i
Saint-Gobain
Filter interviews by
I applied via Referral and was interviewed before Jan 2021. There were 5 interview rounds.
Glass is a solid, transparent material made by heating a mixture of silica and other materials.
Glass is a non-crystalline, amorphous solid
It is made by heating a mixture of silica, soda ash, and lime
It can be molded into various shapes and sizes
It is used in windows, mirrors, lenses, and containers
Different types of glass include tempered, laminated, and stained glass
Graphene is a thin layer of pure carbon arranged in a hexagonal lattice.
It is the thinnest material known to man
It is a good conductor of electricity and heat
It is incredibly strong and flexible
It has potential applications in electronics, energy, and medicine
Top trending discussions
posted on 1 Dec 2021
I applied via Company Website and was interviewed before Dec 2020. There were 3 interview rounds.
Micro planning of construction site involves detailed planning and scheduling of activities to ensure efficient and timely completion of the project.
It involves breaking down the project into smaller tasks and assigning timelines for each task.
It includes identifying the resources required for each task and ensuring their availability.
Micro planning also involves monitoring the progress of each task and making necessar...
The unit weight of 12mm bar depends on the type of steel used.
The unit weight of 12mm bar made of mild steel is 0.89 kg/m
For high tensile steel, the unit weight of 12mm bar is 1.06 kg/m
The density of steel used in the bar also affects the unit weight
posted on 4 Jan 2021
I applied via Naukri.com and was interviewed in Jul 2020. There were 3 interview rounds.
I applied via Company Website and was interviewed in Jan 2021. There were 3 interview rounds.
Lapping of beam is done by grinding the surface of the beam to achieve a smooth and flat finish.
The beam is placed on a lapping machine with an abrasive surface.
The machine moves the beam back and forth while the abrasive surface grinds away any imperfections.
The process is repeated with finer and finer abrasives until the desired finish is achieved.
Lapping can improve the strength and durability of the beam.
It is comm...
The number of cube samples taken for 60 cum of concrete depends on the specifications and requirements of the project.
The number of cube samples may vary depending on the project specifications and requirements.
Typically, 3 to 5 cube samples are taken for every 100 cubic meters of concrete.
The cube samples are taken to test the compressive strength of the concrete.
The number of cube samples may also depend on the locat...
posted on 2 Sep 2021
I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.
posted on 8 Jul 2017
I appeared for an interview before Jul 2016.
I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Nov 2019. There were 3 interview rounds.
based on 9 reviews
Rating in categories
Team Member
524
salaries
| ₹1.4 L/yr - ₹8.3 L/yr |
Key Account Manager
176
salaries
| ₹5.4 L/yr - ₹18 L/yr |
Software Engineer
172
salaries
| ₹3 L/yr - ₹11.4 L/yr |
Senior Software Engineer
168
salaries
| ₹6.5 L/yr - ₹24.1 L/yr |
Production Engineer
155
salaries
| ₹1 L/yr - ₹11 L/yr |
Tata Projects
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company