggle are reinforcement techniques, working drawings show construction details, 250, 450, and 500 reinforcement bars differ in diameter, initial setting time is the time it takes for cement to harden, DPC and PPC are measurement units, sand filling is used for compacting soil, and shuttering is a temporary formwork.
Coping is a protective layer placed on top of a wall to prevent water penetration and provide a fini...read more
Site Supervisor Interview Questions and Answers for Freshers
Asked in South West Mining

Q. What is your knowledge of basic computer skills?
Basic computers perform essential tasks like data processing, word processing, and internet browsing for various applications.
Word Processing: Creating and editing documents using software like Microsoft Word.
Spreadsheet Management: Using Excel for data analysis and calculations.
Internet Browsing: Accessing information and resources online through web browsers.
Email Communication: Sending and receiving messages via platforms like Outlook or Gmail.
File Management: Organizing a...read more
Asked in Pinaly Power

Q. Do you have a medical certificate and a Competency certificate?
Yes, I have both medical and competency certificates.
I have a valid medical certificate and competency certificate.
I can provide copies of both certificates upon request.
I have kept both certificates up to date and renewed them as necessary.

Asked in Arabtec Construction

Q. How would you fix the joint between RCC walls and block walls?
In order to fix the joints of RCC walls and block walls, various methods can be used such as grouting, sealing, and reinforcement.
Grouting is the process of filling the joints with a cementitious material to provide strength and stability.
Sealing the joints with appropriate sealants helps in preventing water leakage and enhancing the durability of the walls.
Reinforcing the joints with steel bars or mesh can improve the structural integrity of the walls.
Proper alignment and le...read more

Asked in Arabtec Construction

Q. What preparations are necessary before starting block work?
Before starting block work, preparation involves site survey, layout marking, excavation, and foundation preparation.
Conduct a site survey to assess the ground conditions and identify any potential obstacles or hazards.
Mark the layout of the block work using strings, stakes, and levels to ensure accurate positioning.
Excavate the area where the block work will be installed, removing any existing debris or vegetation.
Prepare the foundation by compacting the soil, adding a layer...read more
Site Supervisor Jobs




Asked in Arabtec Construction

Q. What is the weight of a 25mm diameter steel bar that is 4 meters long?
The weight of a 25mm diameter steel bar of 4 meters length.
To calculate the weight, we need to know the density of the steel.
The density of steel is typically around 7850 kg/m^3.
Using the formula weight = volume * density, we can calculate the weight of the steel bar.
The volume of a cylindrical bar can be calculated using the formula volume = π * (diameter/2)^2 * length.
Substituting the values, we can calculate the weight of the steel bar.

Asked in Arabtec Construction

Q. How much plaster can be done by one mason and one laborer?
The amount of plaster that can be done by 1 mason and 1 labor depends on various factors.
The skill and experience of the mason and labor
The size and complexity of the area to be plastered
The type of plaster being used
The tools and equipment available
The time allocated for the task
The working conditions and environment
The efficiency and coordination between the mason and labor
On average, a skilled mason and labor can plaster around 20-30 square meters per day
Share interview questions and help millions of jobseekers 🌟

Asked in Godrej & Boyce Manufacturing

Q. Do you have any knowledge of computers?
Yes, I have knowledge of computers.
Proficient in using various computer software and applications.
Familiar with troubleshooting common computer issues.
Experience in managing computer networks and systems.
Knowledge of programming languages and coding.
Ability to work with hardware components and peripherals.

Asked in Arabtec Construction

Q. How will you verify the right angle of wall corners?
To check the right angle of walls corner, use a carpenter's square or a digital angle finder.
Use a carpenter's square by placing it against the corner of the wall and checking if the edges align perfectly.
Alternatively, use a digital angle finder to measure the angle between the two walls and ensure it is 90 degrees.
Ensure the walls are straight and plumb before checking the corner angle.

Asked in Lodha Group

Q. Types of sprinklers name with temperature and color code
Sprinklers are classified based on temperature and color code. Each type is designed for specific fire hazards.
Blue: 57°C (135°F) - Ordinary Combustibles
Orange: 68°C (155°F) - Flammable Liquids
Red: 79°C (175°F) - Electrical Equipment
Green: 93°C (200°F) - Storage
Yellow: 141°C (286°F) - Extra High Temperature
Purple: 182°C (360°F) - Extreme High Temperature
Asked in MTC Business

Q. If someone is selected for a job at MTC Business Pvt Ltd, what is the onboarding process?
To join MTC Business Pvt Ltd, selected candidates need to follow a few steps.
Selected candidates will receive an offer letter from the company.
They need to accept the offer and complete the joining formalities.
This may include submitting necessary documents, filling out forms, and undergoing a background check.
Once the formalities are completed, the candidate will be given a joining date.
On the joining date, the candidate will report to their assigned supervisor and begin the...read more
Asked in Feastbell Hospitality Services

Q. What is your skills about site supervising,do you know about calculations on muster rolls and sales in food report..
I have extensive experience in site supervising and am proficient in calculations on muster rolls and sales in food reports.
I have supervised multiple construction sites and ensured timely completion of projects.
I am well-versed in calculating and maintaining muster rolls for workers on site.
I have experience in managing food sales and maintaining reports for the same.
I am proficient in using software tools for site management and reporting.
I have excellent communication and ...read more
Asked in Pinaly Power

Q. How many years of experience do you have in the electrical field?
I have 8 years of experience in the electrical field.
I have worked as an electrician for 5 years before becoming a site supervisor.
I have experience in installing and maintaining electrical systems.
I have knowledge of electrical codes and regulations.
I have trained and supervised electricians on various projects.
I have experience in troubleshooting electrical issues and finding solutions.
Asked in Siddhi Group

Q. How can this work be done remotely?
Working from home requires a reliable internet connection, proper equipment, and effective communication with team members.
Ensure a stable internet connection to avoid interruptions during work hours
Have the necessary equipment such as a computer, phone, and other tools required for the job
Stay in constant communication with team members through video conferencing, messaging apps, and email
Create a designated workspace that is free from distractions and conducive to productiv...read more
Asked in Nanoprecise

Q. How many years have working experience. Do you know the alinement of machine and how you do the alinement. Do you know condition monitoring of equipment
I have X years of experience. I am familiar with machine alignment and condition monitoring of equipment.
I have X years of experience in the field.
I am familiar with the process of machine alignment and have done it before.
I have experience with condition monitoring of equipment and know how to identify potential issues.
I keep up to date with industry standards and best practices.
I am always willing to learn and improve my skills.

Asked in Likhitha Infrastructure

Q. 01 02What is difference between welding and fusion Full form of HDPE Pipe What is full form of PNG
Welding involves melting and joining two metal pieces, while fusion involves melting and joining two plastic pieces.
Welding is used for joining metals, while fusion is used for joining plastics.
Welding involves the use of heat and pressure to join two metal pieces, while fusion involves the use of heat to melt and join two plastic pieces.
Examples of welding include arc welding, gas welding, and resistance welding, while examples of fusion include hot plate welding, butt fusio...read more

Asked in Landmark Group

Q. How do you calculate the total amount of plaster required for this corridor of that building?
The total amount of plaster required for a corridor can be calculated by measuring the length, width, and height of the corridor and multiplying them together.
Measure the length, width, and height of the corridor in meters
Multiply the length, width, and height together to get the volume of the corridor
Determine the coverage area of plaster per square meter
Multiply the volume of the corridor by the coverage area to get the total amount of plaster required

Asked in Larsen & Toubro Limited

Q. What does a site supervisor do?
A site supervisor is responsible for overseeing construction sites and ensuring that work is completed safely, on time, and within budget.
Supervising and coordinating construction workers and subcontractors
Ensuring compliance with safety regulations and building codes
Managing project timelines and budgets
Communicating with clients, architects, and engineers
Inspecting work to ensure quality and accuracy
Resolving any issues or conflicts that arise on the job site
Asked in Decon Equipments and Systems

Q. What are the needs, importance, and benefits of the systems we are installing?
The systems being installed are crucial for efficient operations, safety compliance, and data management.
Ensures smooth and efficient operations on site
Helps in maintaining safety compliance and reducing risks
Facilitates better data management and tracking of progress
Improves communication and coordination among team members
Enhances productivity and quality of work
Examples: Construction project management software, safety monitoring systems, data tracking tools

Asked in Lodha Group

Q. Types of water supply pipes name with make name
There are several types of water supply pipes available in the market. Some of the popular ones are copper, PVC, PEX, and galvanized steel.
Copper pipes are durable and resistant to corrosion. They are commonly used in residential and commercial buildings.
PVC pipes are lightweight and easy to install. They are commonly used in irrigation systems and swimming pools.
PEX pipes are flexible and easy to install. They are commonly used in residential plumbing systems.
Galvanized stee...read more
Asked in Stark Interio

Q. Are you familiar with the materials used in this field, and do you know how to use them properly?
Yes, I am familiar with the materials used in the field and their proper application.
I am knowledgeable about common construction materials such as concrete, steel, wood, and glass.
I understand how these materials are used in various construction projects, including their strengths and limitations.
I am aware of proper construction techniques and safety protocols when working with different materials.
For example, I know how to properly mix and pour concrete for a foundation or...read more
Asked in Stark Interio

Q. What needs to be ensured first before starting any work on the site?
Ensure safety measures are in place before starting work on the site.
Check for any potential hazards on the site
Ensure all necessary safety equipment is available and in good condition
Verify that all workers have received proper training on safety procedures
Obtain necessary permits and approvals before commencing work
Establish emergency response protocols in case of accidents or incidents

Asked in Lodha Group

Q. How do you approach system testing and commissioning?
System testing and commissioning involves verifying and validating the functionality of a system before it is put into operation.
Develop a test plan that outlines the testing process and criteria
Execute the test plan to ensure that the system meets the requirements
Document any issues or defects found during testing
Fix any issues or defects and retest
Once testing is complete, commission the system by putting it into operation
Verify that the system is functioning as expected
Pro...read more
Asked in Ishan Infrapromoters

Q. How to calculate no of bricks? How to calculate volume of wall? Why using cover blok in colmn? Thats type of question are asking or etc.
Answering questions related to brick calculation, wall volume calculation, and use of cover block in column.
To calculate the number of bricks, we need to know the size of the brick and the size of the wall. Then we can use the formula: Number of bricks = (Area of wall / Area of brick) x 1.05 (to account for wastage)
To calculate the volume of the wall, we need to know the length, height, and thickness of the wall. Then we can use the formula: Volume of wall = Length x Height x...read more

Asked in L&T Construction

Q. What are the main responsibilities of a civil engineer on site?
Civil engineers on site oversee construction, ensuring safety, quality, and compliance with regulations while managing resources effectively.
Project Management: Coordinate daily operations and manage timelines, e.g., scheduling subcontractors.
Quality Control: Inspect materials and workmanship to ensure they meet specifications, e.g., testing concrete strength.
Safety Compliance: Implement safety protocols to protect workers, e.g., conducting regular safety meetings.
Budget Mana...read more
Asked in Benfracorp

Q. What are the basic layers required in the foundation structure for a building?
A building's foundation consists of essential layers that ensure stability, load distribution, and moisture protection.
Excavation: The first step involves digging to the required depth to create a stable base for the foundation.
Subgrade: This is the natural soil layer that supports the foundation. It must be compacted and leveled to provide a solid base.
Footings: Concrete footings are poured to distribute the building's load over a larger area, preventing settling. For exampl...read more

Asked in Arabtec Construction

Q. What checks need to be performed after plastering?
Before applying plaster, check surface preparation, moisture levels, and material compatibility for optimal adhesion and finish.
Surface Preparation: Ensure the surface is clean, free of dust, and properly roughened for better adhesion.
Moisture Levels: Check for moisture content in the substrate; excessive moisture can lead to plaster failure.
Material Compatibility: Verify that the plaster type is suitable for the substrate (e.g., gypsum plaster on drywall).
Temperature and Hum...read more

Asked in Space Application Centre

Q. What is the standard and nominal size of bricks in India?
In India, the standard size of bricks is 190 mm x 90 mm x 90 mm, while nominal size includes mortar thickness.
Standard size: 190 mm x 90 mm x 90 mm (length x width x height).
Nominal size: 200 mm x 100 mm x 100 mm, accounting for mortar.
Bricks may vary slightly based on local manufacturing standards.
Common types include clay bricks, fly ash bricks, and concrete bricks.

Asked in NTPC

Q. What is the difference between mounting and accessories?
Mounting refers to the process of attaching or fixing something in a specific position, while accessories are additional items that enhance or complement the main object or system.
Mounting involves securing or affixing an object to a surface or structure.
Accessories are optional components that provide added functionality or aesthetic appeal.
Mounting is typically a permanent or semi-permanent attachment, while accessories can be easily added or removed.
Examples of mounting in...read more