To prepare a schedule in P6, start by defining project activities, assigning resources, setting durations, and establishing dependencies.
Define project activities with start and finish dates
Assign resources to each activity
Set durations for each activity
Establish dependencies between activities
Review and adjust the schedule as needed
Progress Measurement System is a method used to track and monitor the progress of a project by measuring completed work against planned work.
It involves setting up a baseline schedule to compare actual progress against
Progress is measured using various methods such as Earned Value Management (EVM) or milestone tracking
It helps in identifying delays, deviations, and areas of improvement in the project
Regular progress re...
Baseline schedule is the original project schedule against which actual progress is measured.
Baseline schedule is the initial approved project schedule.
It serves as a reference point for comparing actual progress and performance.
Any changes to the baseline schedule require formal approval and documentation.
It includes key milestones, deliverables, and timelines.
Example: If a project is scheduled to be completed in 6 mo...
MPR stands for Monthly Progress Report. It is a document prepared by the Planning Engineer to track and report the progress of a project on a monthly basis.
Gather data on project progress, including completed activities, milestones achieved, and any delays or issues encountered.
Update the project schedule with actual progress and analyze any deviations from the baseline schedule.
Include a summary of key performance ind...
DPR (Daily Progress Report) can be prepared by collecting daily updates, analyzing progress against plan, and documenting any issues or delays.
Collect daily updates from site engineers and subcontractors
Analyze progress against the planned schedule to identify any deviations
Document any issues or delays encountered during the day
Include details of work completed, work planned for the next day, and any resources/materia...
I applied via Walk-in and was interviewed before Jan 2020. There were 3 interview rounds.
A baseline schedule is the original project schedule that is used as a reference point for measuring progress and performance.
It is the approved version of the project schedule
It includes the planned start and end dates for each activity
It serves as a benchmark for measuring project performance
Changes to the baseline schedule must be approved through a formal change control process
It is used to compare actual progress
Planning in Primavera involves creating a project schedule, assigning resources, and tracking progress.
Create a Work Breakdown Structure (WBS)
Define activities and their dependencies
Assign resources and durations
Set baselines and track progress
Use filters and reports to analyze data
Update the schedule regularly
Use risk management techniques
Integrate with other software tools
Train team members on Primavera
Follow industr
Top trending discussions
posted on 5 Jun 2024
Optimistic costing involves estimating project costs on the lower end of the spectrum.
Identify all potential cost-saving measures and efficiencies in the project plan.
Use historical data and benchmarks to estimate costs on the lower side.
Consider best-case scenarios and optimistic assumptions when estimating costs.
Collaborate with stakeholders to gather insights and input on cost-saving opportunities.
Regularly review a...
posted on 13 Sep 2022
I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.
based on 8 reviews
Rating in categories
Planning Engineer
29
salaries
| ₹1.8 L/yr - ₹9.6 L/yr |
Management Trainee
16
salaries
| ₹1.8 L/yr - ₹5 L/yr |
Cost and Planning Engineer
14
salaries
| ₹3 L/yr - ₹10.5 L/yr |
Senior Planning Engineer
13
salaries
| ₹4.5 L/yr - ₹7.5 L/yr |
Project Management Trainee
8
salaries
| ₹1.8 L/yr - ₹3.5 L/yr |
Thermax Limited
BGR Energy Systems
Larsen & Toubro Limited
Siemens