Premium Employer

i

This company page is being actively managed by Tata Projects Team. If you also belong to the team, you can get access from here

Tata Projects

Compare button icon Compare button icon Compare
4.3

based on 4.9k Reviews

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Tata Projects Electrical Engineer Interview Questions, Process, and Tips

Updated 18 Sep 2024

Top Tata Projects Electrical Engineer Interview Questions and Answers

Tata Projects Electrical Engineer Interview Experiences

3 interviews found

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(7 Questions)

  • Q1. What is diesel generator, transformer & HVAC
  • Ans. 

    Diesel generator is a backup power source using diesel fuel, transformer is a device that transfers electrical energy between circuits, and HVAC is a system for heating, ventilation, and air conditioning.

    • Diesel generator: provides backup power using diesel fuel, commonly used in areas with frequent power outages

    • Transformer: transfers electrical energy between circuits, stepping up or down voltage levels as needed

    • HVAC: ...

  • Answered by AI
  • Q2. Operation & maintenance LT pannel & HT pannel
  • Q3. What is fire fighting system
  • Ans. 

    A fire fighting system is a set of equipment and procedures designed to detect, control, and extinguish fires in a building or area.

    • Includes fire alarms, sprinkler systems, fire extinguishers, and fire hoses

    • May also involve fire suppression systems like foam or gas

    • Designed to protect lives and property in the event of a fire

    • Regular maintenance and testing are crucial to ensure effectiveness

  • Answered by AI
  • Q4. What is DM plant
  • Ans. 

    DM plant stands for Demineralization plant, used to remove minerals and salts from water.

    • DM plant is used in industries to produce demineralized water for various processes.

    • It consists of ion exchange resins to remove minerals like calcium, magnesium, and salts from water.

    • The process involves passing water through cation and anion exchange columns to remove ions.

    • DM plant is essential in power plants, pharmaceutical ind...

  • Answered by AI
  • Q5. What is acb,vcb,mccb, mcb
  • Ans. 

    ACB, VCB, MCCB, MCB are types of circuit breakers used in electrical systems.

    • ACB stands for Air Circuit Breaker, used for high voltage applications.

    • VCB stands for Vacuum Circuit Breaker, used for medium voltage applications.

    • MCCB stands for Molded Case Circuit Breaker, used for low voltage applications.

    • MCB stands for Miniature Circuit Breaker, used for residential and commercial applications.

  • Answered by AI
  • Q6. Fire fighting system
  • Q7. ACB,VCB,MCCB,MCB,OCB etc

Interview Preparation Tips

Topics to prepare for Tata Projects Electrical Engineer interview:
  • Electrical department
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Electrical maintenance kese kar te ho

Electrical Engineer Interview Questions Asked at Other Companies

Q1. What is the difference between Switch gear & Circuit Breakers ... read more
Q2. What is ATS, transformer maintenance procedure, protection of tra ... read more
asked in Tata Steel
Q3. 1.what is composite error and ratio error in current transformer?
Q4. 1. Power factor of transformer 2. types of DC machine 3. Working ... read more
Q5. How many types of transformer according to voltage transfer
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Feb 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Ht motor LT panal and transformer distribution
  • Q2. Electrical relative question
Round 3 - Technical 

(1 Question)

  • Q1. Motor and panal mcc and transformer
Round 4 - Technical 

(1 Question)

  • Q1. Fabrication and ailment erection complite
Round 5 - Technical 

(1 Question)

  • Q1. Cable Laying and termination

Interview Preparation Tips

Interview preparation tips for other job seekers - I'm a cement project Engg im am Incharge for WHRS power plants.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Oct 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Motor type, Pump lowering, ESR piping etc.
  • Q2. Solar Specification
Round 2 - HR 

(2 Questions)

  • Q1. Notice period is negotiable
  • Q2. 30%hike on current ctc

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep calm, to be honest if you know about whats they ask explain them if not then leave and say sorry.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

C6h12o6 what's this is

Round 2 - Technical 

(2 Questions)

  • Q1. Root 3 what is this
  • Q2. 66 conversation for Roman number
Round 3 - Technical 

(2 Questions)

  • Q1. Auxin what is theis
  • Ans. 

    Auxin is a plant hormone that regulates growth and development.

    • Auxin is responsible for cell elongation and division in plants.

    • It plays a role in phototropism, gravitropism, and apical dominance.

    • Examples of auxin include indole-3-acetic acid (IAA) and synthetic auxins like 2,4-D.

  • Answered by AI
  • Q2. Iaa what is this

Interview Preparation Tips

Interview preparation tips for other job seekers - Hi
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Errection of 11 kv line and detail about material in 1 km line?
  • Ans. 

    The erection of an 11 kV line involves setting up a power line infrastructure for transmitting electricity over a distance of 1 km.

    • Materials required include conductors (such as aluminum or copper), insulators, poles, transformers, and hardware fittings.

    • The conductors are used to carry the electricity from one point to another, while insulators prevent the flow of electricity to the ground.

