BIL Infratech QC Engineer Interview Questions and Answers

Updated 24 Oct 2018

BIL Infratech QC Engineer Interview Experiences

1 interview found

QC Engineer Interview Questions & Answers

user image Nilanjan Jana

posted on 24 Oct 2018

I applied via Referral and was interviewed before Oct 2017. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. What IS code is followed for testing of fasteners?
  • Ans. 

    The IS code followed for testing of fasteners is IS 1608:2005.

    • IS 1608:2005 is the Indian Standard code for testing of fasteners.

    • It provides guidelines for testing the mechanical properties of fasteners such as bolts, screws, nuts, and washers.

    • The code covers various tests including tensile strength, proof load, hardness, torque, and fatigue strength.

    • These tests ensure that fasteners meet the required quality standards ...

  • Answered by AI
  • Q2. What IS code is followed for checking of lamination of plate?
  • Ans. 

    The IS code followed for checking lamination of plate is IS 2062:2011.

    • IS 2062:2011 is the Indian Standard code for hot-rolled medium and high tensile structural steel.

    • It specifies the requirements for steel plates used in general structural purposes.

    • The code includes guidelines for checking lamination defects in the plates.

    • Various non-destructive testing methods like ultrasonic testing, magnetic particle testing, etc.,...

  • Answered by AI
  • Q3. What is carbon equivalent (CE) ?
  • Ans. 

    Carbon equivalent (CE) is a measure used in metallurgy to assess the weldability and hardenability of steel.

    • Carbon equivalent is calculated based on the carbon content and other alloying elements in the steel.

    • It helps determine the potential for cracking and the heat treatment required for the steel.

    • A higher carbon equivalent indicates a higher risk of cracking during welding.

    • CE values are commonly used in the oil and ...

  • Answered by AI

Interview Preparation Tips

Round: Resume Shortlist
Experience: My job criteria was matched for their seeking of a new candidate for a new project.

General Tips: Technical interview was based on my experience that I gather.

HR interview was based on my salary package and etc.
Skills: Communication, Body Language, Problem Solving, Leadership, Presentation Skills, Decision Making Skills
Duration: 1-4 weeks

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
6-8 weeks
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Mix Design of DLC &PQC
  • Ans. 

    DLC (Dry Lean Concrete) and PQC (Pavement Quality Concrete) mix designs are crucial for ensuring durability and strength of roads.

    • DLC mix design typically includes a low water-cement ratio to achieve high strength and durability.

    • PQC mix design focuses on achieving a smooth surface finish and good skid resistance.

    • Proper selection of aggregates, cement, and admixtures is essential for both DLC and PQC mix designs.

    • Quality...

  • Answered by AI
  • Q2. Rate of Loading of Flexural testing Machine for PQC Beam
  • Ans. 

    The rate of loading for flexural testing machine for PQC beam should be as per relevant standards and specifications.

    • Rate of loading should be as per relevant standards such as ASTM C78/C78M for flexural testing of concrete beams

    • Typically, the rate of loading is around 0.05 to 0.1 MPa per second for PQC beams

    • The rate of loading should be uniform and controlled throughout the test to ensure accurate results

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. About Salary and site location
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Soil & concrete
  • Q2. What is the 20mm nominal size
  • Ans. 

    The 20mm nominal size refers to the designated size of a component or object.

    • Nominal size is a standard size used for identification and classification purposes.

    • In this case, the 20mm nominal size indicates that the component or object is intended to have a size of 20mm.

    • It is important to note that the actual size may vary slightly due to manufacturing tolerances.

    • The nominal size helps in ensuring compatibility and int...

  • Answered by AI
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Previous experience
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. 1. What is Concrete Mix Design?
  • Ans. 

    Concrete mix design is the process of determining the proportions of cement, water, aggregates, and admixtures to produce concrete with desired properties.

    • Concrete mix design involves selecting the appropriate materials and determining their proportions to achieve the desired strength, workability, and durability of the concrete.

    • Factors such as the type of cement, aggregate gradation, water-cement ratio, and admixtures...

  • Answered by AI
  • Q2. What is the maximum Liquid Limit & Plasticity Index allowed in earth work in embankment/subgrade soil ?
  • Ans. 

    Liquid limit should not exceed 40% and Plasticity Index should not exceed 20% for earth work in embankment/subgrade soil.

    • Liquid limit and Plasticity Index are important parameters to determine the suitability of soil for construction purposes.

    • Higher values of Liquid limit and Plasticity Index indicate that the soil is more susceptible to deformation and settlement.

    • For earth work in embankment/subgrade soil, the maximum...

  • Answered by AI

Interview Questionnaire 

1 Question

  • Q1. WHAT YOU WILL DO , IF YOU GET BATTER OPPORTUNITY THAN OUR COMPANY AFTER JOINING OUR COMPANY.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Not Selected

I applied via Company Website and was interviewed in Nov 2024. There were 2 interview rounds.

Round 1 - Assignment 

Condition monitoring engineer

Round 2 - Technical 

(6 Questions)

  • Q1. Condition monitoring engineer vibration analyst
  • Q2. Machinery health vibration analyst
  • Q3. Vibration analysis service
  • Q4. Balancing and alignment equipment health according
  • Q5. Mechanical maintenance
  • Q6. Rotrey equipment analysis report
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(7 Questions)

  • Q1. What is diesel generator, transformer & HVAC
  • Ans. 

    Diesel generator is a backup power source using diesel fuel, transformer is a device that transfers electrical energy between circuits, and HVAC is a system for heating, ventilation, and air conditioning.

    • Diesel generator: provides backup power using diesel fuel, commonly used in areas with frequent power outages

    • Transformer: transfers electrical energy between circuits, stepping up or down voltage levels as needed

    • HVAC: ...

  • Answered by AI
  • Q2. Operation & maintenance LT pannel & HT pannel
  • Q3. What is fire fighting system
  • Ans. 

    A fire fighting system is a set of equipment and procedures designed to detect, control, and extinguish fires in a building or area.

    • Includes fire alarms, sprinkler systems, fire extinguishers, and fire hoses

    • May also involve fire suppression systems like foam or gas

    • Designed to protect lives and property in the event of a fire

    • Regular maintenance and testing are crucial to ensure effectiveness

  • Answered by AI
  • Q4. What is DM plant
  • Ans. 

    DM plant stands for Demineralization plant, used to remove minerals and salts from water.

    • DM plant is used in industries to produce demineralized water for various processes.

    • It consists of ion exchange resins to remove minerals like calcium, magnesium, and salts from water.

    • The process involves passing water through cation and anion exchange columns to remove ions.

    • DM plant is essential in power plants, pharmaceutical ind...

  • Answered by AI
  • Q5. What is acb,vcb,mccb, mcb
  • Ans. 

    ACB, VCB, MCCB, MCB are types of circuit breakers used in electrical systems.

    • ACB stands for Air Circuit Breaker, used for high voltage applications.

    • VCB stands for Vacuum Circuit Breaker, used for medium voltage applications.

    • MCCB stands for Molded Case Circuit Breaker, used for low voltage applications.

    • MCB stands for Miniature Circuit Breaker, used for residential and commercial applications.

  • Answered by AI
  • Q6. Fire fighting system
  • Q7. ACB,VCB,MCCB,MCB,OCB etc

Interview Preparation Tips

Topics to prepare for Tata Projects Electrical Engineer interview:
  • Electrical department
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the mechanism?
  • Ans. 

    The mechanism refers to the physical or mechanical system that performs a specific function or task.

    • Mechanisms are often made up of various components such as gears, levers, pulleys, and linkages.

    • They are designed to convert input forces and motion into desired output forces and motion.

    • Examples include a car engine, a door lock, a bicycle chain, and a robotic arm.

  • Answered by AI
  • Q2. What is the structure of an assembly?
  • Ans. 

    An assembly is a collection of parts or components put together to form a complete structure or machine.

    • An assembly typically consists of multiple parts or components that are designed to fit together in a specific way.

    • Each part in an assembly has a specific function and contributes to the overall functionality of the structure.

    • Assemblies can range from simple structures like a chair to complex machines like a car or a...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for L&T Construction Mechanical Engineer interview:
  • Assembly, erection, mechanism
Interview preparation tips for other job seekers - Assembly, structure drawing
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

C6h12o6 what's this is

Round 2 - Technical 

(2 Questions)

  • Q1. Root 3 what is this
  • Q2. 66 conversation for Roman number
Round 3 - Technical 

(2 Questions)

  • Q1. Auxin what is theis
  • Ans. 

    Auxin is a plant hormone that regulates growth and development.

    • Auxin is responsible for cell elongation and division in plants.

    • It plays a role in phototropism, gravitropism, and apical dominance.

    • Examples of auxin include indole-3-acetic acid (IAA) and synthetic auxins like 2,4-D.

  • Answered by AI
  • Q2. Iaa what is this

Interview Preparation Tips

Interview preparation tips for other job seekers - Hi

BIL Infratech Interview FAQs

What are the top questions asked in BIL Infratech QC Engineer interview?

Some of the top questions asked at the BIL Infratech QC Engineer interview -

  1. What IS code is followed for checking of lamination of pla...read more
  2. What IS code is followed for testing of fastene...read more
  3. What is carbon equivalent (CE...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 BIL Infratech interview
Referral
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.
Assistant Manager
9 salaries
unlock blur

₹8.1 L/yr - ₹12.4 L/yr

Senior Engineer
9 salaries
unlock blur

₹5.2 L/yr - ₹8 L/yr

Assistant Engineer
7 salaries
unlock blur

₹2.8 L/yr - ₹4.8 L/yr

Store Officer
6 salaries
unlock blur

₹3.6 L/yr - ₹4.5 L/yr

Safety Officer
6 salaries
unlock blur

₹1.8 L/yr - ₹5.1 L/yr

Explore more salaries
Compare BIL Infratech with

Larsen & Toubro Limited

4.0
Compare

L&T Construction

4.0
Compare

Tata Projects

4.3
Compare

Kalpataru Projects International

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview