H.G. Infra Engineering QC Engineer Interview Questions, Process, and Tips

Updated 21 Jun 2024

Top H.G. Infra Engineering QC Engineer Interview Questions and Answers

H.G. Infra Engineering QC Engineer Interview Experiences

2 interviews found

QC Engineer Interview Questions & Answers

user image Anonymous

posted on 29 Nov 2023

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
6-8 weeks
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Mix Design of DLC &PQC
  • Ans. 

    DLC (Dry Lean Concrete) and PQC (Pavement Quality Concrete) mix designs are crucial for ensuring durability and strength of roads.

    • DLC mix design typically includes a low water-cement ratio to achieve high strength and durability.

    • PQC mix design focuses on achieving a smooth surface finish and good skid resistance.

    • Proper selection of aggregates, cement, and admixtures is essential for both DLC and PQC mix designs.

    • Quality...

  • Answered by AI
  • Q2. Rate of Loading of Flexural testing Machine for PQC Beam
  • Ans. 

    The rate of loading for flexural testing machine for PQC beam should be as per relevant standards and specifications.

    • Rate of loading should be as per relevant standards such as ASTM C78/C78M for flexural testing of concrete beams

    • Typically, the rate of loading is around 0.05 to 0.1 MPa per second for PQC beams

    • The rate of loading should be uniform and controlled throughout the test to ensure accurate results

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. About Salary and site location

QC Engineer Interview Questions & Answers

user image Anonymous

posted on 21 Jun 2024

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Is code for CBR
  • Ans. 

    CBR stands for Case-Based Reasoning, a problem-solving method that uses past cases to solve new problems.

    • CBR is a problem-solving technique where new problems are solved by recalling and adapting solutions from similar past cases.

    • It involves storing and retrieving cases from a case library, and using them to solve new problems.

    • CBR is commonly used in fields like artificial intelligence, healthcare, and customer service...

  • Answered by AI
  • Q2. Is 2720 part 8
  • Ans. 

    No, 2720 is not part 8.

    • 2720 is not part 8, it is a separate entity.

    • Part 8 is unrelated to 2720 in the context of QC engineering.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Smooth Process

QC Engineer Interview Questions Asked at Other Companies

Q1. What is heat exchanger? What is pressure vessel? Function of he/p ... read more
asked in Rds Project
Q2. 2.Generally, what type of zone of sand are used in construction w ... read more
asked in Rds Project
Q3. 1. What is the M.D.D. and O.M.C. of W.M.M. and G.S.B.
Q4. What is the maximum Liquid Limit & Plasticity Index allowed i ... read more
Q5. What IS code is followed for checking of lamination of plate?

Interview questions from similar companies

I applied via Walk-in and was interviewed in Feb 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. When you take the interview and walk to company me.

Interview Preparation Tips

Interview preparation tips for other job seekers - Thank you for this position is occupy me and also happy to work with you company. I will really show my capabilities and ability and hard work and give to above company name

I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Load distribution under rigid and flexible footings,water tank design, steel foundation design
  • Q2. Mix design of concrete, btech project
  • Ans. 

    Mix design of concrete and BTech project

    • Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete

    • Factors like strength, workability, durability, and cost are considered while designing the mix

    • BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design

    • Examples of BTech projects...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be well prepared with basics and if you are already experienced, be prepared with site knowledge

Interview Questionnaire 

3 Questions

  • Q1. How many time u take any update shuttering system?
  • Ans. 

    The question is unclear and lacks context.

    • Please provide more information about the 'update shuttering system'.

    • Specify the time frame for the updates.

    • Clarify the purpose or objective of the updates.

    • Provide any relevant examples or scenarios.

  • Answered by AI
  • Q2. Why u want to work as a execution engineer? Why not any special team such as formwork team,or quality team?
  • Ans. 

    I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.

    • As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.

    • I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.

    • While working on a formwork or quality team would be valuable experi...

  • Answered by AI
  • Q3. As contractor farm Engineer in RCC which is most important? 1) Reinforcements 2)Formwork 3)Concrete And why?
  • Ans. 

    Concrete is the most important as it provides the strength and durability to the structure.

    • Concrete is the backbone of any RCC structure.

    • It provides the strength and durability to the structure.

    • Reinforcements and formwork are important too, but without concrete, they are useless.

    • Proper mix design and curing of concrete are crucial for the longevity of the structure.

  • Answered by AI

I applied via Naukri.com and was interviewed before Aug 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. How to start a new project ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Just say what are you doing in the past and what you can do.

I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. About my previous experience, and my scope of work?
  • Q2. Areas of strengths and areas need to develop

Interview Preparation Tips

Interview preparation tips for other job seekers - The interview consisting of two rounds, first is about my personal details, which is intervied by Hr person. the second round is technical one, which was taken by Project director of the particular project. So i advice everyone be confident what you answering them, all the questions were asked about my experience part, and the knowledge what i have gained during the work apart from my education life. They also check all my documents. After completion of my interview and after 1 month, i got the offer letter of this company. Now iam so happy for this achievement. I hope all of the others who were attending for the interviews, hope you all get placed.

Thanks and Regards
Rahman

I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What is the most challenging situation you have been through in your career?

Interview Preparation Tips

Interview preparation tips for other job seekers - To ace an interview you need to be a good listener as much as a good speaker. Try to listen and understand what the interviewer is asking and then reply. Never be in a hurry to answer, take time. If you did not understand what interviewer is asking simply ask him to repeat, pls don't presume anything and answer anything that comes to your mind. Most importantly never fake in an interview just try to be your best...

I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. About the background

Interview Preparation Tips

Interview preparation tips for other job seekers - Please have good job knowledge

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

H.G. Infra Engineering Interview FAQs

How many rounds are there in H.G. Infra Engineering QC Engineer interview?
H.G. Infra Engineering interview process usually has 2 rounds. The most common rounds in the H.G. Infra Engineering interview process are Technical, Resume Shortlist and HR.
What are the top questions asked in H.G. Infra Engineering QC Engineer interview?

Some of the top questions asked at the H.G. Infra Engineering QC Engineer interview -

  1. Rate of Loading of Flexural testing Machine for PQC B...read more
  2. Is 2720 par...read more
  3. Mix Design of DLC &...read more

Tell us how to improve this page.

H.G. Infra Engineering QC Engineer Interview Process

based on 2 interviews

Interview experience

4
  
Good
View more
H.G. Infra Engineering QC Engineer Salary
based on 8 salaries
₹4 L/yr - ₹6 L/yr
18% more than the average QC Engineer Salary in India
View more details

H.G. Infra Engineering QC Engineer Reviews and Ratings

based on 6 reviews

3.0/5

Rating in categories

3.1

Skill development

3.0

Work-life balance

3.0

Salary

2.9

Job security

3.0

Company culture

2.8

Promotions

3.0

Work satisfaction

Explore 6 Reviews and Ratings
Assistant Manager
134 salaries
unlock blur

₹4.2 L/yr - ₹13.2 L/yr

Senior Engineer
90 salaries
unlock blur

₹4.1 L/yr - ₹9.8 L/yr

Assistant Engineer
78 salaries
unlock blur

₹2.9 L/yr - ₹4.6 L/yr

Engineer
73 salaries
unlock blur

₹2.5 L/yr - ₹7.5 L/yr

Structural Engineer
66 salaries
unlock blur

₹2.6 L/yr - ₹5.4 L/yr

Explore more salaries
Compare H.G. Infra Engineering with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.4
Compare

ITD Cementation India

4.3
Compare

Ashoka Buildcon

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview