Filter interviews by
Seeking new challenges and opportunities for growth.
Desire for new challenges and opportunities for growth
Looking for a company with better work-life balance
Relocation to a different city or country
Company downsizing or restructuring
Yes, I am able to work during night and willing to relocate for the right opportunity.
I have no issues working during night shifts as I am used to it from previous experiences.
I am open to relocating for a job that aligns with my career goals and offers growth opportunities.
I understand the importance of flexibility in the engineering field and am willing to adapt to different work schedules and locations.
Managed a team of engineers to design and implement new products, oversaw project timelines and budgets.
Led a team of engineers in developing new products
Managed project timelines and budgets
Collaborated with cross-functional teams to ensure project success
Voltage is the electric potential difference between two points in an electrical circuit.
Voltage is a measure of the force that pushes electric charge through a circuit.
It is measured in volts (V) and represents the potential energy per unit charge.
Voltage can be thought of as the pressure or intensity of the electric field.
Higher voltage means more potential energy and greater ability to do work.
For example, a battery...
General and logical aptitude test, logical reasoning test
Planning and scheduling process and labour productivity rates are crucial for efficient construction activities.
Planning and scheduling process involves identifying the scope of work, breaking it down into tasks, and assigning resources and timelines.
Labour productivity rates can be calculated by dividing the output by the input. This helps in estimating the time and cost required for each activity.
Factors affecting la...
I am a dedicated engineer with a passion for problem-solving and innovation.
I have a degree in mechanical engineering and have worked in the field for 5 years.
I am skilled in CAD software and have experience in designing and prototyping products.
I am a team player and have collaborated with cross-functional teams to deliver successful projects.
I am always eager to learn and stay up-to-date with the latest industry tren...
I applied via Walk-in and was interviewed in Mar 2022. There were 2 interview rounds.
There is a some basic question 0f 20 number and each question having 1 marks
I applied via Company Website and was interviewed before Jul 2022. There were 4 interview rounds.
Paragraph test
MCQ
50% technical questions
Top trending discussions
posted on 12 Jun 2021
I applied via Walk-in and was interviewed before Jun 2020. There was 1 interview round.
The sampling frequency for private density test per square meter depends on the type of test being conducted.
The sampling frequency for a private density test per square meter varies depending on the type of test being conducted.
For example, a soil density test may require a sampling frequency of one sample per 100 square meters, while a concrete density test may require a sampling frequency of one sample per 10 square...
I applied via Naukri.com and was interviewed before Jul 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed before Jun 2022. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Mar 2023. There was 1 interview round.
The structure work at the site involves the construction of a new building using steel beams and concrete columns.
Steel beams are being used for the framework of the building
Concrete columns are being installed to support the structure
The construction process includes pouring concrete, welding steel beams, and erecting walls
Managing site works involves overseeing construction activities, coordinating with contractors, ensuring safety regulations are followed, and meeting project deadlines.
Coordinate with contractors and subcontractors to ensure work is completed on time and within budget
Monitor progress of construction activities and address any issues that may arise
Ensure compliance with safety regulations and quality standards
Communicat...
based on 6 interview experiences
Difficulty level
Duration
based on 60 reviews
Rating in categories
Senior Engineer
516
salaries
| ₹2.8 L/yr - ₹6.5 L/yr |
Project Engineer
448
salaries
| ₹3.2 L/yr - ₹7.4 L/yr |
Assistant Manager
342
salaries
| ₹4.8 L/yr - ₹10 L/yr |
Deputy Manager
239
salaries
| ₹5.8 L/yr - ₹12 L/yr |
Senior Executive
220
salaries
| ₹2.5 L/yr - ₹7 L/yr |
Godrej Properties
DLF
Surya Roshni
Emaar India Limited