i
H.G. Infra Engineering
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Company Website and was interviewed before Nov 2022. There were 2 interview rounds.
I applied via Referral and was interviewed in Oct 2024. There were 2 interview rounds.
Contract Labour Act regulates the employment of contract labour in certain establishments.
Regulates employment of contract labour in establishments with 20 or more workers
Requires registration of principal employer and contractor
Ensures welfare and working conditions of contract labour
Prohibits employment of contract labour in certain types of work
Establishes penalties for non-compliance
EPF Act refers to the Employees' Provident Fund Act, a social security legislation in India.
EPF Act is a legislation that provides retirement benefits to employees in India.
It requires both the employer and employee to contribute a certain percentage of the employee's salary to the provident fund.
The EPF Act also covers issues related to pension and insurance benefits for employees.
It is managed by the Employees' Provi
Common civil code is a uniform set of laws applicable to all citizens regardless of their religion or personal beliefs.
Common civil code aims to provide equal rights and opportunities to all citizens.
It is intended to promote gender equality and social justice.
Examples include countries like France and Portugal which have implemented common civil codes.
In India, the debate around implementing a common civil code has be
Expected CTC is negotiable based on the candidate's experience, skills, and market standards.
Expected CTC depends on the candidate's level of experience and skills.
Market standards and industry norms also play a role in determining the expected CTC.
Negotiation is possible based on the candidate's value proposition to the organization.
I applied via Referral and was interviewed in Apr 2024. There were 2 interview rounds.
H.G. Infra Engineering interview questions for popular designations
Get interview-ready with Top H.G. Infra Engineering Interview Questions
I applied via LinkedIn and was interviewed in Dec 2023. There were 2 interview rounds.
An engine works by converting fuel into mechanical energy through combustion.
Fuel is mixed with air and ignited in the combustion chamber
The resulting explosion pushes pistons up and down
Pistons are connected to a crankshaft, which converts the up and down motion into rotational motion
The rotational motion is then used to power the vehicle or machinery
The gear ratio between the crankshaft and camshaft determines the timing of valve opening and closing in an engine.
The gear ratio is typically determined by the number of teeth on the gears connected to the crankshaft and camshaft.
A higher gear ratio means the camshaft will rotate faster than the crankshaft, resulting in different valve timing.
The gear ratio plays a crucial role in the performance and efficiency of an ...
There are various engine models used in excavators depending on the manufacturer and size of the machine.
Different excavator manufacturers use different engine models such as Caterpillar, Komatsu, Volvo, and Hitachi.
Engine models can vary based on the size and power requirements of the excavator.
Common engine models used in excavators include Caterpillar C-Series, Komatsu SAA6D107E, Volvo D6H, and Hitachi Hino J05E.
The fuel consumption of a 1800-3 asphalt paver can vary depending on factors such as operating conditions and maintenance.
Fuel consumption can be affected by the type of work being done (e.g. paving a new road vs. resurfacing an existing road)
Proper maintenance of the paver, such as regular engine tune-ups and clean air filters, can help improve fuel efficiency
Monitoring fuel usage and adjusting operating practices, su...
The fuel consumption of a 500 kVA DG set depends on various factors such as load, efficiency, and type of fuel used.
Fuel consumption of a 500 kVA DG set can range from 130-150 liters per hour depending on the load and efficiency.
Factors such as the type of fuel used (diesel, natural gas, etc.) can also impact fuel consumption.
Regular maintenance and tuning of the DG set can help optimize fuel consumption and efficiency
H3N plant productivity can be improved through efficient resource allocation and process optimization.
Implementing lean manufacturing principles to reduce waste and improve efficiency
Investing in automation technology to streamline production processes
Regularly monitoring and analyzing key performance indicators to identify areas for improvement
Providing training and development opportunities for employees to enhance s
The parts of an H3N plant include reactors, distillation columns, heat exchangers, pumps, valves, and control systems.
Reactors
Distillation columns
Heat exchangers
Pumps
Valves
Control systems
Maintenance cost of equipment is a crucial factor in ensuring efficient operations and minimizing downtime.
Regular maintenance schedules can help prevent costly breakdowns and extend the lifespan of equipment.
Investing in high-quality equipment upfront can reduce long-term maintenance costs.
Tracking maintenance expenses and analyzing trends can help identify areas for improvement and cost-saving opportunities.
The main cause of insulation in asphalt paver is typically due to a buildup of material on the screed plate.
Buildup of material on the screed plate can cause insulation in asphalt paver
Improper maintenance and cleaning of the paver can lead to insulation issues
Incorrect adjustment of the screed plate can also contribute to insulation problems
Scheduled maintenance of equipments is crucial for ensuring optimal performance and longevity.
Regularly inspect and clean equipment to prevent breakdowns
Follow manufacturer's recommended maintenance schedule
Keep detailed records of maintenance activities
Train staff on proper maintenance procedures
Address any issues promptly to avoid costly repairs
The productivity of a grader can be measured by the amount of work completed in a given time period.
Productivity can be measured by the number of products graded per hour or per day.
Efficiency of the grader in completing tasks accurately and timely is also important.
Utilization of resources such as manpower and machinery can impact productivity.
Continuous improvement strategies can help increase the productivity of the
The productivity of an excavator can be measured by factors such as fuel efficiency, cycle time, and maintenance costs.
Fuel efficiency: Ensure the excavator is properly maintained and operated to maximize fuel efficiency.
Cycle time: Optimize the workflow and minimize idle time to increase productivity.
Maintenance costs: Regular maintenance and timely repairs can help reduce downtime and increase productivity.
Utilizatio...
I applied via Walk-in
Address the issue through communication, education, and disciplinary actions if necessary.
Start by having a conversation with the employee to understand the reasons behind the violations.
Provide additional training and education on safety protocols to ensure the employee fully understands the importance.
Implement regular safety meetings or toolbox talks to reinforce the importance of following protocols.
If the violatio...
I applied via Approached by Company and was interviewed in Mar 2024. There were 3 interview rounds.
Top trending discussions
Interview experience
based on 911 reviews
Rating in categories
Assistant Manager
118
salaries
| ₹4.2 L/yr - ₹13.2 L/yr |
Senior Engineer
87
salaries
| ₹4.1 L/yr - ₹8.7 L/yr |
Assistant Engineer
76
salaries
| ₹2.4 L/yr - ₹4.5 L/yr |
Engineer
66
salaries
| ₹2.5 L/yr - ₹7.5 L/yr |
Structural Engineer
64
salaries
| ₹2.6 L/yr - ₹5.4 L/yr |
Ashoka Buildcon
IRB Infrastructure
Nagarjuna Construction Company
PNC Infratech