Lead Planning Engineer

Lead Planning Engineer Interview Questions and Answers

Updated 10 Aug 2023
search-icon

Q1. What is the planning for maintenance, how it is proceed and how to help planning for equipment reliability, availability and plan adherence?

Ans.

Maintenance planning involves ensuring equipment reliability, availability, and adherence to plans.

  • Maintenance planning involves scheduling regular maintenance activities to ensure equipment reliability and availability.

  • This includes creating maintenance plans, scheduling maintenance activities, and tracking maintenance progress.

  • To help with equipment reliability, maintenance planning may involve identifying potential issues before they occur and taking preventative measures....read more

Q2. What is the availability, reliability of plant?

Ans.

Availability and reliability of a plant refer to its operational uptime and performance consistency.

  • Availability is the measure of how often a plant is operational and ready for use.

  • Reliability is the measure of how consistently a plant performs without failures or breakdowns.

  • Availability is usually expressed as a percentage, indicating the amount of time the plant is available for operation.

  • Reliability is often measured using metrics like Mean Time Between Failures (MTBF) an...read more

Q3. How can you perform hydro test?

Ans.

Hydro test can be performed by filling the equipment with water and pressurizing it to check for leaks or defects.

  • Ensure all connections are tight and secure before filling with water

  • Gradually increase pressure to desired level and hold for specified time

  • Inspect for leaks or defects during and after the test

  • Drain and dry equipment thoroughly after test is complete

Q4. What is vortex finder?

Ans.

A vortex finder is a component of a hydrocyclone used to separate particles from a liquid mixture.

  • It is a cylindrical tube located at the top of the hydrocyclone.

  • It is used to create a vortex within the hydrocyclone, which separates the particles from the liquid.

  • The size and shape of the vortex finder can affect the efficiency of the separation process.

Are these interview questions helpful?

Q5. What are the planning stages?

Ans.

The planning stages typically include initiation, planning, execution, monitoring, and closure.

  • Initiation stage involves defining the project objectives and scope.

  • Planning stage includes creating a detailed project plan, identifying resources, and setting timelines.

  • Execution stage involves carrying out the project activities according to the plan.

  • Monitoring stage includes tracking progress, identifying issues, and making necessary adjustments.

  • Closure stage involves completing...read more

Q6. How to calculate percentage

Ans.

Percentage can be calculated by dividing the part by the whole and multiplying by 100.

  • To calculate percentage, divide the part by the whole and multiply by 100.

  • For example, to find 20% of 50, you would calculate (20/100) * 50 = 10.

Share interview questions and help millions of jobseekers 🌟

man-with-laptop

Q7. What is the critical path

Ans.

The critical path is the longest sequence of dependent tasks that must be completed on time in order for the project to finish on schedule.

  • Critical path helps in identifying the tasks that are crucial for project completion

  • It determines the shortest possible duration for the project

  • Any delay in tasks on the critical path will directly impact the project timeline

  • Activities on the critical path have zero float or slack time

  • Example: In a construction project, pouring concrete ma...read more

Q8. What is the Total float

Ans.

Total float is the amount of time a task can be delayed without delaying the project completion date.

  • Total float is calculated by subtracting the Early Start date of a task from its Late Start date.

  • It represents the flexibility in scheduling a task without affecting the project deadline.

  • Tasks with zero total float are critical path tasks that must be completed on time to avoid project delays.

Lead Planning Engineer Jobs

Lead Planning Engineer 5-10 years
Protecon BTG Private Limited
4.5
New Delhi
Lead Planning Engineer 8-13 years
Akashganga Infraventures India
4.0
New Delhi

Q9. Billing details for client

Ans.

Billing details for client include invoicing, payment terms, billing frequency, and any specific client requirements.

  • Invoicing details should include billing address, contact person, and any specific format required by the client.

  • Payment terms should be clearly outlined, including due dates, late payment penalties, and accepted payment methods.

  • Billing frequency can vary based on the project scope and client agreement, such as monthly, quarterly, or upon project milestones.

  • Cli...read more

Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Interview experiences of popular companies

4.2
 • 246 Interviews
4.2
 • 109 Interviews
4.1
 • 82 Interviews
4.2
 • 58 Interviews
4.5
 • 5 Interviews
4.2
 • 4 Interviews
View all

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

Lead Planning Engineer Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
65 L+

Reviews

4 L+

Interviews

4 Cr+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter