i
Montecarlo Construction
Filter interviews by
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Environment refers to the surroundings or conditions in which a person, animal, or plant lives or operates.
Environment includes both natural and man-made elements such as air, water, soil, buildings, and infrastructure.
It can also refer to the social and cultural surroundings that influence an individual or group.
The environment plays a crucial role in determining the health and well-being of living organisms.
Examples ...
Different types of pollution include air pollution, water pollution, soil pollution, noise pollution, and light pollution.
Air pollution: caused by emissions from vehicles, factories, and burning of fossil fuels.
Water pollution: caused by industrial waste, sewage, and agricultural runoff.
Soil pollution: caused by chemicals, pesticides, and improper waste disposal.
Noise pollution: caused by loud noises from traffic, cons...
General questions about job profile and roles and responsibilities...
I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.
Montecarlo Construction interview questions for popular designations
Total float is the amount of time a task can be delayed without delaying the project completion date.
Total float is calculated by subtracting the Early Start date of a task from its Late Start date.
It represents the flexibility in scheduling a task without affecting the project deadline.
Tasks with zero total float are critical path tasks that must be completed on time to avoid project delays.
The critical path is the longest sequence of dependent tasks that must be completed on time in order for the project to finish on schedule.
Critical path helps in identifying the tasks that are crucial for project completion
It determines the shortest possible duration for the project
Any delay in tasks on the critical path will directly impact the project timeline
Activities on the critical path have zero float or slack t...
Percentage can be calculated by dividing the part by the whole and multiplying by 100.
To calculate percentage, divide the part by the whole and multiply by 100.
For example, to find 20% of 50, you would calculate (20/100) * 50 = 10.
Billing details for client include invoicing, payment terms, billing frequency, and any specific client requirements.
Invoicing details should include billing address, contact person, and any specific format required by the client.
Payment terms should be clearly outlined, including due dates, late payment penalties, and accepted payment methods.
Billing frequency can vary based on the project scope and client agreement, ...
I applied via Approached by Company and was interviewed in Feb 2024. There were 2 interview rounds.
Water qurin and soil dump $ cutting
Wmm and gsb dbm BC pqc ets
I was interviewed in Mar 2024.
Top trending discussions
The duration of Montecarlo Construction interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 33 interviews
Interview experience
based on 360 reviews
Rating in categories
Assistant Manager
66
salaries
| ₹6.4 L/yr - ₹10.8 L/yr |
Assistant Engineer
47
salaries
| ₹2.1 L/yr - ₹4.2 L/yr |
Deputy Manager
37
salaries
| ₹8.5 L/yr - ₹12 L/yr |
Senior Engineer
35
salaries
| ₹4.8 L/yr - ₹8 L/yr |
Engineer
21
salaries
| ₹3 L/yr - ₹6 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company