I applied via Company Website and was interviewed before Feb 2023. There was 1 interview round.
To prepare a schedule in P6, start by defining project activities, assigning resources, setting durations, and establishing dependencies.
Define project activities with start and finish dates
Assign resources to each activity
Set durations for each activity
Establish dependencies between activities
Review and adjust the schedule as needed
Progress Measurement System is a method used to track and monitor the progress of a project by measuring completed work against planned work.
It involves setting up a baseline schedule to compare actual progress against
Progress is measured using various methods such as Earned Value Management (EVM) or milestone tracking
It helps in identifying delays, deviations, and areas of improvement in the project
Regular progress re...
Baseline schedule is the original project schedule against which actual progress is measured.
Baseline schedule is the initial approved project schedule.
It serves as a reference point for comparing actual progress and performance.
Any changes to the baseline schedule require formal approval and documentation.
It includes key milestones, deliverables, and timelines.
Example: If a project is scheduled to be completed in 6 mo...
MPR stands for Monthly Progress Report. It is a document prepared by the Planning Engineer to track and report the progress of a project on a monthly basis.
Gather data on project progress, including completed activities, milestones achieved, and any delays or issues encountered.
Update the project schedule with actual progress and analyze any deviations from the baseline schedule.
Include a summary of key performance ind...
DPR (Daily Progress Report) can be prepared by collecting daily updates, analyzing progress against plan, and documenting any issues or delays.
Collect daily updates from site engineers and subcontractors
Analyze progress against the planned schedule to identify any deviations
Document any issues or delays encountered during the day
Include details of work completed, work planned for the next day, and any resources/materia...
I applied via Walk-in and was interviewed before Jan 2020. There were 3 interview rounds.
A baseline schedule is the original project schedule that is used as a reference point for measuring progress and performance.
It is the approved version of the project schedule
It includes the planned start and end dates for each activity
It serves as a benchmark for measuring project performance
Changes to the baseline schedule must be approved through a formal change control process
It is used to compare actual progress ...
Planning in Primavera involves creating a project schedule, assigning resources, and tracking progress.
Create a Work Breakdown Structure (WBS)
Define activities and their dependencies
Assign resources and durations
Set baselines and track progress
Use filters and reports to analyze data
Update the schedule regularly
Use risk management techniques
Integrate with other software tools
Train team members on Primavera
Follow industr...
Top trending discussions
posted on 31 Oct 2023
I applied via Approached by Company and was interviewed in Apr 2022. There was 1 interview round.
posted on 14 Oct 2023
I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.
Process of variation involves documenting and analyzing changes in project scope, cost, or schedule.
Variations are changes to the original scope, cost, or schedule of a project
Variations must be documented and approved by the relevant parties
The impact of variations on project budget and timeline must be analyzed
Examples of variations include design changes, unforeseen site conditions, and client requests
I applied via LinkedIn and was interviewed in Feb 2022. There were 2 interview rounds.
I am a civil engineer with experience in designing and managing construction projects.
I have a Bachelor's degree in Civil Engineering from XYZ University.
I have worked on various projects including designing bridges, roads, and buildings.
I am skilled in using software such as AutoCAD and Revit for designing.
I have experience in managing construction projects and ensuring they are completed on time and within budget.
I a...
posted on 5 Jun 2024
Optimistic costing involves estimating project costs on the lower end of the spectrum.
Identify all potential cost-saving measures and efficiencies in the project plan.
Use historical data and benchmarks to estimate costs on the lower side.
Consider best-case scenarios and optimistic assumptions when estimating costs.
Collaborate with stakeholders to gather insights and input on cost-saving opportunities.
Regularly review a...
posted on 22 Nov 2023
I applied via Naukri.com and was interviewed before Nov 2022. There were 3 interview rounds.
posted on 14 Oct 2023
I applied via Walk-in and was interviewed in Sep 2023. There were 2 interview rounds.
The weight of green concrete varies depending on the mix design and components used.
The weight of green concrete typically ranges from 140 to 150 pounds per cubic foot.
Factors such as the type and amount of aggregates, cement, water, and admixtures used can affect the weight.
Lightweight concrete can have a lower weight, while high-density concrete can be heavier.
The weight of green concrete is important for structural ...
The formula for tensile strength of concrete is based on the cross-sectional area and maximum load applied.
Tensile Strength = Maximum Load / Cross-sectional Area
The units for tensile strength are typically in MPa (megapascals)
Tensile strength is an important property of concrete for determining its ability to resist tension forces
For example, if a concrete specimen with a cross-sectional area of 100 square millimeters ...
The water cement ratio of concrete refers to the ratio of the weight of water to the weight of cement used in a concrete mix.
The water cement ratio is a crucial factor in determining the strength and durability of concrete.
A lower water cement ratio results in stronger and more durable concrete.
The ideal water cement ratio varies depending on the type of concrete mix and its intended use.
For example, a typical water ce...
IS code of steel refers to the Indian Standard code for steel materials and products.
IS 2062:2011 - Steel for general structural purposes
IS 1786:2008 - High strength deformed steel bars and wires for concrete reinforcement
IS 8500:1991 - Structural steel - Microalloyed (medium and high strength qualities)
based on 1 interview experience
Difficulty level
Duration
based on 8 reviews
Rating in categories
Planning Engineer
27
salaries
| ₹3 L/yr - ₹12 L/yr |
Senior Planning Engineer
14
salaries
| ₹4.5 L/yr - ₹7.5 L/yr |
Cost and Planning Engineer
13
salaries
| ₹3 L/yr - ₹10.5 L/yr |
Management Trainee
11
salaries
| ₹1.8 L/yr - ₹5 L/yr |
Project Control Manager
7
salaries
| ₹15 L/yr - ₹18.6 L/yr |
Lea Associates South Asia
R.V.R. PROJECTS
ABCI Infrastructures
VIKRAN Engineering & Exim