    • Poles are used to support the...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Privious salay?

Interview Preparation Tips

Interview preparation tips for other job seekers - Go free mind
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before May 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Regarding to my previous job
  • Q2. Regarding LT panel and HT panel, motors and maintenance.
Round 2 - Technical 

(1 Question)

  • Q1. Technical questions
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. What is ATS, transformer maintenance procedure, protection of transformer, maintenance procedure of motor, protection of motor, knowledge about SAP
  • Ans. 

    ATS stands for Automatic Transfer Switch. It is used to transfer power supply between two sources. Transformer and motor maintenance procedures and protection methods are essential for their efficient operation. SAP is a software used for enterprise resource planning.

    • ATS is used to automatically switch power supply between two sources, ensuring uninterrupted power supply.

    • Transformer maintenance involves regular inspect...

  • Answered by AI
  • Q2. Knowledge about DG set, and spare material
  • Q3. Rating of HT motor and FLC of HT motor
  • Ans. 

    HT motor rating is the maximum power it can handle and FLC is the current it draws at full load.

    • HT motor rating is expressed in kilowatts (kW) or megawatts (MW).

    • FLC of HT motor is the full load current it draws at rated voltage and frequency.

    • FLC is expressed in amperes (A) and varies depending on the motor's power rating and efficiency.

    • For example, a 1 MW HT motor may have a FLC of 1000 A at 11 kV.

    • The rating and FLC of...

  • Answered by AI
  • Q4. Plant EHT system and single line diagram of plants.
  • Ans. 

    Plant EHT system and single line diagram of plants.

    • EHT system refers to Extra High Tension system used in power plants

    • Single line diagram shows the electrical connections between different components

    • It is important to have a clear and accurate diagram for safety and maintenance purposes

  • Answered by AI
  • Q5. Knowledge about HT and LT breaker.

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of electrical engineer, standard of electrical

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I was interviewed before Feb 2023.

Round 1 - Technical 

(1 Question)

  • Q1. What are the major parts in power transformer?
  • Ans. 

    The major parts in a power transformer include the core, windings, insulation, cooling system, and tap changer.

    • Core: Provides a path for magnetic flux and is usually made of laminated steel sheets.

    • Windings: Consist of primary and secondary coils that transfer electrical energy.

    • Insulation: Prevents electrical leakage and ensures safety.

    • Cooling System: Keeps the transformer within operating temperature limits, commonly u...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. What do you want to switch ?
  • Ans. 

    I want to switch electrical circuits and devices.

    • Switching electrical circuits to control the flow of electricity.

    • Switching electrical devices on or off.

    • Switching between different power sources.

    • Switching between different modes or settings of electrical equipment.

    • Switching between different electrical connections or configurations.

  • Answered by AI

I applied via Naukri.com and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. MEP Electrical Engineer with over 11 years experience.
  • Q2. If any requirment? Then will contact me

Interview Preparation Tips

Interview preparation tips for other job seekers - I have good knowledge of MEP Project.

Tata Projects Interview FAQs

How many rounds are there in Tata Projects Electrical Engineer interview?
Tata Projects interview process usually has 2-3 rounds. The most common rounds in the Tata Projects interview process are Technical and Resume Shortlist.
How to prepare for Tata Projects Electrical Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Tata Projects. The most common topics and skills that interviewers at Tata Projects expect are Electricals, Electrical Engineering, Equipment Maintenance, Plant Machinery and Electrical Maintenance.
What are the top questions asked in Tata Projects Electrical Engineer interview?

Some of the top questions asked at the Tata Projects Electrical Engineer interview -

  1. What is diesel generator, transformer & H...read more
  2. What is fire fighting sys...read more
  3. What is acb,vcb,mccb, ...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Tata Projects interview
WalkIn
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.
Join Tata Projects Simplify. Create.
Tata Projects Electrical Engineer Salary
based on 201 salaries
₹1 L/yr - ₹8 L/yr
At par with the average Electrical Engineer Salary in India
View more details

Tata Projects Electrical Engineer Reviews and Ratings

based on 36 reviews

4.2/5

Rating in categories

3.8

Skill development

3.9

Work-Life balance

3.7

Salary & Benefits

3.8

Job Security

3.9

Company culture

3.5

Promotions/Appraisal

3.7

Work Satisfaction

Explore 36 Reviews and Ratings
Deputy Manager
1.1k salaries
unlock blur

₹5.7 L/yr - ₹17 L/yr

Assistant Manager
706 salaries
unlock blur

₹5 L/yr - ₹14.8 L/yr

Manager
387 salaries
unlock blur

₹8 L/yr - ₹24.1 L/yr

Senior Engineer
373 salaries
unlock blur

₹3.5 L/yr - ₹13 L/yr

Senior Manager
315 salaries
unlock blur

₹10.4 L/yr - ₹32.5 L/yr

Explore more salaries
Compare Tata Projects with

Larsen & Toubro Limited

4.0
Compare

Reliance Infrastructure

4.1
Compare

GMR Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview