I applied via Referral and was interviewed before Aug 2021. There were 2 interview rounds.
CPI & SPI are performance indices used in project management. Scheduling involves loading resources & creating reports.
CPI (Cost Performance Index) measures the cost efficiency of a project, while SPI (Schedule Performance Index) measures the schedule efficiency.
Resources can be loaded into a program by assigning them to specific tasks in the project schedule.
Scheduling can be done using different techniques such as Cr...
Top trending discussions
I applied via Company Website and was interviewed before May 2023. There were 3 interview rounds.
Primary duties of planning engineer include creating project schedules, monitoring progress, identifying delays, and coordinating with stakeholders.
Creating and maintaining project schedules
Monitoring project progress and identifying delays
Coordinating with project team members and stakeholders
Analyzing project data and providing reports
Implementing changes to schedules as needed
Basic things required to create a project plan include defining project scope, setting objectives, creating a work breakdown structure, determining resources, and establishing a timeline.
Define project scope to outline the boundaries and deliverables of the project.
Set clear objectives to ensure the project goals are understood by all stakeholders.
Create a work breakdown structure (WBS) to break down the project into m...
Total float is the amount of time an activity can be delayed without delaying the project, while free float is the amount of time an activity can be delayed without delaying the early start of its successor activity.
Total float is the total amount of time that an activity can be delayed without delaying the project completion date.
Free float is the amount of time that an activity can be delayed without delaying the ear...
Constraints are limitations or restrictions that affect the planning and execution of a project.
Constraints can be related to time, budget, resources, or scope.
They can also include external factors such as regulations, market conditions, or stakeholder requirements.
Examples of constraints include a fixed deadline, a limited budget, a shortage of skilled labor, or a specific technology requirement.
Critical path is the longest sequence of activities in a project that determines the shortest possible duration. Float of critical activities is zero.
Critical path is the sequence of activities that determines the minimum project duration.
It consists of activities that have zero float, meaning any delay in these activities will delay the project.
Float of critical activities is zero, meaning they cannot be delayed witho...
Resource leveling is the process of smoothing out resource allocation to prevent peaks and valleys in resource usage.
Resource leveling involves adjusting the start and finish dates of activities to ensure resources are not overallocated at any point in time.
Resource allocation is the process of assigning resources to specific activities based on availability, skills, and requirements.
Resource leveling helps in optimizi...
A good schedule is one that is realistic, achievable, and well-organized.
A good schedule should be realistic and take into account all necessary tasks and resources.
It should be achievable within the given time frame and budget.
The schedule should be well-organized with clear milestones and deadlines.
Regular monitoring and updates are essential to ensure the schedule stays on track.
Examples: Gantt charts, critical path
I would consider various factors before making a decision, such as career growth opportunities, job satisfaction, work-life balance, and potential for learning and development.
Consider the overall job satisfaction and career growth opportunities in the current company
Evaluate the potential for learning and development in the new company
Assess the work-life balance and job security in both companies
Consider any addition...
I applied via Company Website and was interviewed before Apr 2023. There were 2 interview rounds.
Scheduling in instrumentation and control for rotating equipment involves creating a detailed plan to ensure proper maintenance and operation.
Develop a detailed schedule outlining maintenance tasks for each piece of rotating equipment
Coordinate with operations and maintenance teams to ensure minimal downtime during maintenance activities
Utilize software tools such as CMMS to track maintenance activities and schedule fu...
Surge control in compressor is essential to prevent damage and maintain efficiency.
Surge control involves monitoring and adjusting the flow rate of the compressor to prevent surging.
Methods for surge control include using anti-surge valves, recycle valves, and variable speed drives.
Surge control systems often use sensors to detect changes in pressure and flow rate, triggering adjustments to prevent surging.
Proper surge...
Synchronisation in generators is the process of matching the voltage, frequency, and phase angle of multiple generators before connecting them in parallel.
Synchronisation ensures that the generators are operating in sync to prevent damage or power loss.
Key factors for synchronisation include voltage, frequency, and phase angle matching.
Synchronisation is typically done using synchronising lamps, synchroscopes, or autom...
I applied via Naukri.com
He asked me what is your work experience.
& Also which software you already used.
How to bss..
He had give me one example for related to civil construction line..
I applied via Company Website and was interviewed before May 2023. There were 3 interview rounds.
Primary duties of planning engineer include creating project schedules, monitoring progress, identifying delays, and coordinating with stakeholders.
Creating and maintaining project schedules
Monitoring project progress and identifying delays
Coordinating with project team members and stakeholders
Analyzing project data and providing reports
Implementing changes to schedules as needed
Basic things required to create a project plan include defining project scope, setting objectives, creating a work breakdown structure, determining resources, and establishing a timeline.
Define project scope to outline the boundaries and deliverables of the project.
Set clear objectives to ensure the project goals are understood by all stakeholders.
Create a work breakdown structure (WBS) to break down the project into m...
Total float is the amount of time an activity can be delayed without delaying the project, while free float is the amount of time an activity can be delayed without delaying the early start of its successor activity.
Total float is the total amount of time that an activity can be delayed without delaying the project completion date.
Free float is the amount of time that an activity can be delayed without delaying the ear...
Constraints are limitations or restrictions that affect the planning and execution of a project.
Constraints can be related to time, budget, resources, or scope.
They can also include external factors such as regulations, market conditions, or stakeholder requirements.
Examples of constraints include a fixed deadline, a limited budget, a shortage of skilled labor, or a specific technology requirement.
Critical path is the longest sequence of activities in a project that determines the shortest possible duration. Float of critical activities is zero.
Critical path is the sequence of activities that determines the minimum project duration.
It consists of activities that have zero float, meaning any delay in these activities will delay the project.
Float of critical activities is zero, meaning they cannot be delayed witho...
Resource leveling is the process of smoothing out resource allocation to prevent peaks and valleys in resource usage.
Resource leveling involves adjusting the start and finish dates of activities to ensure resources are not overallocated at any point in time.
Resource allocation is the process of assigning resources to specific activities based on availability, skills, and requirements.
Resource leveling helps in optimizi...
A good schedule is one that is realistic, achievable, and well-organized.
A good schedule should be realistic and take into account all necessary tasks and resources.
It should be achievable within the given time frame and budget.
The schedule should be well-organized with clear milestones and deadlines.
Regular monitoring and updates are essential to ensure the schedule stays on track.
Examples: Gantt charts, critical path
I would consider various factors before making a decision, such as career growth opportunities, job satisfaction, work-life balance, and potential for learning and development.
Consider the overall job satisfaction and career growth opportunities in the current company
Evaluate the potential for learning and development in the new company
Assess the work-life balance and job security in both companies
Consider any addition...
I applied via Company Website and was interviewed before Apr 2023. There were 2 interview rounds.
Scheduling in instrumentation and control for rotating equipment involves creating a detailed plan to ensure proper maintenance and operation.
Develop a detailed schedule outlining maintenance tasks for each piece of rotating equipment
Coordinate with operations and maintenance teams to ensure minimal downtime during maintenance activities
Utilize software tools such as CMMS to track maintenance activities and schedule fu...
Surge control in compressor is essential to prevent damage and maintain efficiency.
Surge control involves monitoring and adjusting the flow rate of the compressor to prevent surging.
Methods for surge control include using anti-surge valves, recycle valves, and variable speed drives.
Surge control systems often use sensors to detect changes in pressure and flow rate, triggering adjustments to prevent surging.
Proper surge...
Synchronisation in generators is the process of matching the voltage, frequency, and phase angle of multiple generators before connecting them in parallel.
Synchronisation ensures that the generators are operating in sync to prevent damage or power loss.
Key factors for synchronisation include voltage, frequency, and phase angle matching.
Synchronisation is typically done using synchronising lamps, synchroscopes, or autom...
I applied via Naukri.com
He asked me what is your work experience.
& Also which software you already used.
How to bss..
He had give me one example for related to civil construction line..
I applied via Approached by Company and was interviewed before Dec 2021. There were 5 interview rounds.