i
Montecarlo Construction
Filter interviews by
I applied via Job Portal
I applied via Referral and was interviewed before Aug 2021. There were 3 interview rounds.
posted on 6 Jan 2022
I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.
I applied via Company Website and was interviewed in Jun 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed before Jan 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
I applied via Approached by Company and was interviewed before Oct 2022. There were 2 interview rounds.
Extra Dose bridge has additional support structures while cable stay bridge uses cables to support the bridge deck.
Extra Dose bridge has additional piers or columns for support.
Cable stay bridge uses cables attached to towers to support the bridge deck.
Extra Dose bridge is more common for shorter spans while cable stay bridge is used for longer spans.
Cable stay bridges have a more modern and sleek appearance compared t
Types of contracts include express, implied, unilateral, bilateral, and voidable contracts.
Express contract: Clearly stated terms and conditions, either written or verbal.
Implied contract: Terms inferred from the actions or conduct of the parties involved.
Unilateral contract: One party makes a promise in exchange for the performance of an act by the other party.
Bilateral contract: Both parties exchange promises to perf...
COS stands for Cost of Sales, which refers to the direct costs associated with producing goods or services.
COS includes costs such as raw materials, labor, and manufacturing overhead.
Stages involved in COS include identifying direct costs, calculating total COS, and analyzing COS to determine profitability.
Example: If a company sells a product for $100 and the direct costs to produce that product are $60, the COS would...
EOT stands for End of Transmission. It is a signal used to indicate the end of a transmission of data.
EOT is commonly used in telecommunications and computer networking to signify the end of a message or data transmission.
It is represented by the ASCII control character with the code 04.
EOT is often used in conjunction with other control characters like SOH (Start of Header) and ETX (End of Text) in communication proto...
A claim is a request made by an individual or entity for payment of benefits or services covered by an insurance policy.
A claim is typically submitted by a policyholder or healthcare provider to an insurance company.
It includes details such as the services provided, dates of service, and the amount billed.
The insurance company reviews the claim to determine if it meets the policy's coverage criteria.
Once approved, the ...
RFI stands for Request for Information, which is a formal process used to gather information from potential suppliers or vendors.
RFI is typically used in procurement processes to collect information about products, services, or suppliers before making a decision.
It helps organizations to understand the capabilities, pricing, and other details of potential suppliers.
RFIs are often used as a preliminary step before issui...
Estimates are calculated predictions of the cost, time, and resources required for a project.
Gather all relevant information and data related to the project
Break down the project into smaller tasks or components
Use historical data or industry benchmarks to estimate the time and cost for each task
Consider any potential risks or uncertainties that may impact the estimates
Document the estimates and communicate them clearl
based on 3 interviews
2 Interview rounds
based on 24 reviews
Rating in categories
Assistant Manager
70
salaries
| ₹6.4 L/yr - ₹10.8 L/yr |
Assistant Engineer
47
salaries
| ₹2.1 L/yr - ₹4.2 L/yr |
Senior Engineer
41
salaries
| ₹4.8 L/yr - ₹8 L/yr |
Deputy Manager
37
salaries
| ₹8.5 L/yr - ₹12 L/yr |
Engineer
18
salaries
| ₹3.1 L/yr - ₹5.1 L/yr |
L&T Construction
Simplex Infrastructures
AECOM
L&T Energy Hydrocarbon