Q. What are the different types of piles used in bridge construction?
Different types of piles used in bridge construction include driven piles, drilled piles, and helical piles.
Driven piles are installed by driving them into the ground using a pile driver.
Drilled piles are created by drilling a hole into the ground and then filling it with concrete and reinforcing steel.
Helical piles are screwed into the ground using a hydraulic motor and are often used in areas with difficult soil conditions.
Other types of piles include timber piles, steel pi...read more

Asked in Patel Engineering

Q. How do you calculate the working hours of a piece of equipment?
Working hours of an equipment can be calculated by subtracting the start time from the end time.
Obtain the start time and end time of the equipment's operation.
Convert the start and end times to a common time format, such as hours and minutes.
Subtract the start time from the end time to calculate the duration of operation.
Consider any breaks or downtime during the operation and subtract them from the total duration.
The result will be the working hours of the equipment.
Planning & Billing Engineer Interview Questions and Answers for Freshers

Asked in Shalimar Corp

Q. Explain the process of constructing a superstructure on black cotton soil.
Building a superstructure in black cotton soil requires proper soil stabilization techniques.
The soil needs to be stabilized using lime, cement, or other stabilizers.
Proper drainage systems need to be installed to prevent water accumulation.
The foundation needs to be designed to distribute the load evenly.
Pile foundation can be used to provide additional support.
Regular soil testing and monitoring is necessary to ensure stability.
Examples of successful superstructure construc...read more
Asked in Pawar Patkar Construction

Q. Which location is suitable and when can you join?
The suitable location and joining date can be discussed during the interview process.
Suitable location will depend on project requirements and company policies
Joining date can be negotiated based on notice period and project timeline
It is recommended to discuss these details with the hiring manager during the interview
Asked in MNEC

Q. What is the density of steel and types of welding process.
The density of steel is approximately 7.85 g/cm³. There are various types of welding processes including arc welding, MIG welding, and TIG welding.
The density of steel is 7.85 g/cm³.
Arc welding is a common welding process that uses an electric arc to melt and join metals.
MIG welding (Metal Inert Gas) uses a consumable wire electrode and a shielding gas to create a weld.
TIG welding (Tungsten Inert Gas) uses a non-consumable tungsten electrode and a shielding gas to create a we...read more

Asked in Patel Engineering

Q. What is the hourly operating cost of a batching plant?
The per hour cost of operating a batching plant depends on various factors such as the size of the plant, the type of materials being processed, and the labor and maintenance costs.
The size of the batching plant affects the operating cost. Larger plants generally have higher operating costs due to increased energy consumption and maintenance requirements.
The type of materials being processed also impacts the cost. Different materials may require specialized equipment or addit...read more
Planning & Billing Engineer Jobs




Asked in B.R. Goyal Infrastructure

Q. What is the process for estimating quantities in project management?
Estimating quantities involves systematic methods to assess materials and resources needed for project execution.
Define project scope: Clearly outline the project deliverables and requirements.
Break down tasks: Use Work Breakdown Structure (WBS) to divide the project into manageable components.
Gather historical data: Analyze past projects for similar tasks to inform estimates.
Use estimation techniques: Apply methods like Analogous Estimating, Parametric Estimating, or Bottom-...read more
Asked in Siddhi Constructions

Q. How do you track site progress?
I am tracking site progress through regular site visits, daily reports, and communication with the site team.
Regular site visits to observe progress and identify any issues
Reviewing daily reports to track progress against the project schedule
Communicating with the site team to understand any challenges or delays
Updating project management software with progress updates
Analyzing data to identify trends and areas for improvement
Share interview questions and help millions of jobseekers 🌟

Asked in B.R. Goyal Infrastructure

Q. What is the procedure for road construction?
Road construction involves planning, design, and execution to create durable and safe roadways.
1. Planning: Assess the need for the road, considering traffic patterns and environmental impact.
2. Design: Create detailed plans including road alignment, materials, and drainage systems.
3. Site Preparation: Clear the area of vegetation, debris, and any existing structures.
4. Earthworks: Excavate and grade the land to form the roadbed, ensuring proper drainage.
5. Subbase Installati...read more

Asked in Hi Tech Projects

Q. What is the basic rate in the contract?
The basic rate in a contract refers to the standard pricing for services or goods before any adjustments or additional costs.
The basic rate serves as the foundation for pricing in contracts.
It may vary based on factors like location, service type, or duration.
For example, a construction contract might have a basic rate of $50/hour for labor.
Additional costs such as overtime, materials, or taxes are added to the basic rate.
Asked in RMG Construction

Q. Billing and site supervision in building project
Billing and site supervision are crucial for successful building projects.
Billing involves accurately tracking expenses and ensuring timely payments to contractors and suppliers.
Site supervision involves overseeing the construction process to ensure quality work and adherence to safety regulations.
Effective communication between the billing and site supervision teams is essential for project success.
Examples of tasks include reviewing invoices, tracking labor and material cos...read more
Asked in Siddhi Constructions

Q. Do you know how to create a budget?
Yes, I know how to make a budget.
I have experience in creating budgets for various projects.
I am familiar with budgeting software and tools.
I can analyze project requirements and estimate costs accurately.
I can track expenses and adjust budgets as needed.
I can communicate budget status and variances to stakeholders.

Asked in Genpact

Q. What is depreciation?
Depreciation is the decrease in the value of an asset over time due to wear and tear, obsolescence, or other factors.
Depreciation is a method used in accounting to allocate the cost of an asset over its useful life.
It represents the reduction in the value of an asset on the balance sheet.
Depreciation can be calculated using various methods such as straight-line, declining balance, or units of production.
Example: A company purchases a machine for $10,000 with an estimated usef...read more
Asked in EBI Associates

Q. Which is code for doing billing
Billing codes are standardized codes used to identify services and procedures for billing purposes in various industries.
CPT (Current Procedural Terminology) codes are used in healthcare billing to describe medical services.
HCPCS (Healthcare Common Procedure Coding System) codes are used for billing Medicare and Medicaid.
In construction, billing codes may refer to specific line items in a contract or project management software.
For software development, billing codes can be a...read more

Asked in Takenaka

Q. How do you create a schedule?
To make a schedule, identify tasks, estimate durations, sequence tasks, assign resources, and monitor progress.
Identify all tasks that need to be completed
Estimate the duration of each task
Sequence the tasks in the order they need to be completed
Assign resources such as manpower, equipment, and materials to each task
Monitor progress regularly and make adjustments as needed

Asked in Genpact

Q. What is Reconciliation?
Reconciliation is the process of ensuring consistency and accuracy between two sets of records or accounts.
In finance, reconciliation involves comparing bank statements with company records to identify discrepancies.
In project management, it can refer to aligning project budgets with actual expenditures.
For example, a billing engineer may reconcile invoices with payment records to ensure all charges are accounted for.
Reconciliation can also apply to inventory management, ensu...read more

Asked in Casagrand

Q. How do you determine the quantity?
Quantity can be arrived at by calculating the dimensions and quantities of materials needed for a project.
Calculate the dimensions of the project area
Determine the materials needed for the project
Estimate the quantities of materials required based on the dimensions and specifications
Consider factors such as wastage and additional materials for contingencies
Use software tools like AutoCAD or Excel for accurate calculations
Asked in Pawar Patkar Construction

Q. Expertise in billing and planning
I have extensive expertise in billing and planning, including creating accurate estimates, tracking project progress, and ensuring timely payments.
Experience in creating detailed project estimates based on scope of work and materials required
Proficient in tracking project progress and identifying potential delays or issues
Skilled in preparing and submitting accurate invoices to clients and ensuring timely payments
Familiar with using billing software and tools to streamline th...read more
Asked in Pawar Patkar Construction

Q. What software is required for billing experience?
Software required for billing experience includes billing software, accounting software, and Microsoft Excel.
Billing software such as QuickBooks or FreshBooks
Accounting software like Xero or Wave
Proficiency in Microsoft Excel for data analysis and reporting


Q. Rate Analysis of BOQ Items
Rate analysis of BOQ items involves calculating the rates of various items in the Bill of Quantities.
Rate analysis involves determining the cost of materials, labor, and equipment for each item in the BOQ.
It helps in estimating the total cost of a project and comparing it with the budget.
Factors like market rates, location, and project specifications are considered in rate analysis.
Example: Calculating the rate of concrete per cubic meter based on current market prices and pr...read more


Q. Standard output of Machinery
Standard output of Machinery refers to the expected production rate or quantity of goods produced by a machine in a given time period.
Standard output is determined by the capacity and efficiency of the machinery.
Factors affecting standard output include machine speed, maintenance, and operator skill.
Examples of standard output measurements include units per hour, tons per day, or meters per minute.

Asked in Atmos Power

Q. Types of welding defects.
Common types of welding defects include porosity, undercutting, lack of fusion, and incomplete penetration.
Porosity: Occurs when gas becomes trapped in the weld, resulting in small holes or voids.
Undercutting: Happens when the base metal is melted away from the weld, creating a groove or depression.
Lack of fusion: Occurs when the weld metal fails to fuse with the base metal or previous weld pass.
Incomplete penetration: Happens when the weld does not fully penetrate the joint,...read more

Asked in Casagrand

Q. How do you perform cost analysis?
Cost analysis involves evaluating the expenses associated with a project or operation to determine its financial feasibility.
Identify all costs associated with the project or operation, including direct and indirect costs.
Break down costs into categories such as labor, materials, equipment, overhead, and contingency.
Compare actual costs to budgeted costs to identify any variances and analyze the reasons behind them.
Use cost analysis tools and techniques such as cost-benefit a...read more

Asked in Hi Tech Projects

Q. What is the billing process?
Billing involves generating invoices, tracking payments, and managing accounts receivable for services rendered.
1. Invoice Generation: Create detailed invoices based on services provided, including itemized costs.
2. Payment Tracking: Monitor incoming payments and update accounts to reflect outstanding balances.
3. Account Reconciliation: Regularly compare billing records with payment receipts to ensure accuracy.
4. Follow-Up: Contact clients for overdue payments and resolve any...read more

Asked in Accenture

Q. Introduce yourself.
I am a dedicated and detail-oriented Planning & Billing Engineer with a strong background in project management and cost control.
Bachelor's degree in Civil Engineering
Experience in creating project schedules and cost estimates
Proficient in using software such as Primavera P6 and Microsoft Project
Strong analytical and problem-solving skills
Excellent communication and teamwork abilities
Asked in EBI Associates

Q. Mode of measurement
Mode of measurement refers to the method used to quantify and assess project parameters in engineering.
Types of measurement: linear, area, volume, and weight.
Example: Linear measurement can be done using a tape measure for lengths.
Example: Area measurement may involve calculating square footage for flooring.
Example: Volume measurement is crucial for concrete pouring, often calculated in cubic meters.
Example: Weight measurement is essential for material procurement, typically ...read more