Planning process involves defining objectives, identifying resources, creating a schedule, and monitoring progress.
Define project objectives and scope
Identify available resources and constraints
Create a detailed project schedule
Monitor progress and make adjustments as necessary
The planning process involves identifying objectives, determining resources, and creating a timeline for completion.
Identify project objectives and goals
Determine available resources and constraints
Create a detailed project plan with timelines and milestones
Monitor progress and make adjustments as necessary
Communicate with stakeholders and team members throughout the process
I applied via LinkedIn and was interviewed in Jul 2021. There were 5 interview rounds.
I applied via Walk-in and was interviewed in Sep 2022. There were 4 interview rounds.
Aptitude questions easy not much difficult but have to write
I applied via Referral and was interviewed before Oct 2023. There were 2 interview rounds.
Planning engineers are responsible for creating project schedules, monitoring progress, and ensuring timely completion.
Develop project schedules using software like Primavera P6
Monitor project progress and identify potential delays
Coordinate with various teams to ensure timely completion
Prepare reports on project status and communicate with stakeholders
Implement changes to the schedule as needed to keep the project on
Critical path is the longest sequence of tasks in a project that must be completed on time to ensure the project finishes on schedule.
Critical path helps in identifying the tasks that are crucial for the project timeline.
It determines the shortest possible duration for completing the project.
Any delay in tasks on the critical path will directly impact the project's overall timeline.
Activities on the critical path have ...
Density of steel is approximately 7.85 g/cm^3.
The density of steel is commonly expressed in grams per cubic centimeter (g/cm^3).
The density of steel is approximately 7.85 g/cm^3.
Different types of steel may have slightly different densities.
Weight of steel can be calculated by multiplying the volume of steel by its density.
Calculate the volume of steel (length x width x height)
Determine the density of the specific type of steel being used
Multiply the volume by the density to get the weight
Example: Weight of a steel plate with dimensions 2m x 1m x 0.1m and density of 7850 kg/m^3 would be 2 x 1 x 0.1 x 7850 = 1570 kg
Number of tiles can be calculated by determining the area to be covered and the size of each tile.
Calculate the total area to be covered by multiplying the length and width of the space.
Determine the size of each tile in square units.
Divide the total area by the size of each tile to get the number of tiles needed.
Consider adding extra tiles for cuts and wastage.
For example, if a room is 10 feet by 12 feet and each tile
posted on 25 Apr 2023
I applied via Approached by Company and was interviewed before Apr 2022. There were 3 interview rounds.
20 question of Apti and 30 questions of Technical, timing 1 hr
posted on 1 Nov 2022
I applied via Campus Placement and was interviewed before Nov 2021. There were 3 interview rounds.
Aptitude tests your technical knowledge based on college education.
posted on 28 Sep 2022
I applied via Walk-in and was interviewed in Mar 2022. There were 3 interview rounds.
posted on 5 Sep 2023
I applied via Referral and was interviewed before Sep 2022. There were 3 interview rounds.
30 Marks Technical related to Works and Codes (Depends upon department)
The sequence of planning involves defining objectives, identifying resources, creating a schedule, and monitoring progress.
Define project objectives and scope
Identify resources needed for the project
Create a detailed schedule outlining tasks and milestones
Allocate resources effectively to meet project deadlines
Monitor progress and make adjustments as needed
Project deliverables are the tangible outcomes or results that must be produced to complete a project.
They are specific, measurable, and usually time-bound.
Examples include reports, prototypes, software, buildings, or any other tangible product or result.
Deliverables help to define the scope of the project and provide a clear target for the project team.
Labour outputs refer to the amount of work completed by a laborer within a specific time frame.
Labour outputs are typically measured in units of work completed, such as square meters of concrete poured or number of bricks laid.
They are influenced by factors such as skill level of the laborer, availability of tools and equipment, and working conditions.
Monitoring and analyzing labour outputs can help in assessing produc...
Key responsibilities include creating project schedules, monitoring progress, identifying delays, and providing recommendations for improvement.
Creating and maintaining project schedules using software like Primavera P6
Monitoring project progress and identifying potential delays
Analyzing project data to provide recommendations for improvement
Collaborating with project team members to ensure schedule adherence
Preparing ...
based on 1 interview
Interview experience
based on 4 reviews
Rating in categories
Assistant Manager
733
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive
470
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
190
salaries
| ₹0 L/yr - ₹0 L/yr |
Sales Executive
123
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
113
salaries
| ₹0 L/yr - ₹0 L/yr |
DLF
Sobha
Prestige Group
Brigade Group