I applied via Company Website and was interviewed before Feb 2023. There was 1 interview round.
To prepare a schedule in P6, start by defining project activities, assigning resources, setting durations, and establishing dependencies.
Define project activities with start and finish dates
Assign resources to each activity
Set durations for each activity
Establish dependencies between activities
Review and adjust the schedule as needed
Progress Measurement System is a method used to track and monitor the progress of a project by measuring completed work against planned work.
It involves setting up a baseline schedule to compare actual progress against
Progress is measured using various methods such as Earned Value Management (EVM) or milestone tracking
It helps in identifying delays, deviations, and areas of improvement in the project
Regular progress re...
Baseline schedule is the original project schedule against which actual progress is measured.
Baseline schedule is the initial approved project schedule.
It serves as a reference point for comparing actual progress and performance.
Any changes to the baseline schedule require formal approval and documentation.
It includes key milestones, deliverables, and timelines.
Example: If a project is scheduled to be completed in 6 mo...
MPR stands for Monthly Progress Report. It is a document prepared by the Planning Engineer to track and report the progress of a project on a monthly basis.
Gather data on project progress, including completed activities, milestones achieved, and any delays or issues encountered.
Update the project schedule with actual progress and analyze any deviations from the baseline schedule.
Include a summary of key performance ind...
DPR (Daily Progress Report) can be prepared by collecting daily updates, analyzing progress against plan, and documenting any issues or delays.
Collect daily updates from site engineers and subcontractors
Analyze progress against the planned schedule to identify any deviations
Document any issues or delays encountered during the day
Include details of work completed, work planned for the next day, and any resources/materia...
I applied via Walk-in and was interviewed before Feb 2023. There was 1 interview round.
I applied via Approached by Company and was interviewed in Feb 2022. There was 1 interview round.
I applied via Walk-in and was interviewed before Jan 2020. There were 3 interview rounds.
A baseline schedule is the original project schedule that is used as a reference point for measuring progress and performance.
It is the approved version of the project schedule
It includes the planned start and end dates for each activity
It serves as a benchmark for measuring project performance
Changes to the baseline schedule must be approved through a formal change control process
It is used to compare actual progress
Planning in Primavera involves creating a project schedule, assigning resources, and tracking progress.
Create a Work Breakdown Structure (WBS)
Define activities and their dependencies
Assign resources and durations
Set baselines and track progress
Use filters and reports to analyze data
Update the schedule regularly
Use risk management techniques
Integrate with other software tools
Train team members on Primavera
Follow industr
Protecon BTG interview questions for popular designations
I applied via Naukri.com and was interviewed in Jun 2019. There was 1 interview round.
Carpet area is the actual usable area of a flat, built-up area includes carpet area plus thickness of walls, super built-up area includes built-up area plus common areas.
Carpet area is the area within the walls of a flat that can be used for living purposes.
Built-up area includes carpet area plus the thickness of walls.
Super built-up area includes built-up area plus common areas like lobby, staircase, etc.
Carpet area i...
Top trending discussions
posted on 1 Jun 2022
I applied via Campus Placement and was interviewed before Jun 2021. There were 2 interview rounds.
Aptitude question and reasoning.
Design of a building
Determine the purpose and function of the building
Consider the site and location
Create a preliminary design and get feedback
Finalize the design and create detailed plans
Ensure compliance with building codes and regulations
I applied via Company Website and was interviewed before Jan 2023. There were 2 interview rounds.
Free float is the amount of time a task can be delayed without affecting the project's critical path. Total float is the total amount of time a task can be delayed without delaying the project's completion.
Free float is specific to an individual task, while total float is applicable to the entire project.
Free float is calculated by subtracting the early start date of a task from the early finish date of its successor t...
Critical path is the longest sequence of activities in a project that determines the project's overall duration.
Critical path consists of activities that have zero slack or float time.
Any delay in activities on the critical path will directly impact the project's completion time.
Activities on the critical path must be closely monitored and managed to ensure timely project completion.
Critical path analysis helps in iden...
Look ahead is a planning technique to anticipate future activities. In P6, the 1-month look ahead can be found using filters and layouts.
Look ahead is a proactive planning approach to identify and prepare for upcoming activities.
In P6, the 1-month look ahead can be created by applying filters and layouts to the project schedule.
Filters can be set to display activities that are scheduled within the next month.
Layouts ca...
Global change refers to the long-term alterations in the Earth's systems and processes due to human activities and natural factors.
Global change encompasses various interconnected phenomena such as climate change, biodiversity loss, deforestation, and pollution.
It involves both anthropogenic (human-induced) factors like greenhouse gas emissions and natural factors like volcanic eruptions.
Global change has wide-ranging ...
The productivity rate of a welder refers to the amount of work they can complete in a given time period.
Productivity rate is measured in units of work per hour or per day.
Factors that can affect a welder's productivity rate include their skill level, the complexity of the welding task, and the availability of necessary equipment.
For example, an experienced welder may have a higher productivity rate than a novice welder...
Asked to prepare a schedule of a building
posted on 15 Mar 2021
posted on 6 Mar 2024
I applied via Approached by Company and was interviewed before Mar 2023. There was 1 interview round.
EPC contract involves Engineering, Procurement, and Construction services provided by a single contractor, while item rate contract involves pricing based on individual items of work.
EPC contract is a turnkey solution where the contractor is responsible for the design, procurement, and construction of the project.
Item rate contract involves pricing based on specific items of work, with rates predetermined for each item...
posted on 3 Nov 2021
I applied via Referral and was interviewed before Nov 2020. There was 1 interview round.
based on 3 interviews
Interview experience
based on 52 reviews
Rating in categories
Planning Engineer
28
salaries
| ₹0 L/yr - ₹0 L/yr |
Management Trainee
16
salaries
| ₹0 L/yr - ₹0 L/yr |
Cost and Planning Engineer
14
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Planning Engineer
13
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Cost and Planning Engineer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Thermax Limited
BGR Energy Systems
Larsen & Toubro Limited
Siemens