Top Sobha Planning Engineer Interview Questions and Answers

View all 6 questions

Sobha Planning Engineer Interview Experiences

5 interviews found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Oct 2023. There were 2 interview rounds.

Round 1 - Technical 

(5 Questions)

  • Q1. Role of planning engineer
  • Ans. 

    Planning engineers are responsible for creating project schedules, monitoring progress, and ensuring timely completion.

    • Develop project schedules using software like Primavera P6

    • Monitor project progress and identify potential delays

    • Coordinate with various teams to ensure timely completion

    • Prepare reports on project status and communicate with stakeholders

    • Implement changes to the schedule as needed to keep the project on

  • Answered by AI
  • Q2. What is critical path
  • Ans. 

    Critical path is the longest sequence of tasks in a project that must be completed on time to ensure the project finishes on schedule.

    • Critical path helps in identifying the tasks that are crucial for the project timeline.

    • It determines the shortest possible duration for completing the project.

    • Any delay in tasks on the critical path will directly impact the project's overall timeline.

    • Activities on the critical path have ...

  • Answered by AI
  • Q3. Density of steel
  • Ans. 

    Density of steel is approximately 7.85 g/cm^3.

    • The density of steel is commonly expressed in grams per cubic centimeter (g/cm^3).

    • The density of steel is approximately 7.85 g/cm^3.

    • Different types of steel may have slightly different densities.

  • Answered by AI
  • Q4. How to calculate weight of steel
  • Ans. 

    Weight of steel can be calculated by multiplying the volume of steel by its density.

    • Calculate the volume of steel (length x width x height)

    • Determine the density of the specific type of steel being used

    • Multiply the volume by the density to get the weight

    • Example: Weight of a steel plate with dimensions 2m x 1m x 0.1m and density of 7850 kg/m^3 would be 2 x 1 x 0.1 x 7850 = 1570 kg

  • Answered by AI
  • Q5. How to calculate number of tiles
  • Ans. 

    Number of tiles can be calculated by determining the area to be covered and the size of each tile.

    • Calculate the total area to be covered by multiplying the length and width of the space.

    • Determine the size of each tile in square units.

    • Divide the total area by the size of each tile to get the number of tiles needed.

    • Consider adding extra tiles for cuts and wastage.

    • For example, if a room is 10 feet by 12 feet and each tile

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. About excel shortcuts
  • Q2. Drawing related questions
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Is code for method of measurement
  • Ans. 

    Code for method of measurement is a standardized set of rules and guidelines used to quantify and evaluate the work done in a construction project.

    • Codes for method of measurement provide a uniform and consistent way to measure quantities in construction projects.

    • They help in accurately estimating costs, monitoring progress, and resolving disputes.

    • Examples include CESMM (Civil Engineering Standard Method of Measurement)...

  • Answered by AI

Planning Engineer Interview Questions Asked at Other Companies

Q1. Prepare a small given example site schedule with sequencing and d ... read more
Q2. What is CPI & SPI how to do that how to load resources into t ... read more
Q3. What software using for planning? How much proficiency you have o ... read more
Q4. what is clim digger function? How much total float is allowed in ... read more
asked in KPMG India
Q5. Productivity of workers and how to calculate task duration from t ... read more

I applied via Walk-in and was interviewed in Sep 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Aptitude questions easy not much difficult but have to write

Round 3 - Technical 

(1 Question)

  • Q1. Basics and based on your experience they will ask
Round 4 - HR 

(1 Question)

  • Q1. Salary negotiation and commitments towards the company

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview will be not much difficult as per me but a bit preperation is required for freshers

Interview Questionnaire 

1 Question

  • Q1. Job profile
  • Ans. Material planning ,quantification and project status updation
  • Answered by sunil thakur

Interview Preparation Tips

Interview preparation tips for other job seekers - labour productivity ,quantification for material planning.

Sobha interview questions for designations

 Site Engineer

 (7)

 Estimation Engineer

 (2)

 Civil Engineer

 (2)

 Hvac Engineer

 (1)

 Project Engineer - Civil

 (4)

 Civil Site Engineer

 (3)

 Senior Project Engineer

 (2)

 Senior Site Engineer

 (2)

I applied via LinkedIn and was interviewed in Jul 2021. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Project Management related

Interview Preparation Tips

Interview preparation tips for other job seekers - Make sure you have strong basics

Get interview-ready with Top Sobha Interview Questions

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Structure related questions, Finishing work, Basic knowledge of Fire and Plumbing work, Quality codes, Glazing work, ETC..
Round 3 - HR 

(1 Question)

  • Q1. Pay rolls and offer letter

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to be confidence with your answer and have Site work knowledge.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Naukri.com and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. What is baseline schedule
  • Ans. 

    Baseline schedule is the original project schedule used as a reference point for comparison.

    • Baseline schedule is the initial approved project schedule that serves as a benchmark for measuring project progress.

    • It includes the planned start and finish dates for project activities, milestones, and deliverables.

    • Any changes to the schedule must be compared against the baseline schedule to assess impact.

    • Baseline schedule hel...

  • Answered by AI
  • Q2. What is your roles and responsibility
  • Ans. 

    Planning Engineer is responsible for creating project schedules, monitoring progress, identifying delays, and coordinating with stakeholders.

    • Creating project schedules using software like Primavera P6

    • Monitoring project progress and identifying potential delays

    • Coordinating with project team members, subcontractors, and clients

    • Analyzing project data to make informed decisions

    • Preparing progress reports and presenting to s

  • Answered by AI
  • Q3. How do you do weekly lookahead schedule
  • Ans. 

    Weekly lookahead schedule involves reviewing upcoming tasks, identifying potential issues, and adjusting the schedule accordingly.

    • Review current progress and upcoming tasks for the week

    • Identify any potential issues or constraints that may impact the schedule

    • Adjust the schedule by re-sequencing tasks or allocating additional resources if needed

    • Communicate any changes to the project team to ensure alignment

  • Answered by AI
  • Q4. How do you manage procurement schedule
  • Ans. 

    I manage procurement schedule by creating a detailed plan, tracking progress, identifying risks, and communicating with stakeholders.

    • Create a detailed procurement schedule outlining key milestones and deadlines

    • Track progress regularly to ensure tasks are completed on time

    • Identify potential risks and develop contingency plans to mitigate them

    • Communicate effectively with suppliers, team members, and stakeholders to ensur...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jul 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Start to handover process in a Project

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be well prepared in terms of all types of processes and sequences in construction. Situation based problem solving abilities and good communication skills.

I appeared for an interview before Sep 2021.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Explain Planning process
  • Ans. 

    Planning process involves defining objectives, identifying resources, creating a schedule, and monitoring progress.

    • Define project objectives and scope

    • Identify available resources and constraints

    • Create a detailed project schedule

    • Monitor progress and make adjustments as necessary

  • Answered by AI
  • Q2. Explain in deatils of planning ptocess
  • Ans. 

    The planning process involves identifying objectives, determining resources, and creating a timeline for completion.

    • Identify project objectives and goals

    • Determine available resources and constraints

    • Create a detailed project plan with timelines and milestones

    • Monitor progress and make adjustments as necessary

    • Communicate with stakeholders and team members throughout the process

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be clear on your concepts.
Put your explanation conveniences
Provide all technical details
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Dressing and personality

Round 2 - Technical 

(1 Question)

  • Q1. Site questions and finishing work

Sobha Interview FAQs

How many rounds are there in Sobha Planning Engineer interview?
Sobha interview process usually has 2-3 rounds. The most common rounds in the Sobha interview process are Technical, Resume Shortlist and Aptitude Test.
How to prepare for Sobha Planning Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Sobha. The most common topics and skills that interviewers at Sobha expect are Planning Engineering, Primavera, MS Project, Project Planning and Project Scheduling.
What are the top questions asked in Sobha Planning Engineer interview?

Some of the top questions asked at the Sobha Planning Engineer interview -

  1. How to calculate weight of st...read more
  2. How to calculate number of ti...read more
  3. Is code for method of measurem...read more

Tell us how to improve this page.

Sobha Planning Engineer Interview Process

based on 4 interviews

1 Interview rounds

  • Technical Round
View more

Interview Questions from Similar Companies

DLF Interview Questions
3.9
 • 76 Interviews
Prestige Group Interview Questions
4.3
 • 36 Interviews
Brigade Group Interview Questions
4.1
 • 32 Interviews
Ashiana Housing Interview Questions
4.0
 • 29 Interviews
Sunteck Realty Interview Questions
3.3
 • 23 Interviews
View all
Sobha Planning Engineer Salary
based on 120 salaries
₹2.4 L/yr - ₹5.1 L/yr
46% less than the average Planning Engineer Salary in India
View more details

Sobha Planning Engineer Reviews and Ratings

based on 21 reviews

3.3/5

Rating in categories

3.2

Skill development

2.1

Work-life balance

3.0

Salary

3.7

Job security

3.1

Company culture

2.6

Promotions

2.5

Work satisfaction

Explore 21 Reviews and Ratings
Planning Engineer / Planning Manager

Bangalore / Bengaluru

1-6 Yrs

Not Disclosed

Planning Engineer

Bangalore / Bengaluru

1-6 Yrs

₹ 3-5 LPA

Planning Engineer ( Nicmar )

Bangalore / Bengaluru

1-6 Yrs

Not Disclosed

Explore more jobs
Senior Engineer
505 salaries
unlock blur

₹2.8 L/yr - ₹6.5 L/yr

Project Engineer
459 salaries
unlock blur

₹3.2 L/yr - ₹8 L/yr

Assistant Manager
321 salaries
unlock blur

₹4 L/yr - ₹10.5 L/yr

Deputy Manager
204 salaries
unlock blur

₹5 L/yr - ₹11 L/yr

Senior Executive
197 salaries
unlock blur

₹2.5 L/yr - ₹6.5 L/yr

Explore more salaries
Compare Sobha with

Godrej Properties

3.7
Compare

DLF

3.9
Compare

Surya Roshni

4.1
Compare

Emaar India Limited

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview