I applied via Company Website and was interviewed before Feb 2023. There was 1 interview round.
To prepare a schedule in P6, start by defining project activities, assigning resources, setting durations, and establishing dependencies.
Define project activities with start and finish dates
Assign resources to each activity
Set durations for each activity
Establish dependencies between activities
Review and adjust the schedule as needed
Progress Measurement System is a method used to track and monitor the progress of a project by measuring completed work against planned work.
It involves setting up a baseline schedule to compare actual progress against
Progress is measured using various methods such as Earned Value Management (EVM) or milestone tracking
It helps in identifying delays, deviations, and areas of improvement in the project
Regular progress re...
Baseline schedule is the original project schedule against which actual progress is measured.
Baseline schedule is the initial approved project schedule.
It serves as a reference point for comparing actual progress and performance.
Any changes to the baseline schedule require formal approval and documentation.
It includes key milestones, deliverables, and timelines.
Example: If a project is scheduled to be completed in 6 mo...
MPR stands for Monthly Progress Report. It is a document prepared by the Planning Engineer to track and report the progress of a project on a monthly basis.
Gather data on project progress, including completed activities, milestones achieved, and any delays or issues encountered.
Update the project schedule with actual progress and analyze any deviations from the baseline schedule.
Include a summary of key performance ind...
DPR (Daily Progress Report) can be prepared by collecting daily updates, analyzing progress against plan, and documenting any issues or delays.
Collect daily updates from site engineers and subcontractors
Analyze progress against the planned schedule to identify any deviations
Document any issues or delays encountered during the day
Include details of work completed, work planned for the next day, and any resources/materia...
I applied via Walk-in and was interviewed before Feb 2023. There was 1 interview round.
I applied via Approached by Company and was interviewed in Feb 2022. There was 1 interview round.
I applied via Walk-in and was interviewed before Jan 2020. There were 3 interview rounds.
A baseline schedule is the original project schedule that is used as a reference point for measuring progress and performance.
It is the approved version of the project schedule
It includes the planned start and end dates for each activity
It serves as a benchmark for measuring project performance
Changes to the baseline schedule must be approved through a formal change control process
It is used to compare actual progress
Planning in Primavera involves creating a project schedule, assigning resources, and tracking progress.
Create a Work Breakdown Structure (WBS)
Define activities and their dependencies
Assign resources and durations
Set baselines and track progress
Use filters and reports to analyze data
Update the schedule regularly
Use risk management techniques
Integrate with other software tools
Train team members on Primavera
Follow industr
Protecon BTG interview questions for popular designations
I applied via Naukri.com and was interviewed in Jun 2019. There was 1 interview round.
Carpet area is the actual usable area of a flat, built-up area includes carpet area plus thickness of walls, super built-up area includes built-up area plus common areas.
Carpet area is the area within the walls of a flat that can be used for living purposes.
Built-up area includes carpet area plus the thickness of walls.
Super built-up area includes built-up area plus common areas like lobby, staircase, etc.
Carpet area i...
Top trending discussions
posted on 10 Feb 2025
I was interviewed in Jan 2025.
Quantitative reasoning
posted on 22 Dec 2024
The output voltage of an AAAC Rabbit conductor is typically around 600 volts.
The output voltage of an AAAC Rabbit conductor is usually around 600 volts.
The exact output voltage may vary depending on the specific application and conditions.
It is important to consult the manufacturer's specifications for accurate information.
My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed timeline with milestones and deadlines
Assign tasks to team members based on their strengths and expertise
Regularly monitor progress and make adjustments as needed
Communicate effectively with team members and stakeholders
Ut...
Job safety analysis is a process of identifying potential hazards in a job task and implementing controls to mitigate risks.
Involves breaking down a job task into steps
Identifying potential hazards for each step
Determining preventive measures to reduce risks
Ensures workers are aware of safety procedures
Examples: construction site JSA, manufacturing plant JSA
Hazard identification is the process of identifying potential sources of harm in the workplace, while risk assessment involves evaluating the likelihood and severity of those hazards.
Hazard identification involves identifying potential sources of harm such as chemicals, machinery, or ergonomic factors.
Risk assessment involves evaluating the likelihood and severity of harm from these hazards.
The goal is to implement con...
Fire safety refers to measures taken to prevent and protect against the risks of fire.
Fire safety includes having working smoke detectors in place.
It also involves creating and practicing a fire escape plan.
Proper storage and handling of flammable materials is crucial for fire safety.
Regular maintenance of fire extinguishers and other fire safety equipment is important.
Training employees on fire safety protocols is ess
A hazard site is a location where there is a potential risk of harm to people, property, or the environment.
Hazard sites can include industrial facilities, chemical plants, nuclear power plants, and construction sites.
These sites may contain hazardous materials, dangerous equipment, or unsafe conditions.
Proper safety measures and protocols must be followed at hazard sites to prevent accidents and injuries.
Examples of h...
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.
It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.
Helps in estimating the quantity of steel required for construction.
Ensures proper placement and bending of reinforcement bars as per design specifications.
Used by contractors, engineers, and construction workers for re...
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing
It is important for assessing the quality of concrete and its ability to support structural loads
The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing
Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.
Mivan is faster and more efficient than conventional construction methods.
Mivan requires skilled labor for installation of aluminum formwork.
Conventional construction is more labor-intensive and time-consuming.
Mivan provides better quality finishes compared to conventional...
Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.
Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.
It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.
Self leveling concrete can be applied in thicknesses ranging from a featheredg...
The 1st Aluform mockup concreting typically takes 1-2 days to complete.
1-2 days is the usual timeframe for 1st Aluform mockup concreting
Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration
Proper planning and coordination can help expedite the process
based on 3 interviews
Interview experience
based on 51 reviews
Rating in categories
Planning Engineer
28
salaries
| ₹3 L/yr - ₹12 L/yr |
Management Trainee
16
salaries
| ₹1.8 L/yr - ₹5 L/yr |
Cost and Planning Engineer
14
salaries
| ₹3 L/yr - ₹10.5 L/yr |
Senior Planning Engineer
13
salaries
| ₹4.5 L/yr - ₹7.5 L/yr |
Project Management Trainee
8
salaries
| ₹1.8 L/yr - ₹3.5 L/yr |
Thermax Limited
BGR Energy Systems
Larsen & Toubro Limited
Siemens