Upload Button Icon Add office photos
Premium Employer

i

This company page is being actively managed by Saint-Gobain Team. If you also belong to the team, you can get access from here

Saint-Gobain Verified Tick

Compare button icon Compare button icon Compare
4.0

based on 1.5k Reviews

Filter interviews by

Saint-Gobain Senior Engineer Interview Questions and Answers

Updated 13 Jan 2022

Saint-Gobain Senior Engineer Interview Experiences

1 interview found

I applied via Referral and was interviewed before Jan 2021. There were 5 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. What do you want to do in 5 years
  • Q2. What is glass
  • Ans. 

    Glass is a solid, transparent material made by heating a mixture of silica and other materials.

    • Glass is a non-crystalline, amorphous solid

    • It is made by heating a mixture of silica, soda ash, and lime

    • It can be molded into various shapes and sizes

    • It is used in windows, mirrors, lenses, and containers

    • Different types of glass include tempered, laminated, and stained glass

  • Answered by AI
  • Q3. What is graphene
  • Ans. 

    Graphene is a thin layer of pure carbon arranged in a hexagonal lattice.

    • It is the thinnest material known to man

    • It is a good conductor of electricity and heat

    • It is incredibly strong and flexible

    • It has potential applications in electronics, energy, and medicine

  • Answered by AI
  • Q4. What is your expectations

Interview Preparation Tips

Interview preparation tips for other job seekers - Talk about the topic wher you are good at

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Nvh basics,modal analysis
Round 2 - Technical 

(1 Question)

  • Q1. Nvh basics,modal analysis,spring mass damper

Interview Preparation Tips

Interview preparation tips for other job seekers - You can able to explain what u have done in earlier company. Prepare basics and be confident
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. What is minimum gap between two structures for seismic point of view
  • Ans. 

    Minimum gap between two structures for seismic point of view is typically around 1.5 times the height of the taller structure.

    • Minimum gap is usually 1.5 times the height of the taller structure to reduce seismic interaction.

    • This gap helps prevent collision or structural damage during an earthquake.

    • Building codes and regulations may specify minimum gaps for seismic safety.

    • Example: If one building is 100 feet tall, the m...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Read all codes well
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Prepare basics properly before going for interview, they mostly ask less questions with more depth.
  • Q2. Draw BMD for sway frame.
  • Ans. 

    BMD for sway frame is a diagram showing the variation of bending moment along the length of the frame.

    • BMD for sway frame will have a shape similar to a zigzag pattern due to the presence of sway in the frame.

    • The bending moment will be maximum at the points where the frame experiences maximum sway.

    • The BMD can be drawn by analyzing the internal forces and moments acting on the frame.

  • Answered by AI
Round 3 - One-on-one 

(3 Questions)

  • Q1. Draw piperack elevations
  • Ans. 

    Drawing piperack elevations involves creating detailed drawings of the structure from different viewpoints.

    • Start by determining the dimensions and layout of the piperack

    • Use software like AutoCAD to create accurate and detailed drawings

    • Include all necessary details such as pipe sizes, supports, and connections

    • Label all components clearly for easy understanding

    • Review and revise the drawings as needed for accuracy

  • Answered by AI
  • Q2. Anchor bolt design
  • Q3. Base plate design
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
No response
Round 1 - Technical 

(5 Questions)

  • Q1. About current projects. And more about seismic/ wind loads
  • Q2. How to perform RSM method ?
  • Ans. 

    Response Surface Methodology (RSM) is a statistical technique used to model and analyze the relationship between a response variable and multiple input variables.

    • Design a set of experiments based on a factorial design

    • Collect data from the experiments

    • Fit a regression model to the data

    • Analyze the model to determine optimal input settings for the response variable

  • Answered by AI
  • Q3. Soil test report
  • Q4. Foundation uplift
  • Q5. Connection design
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Whate are different bus bar schemes?
  • Ans. 

    Bus bar schemes are different ways of connecting bus bars in power systems.

    • Single bus bar scheme

    • Double bus bar scheme

    • Main and transfer bus bar scheme

    • Ring bus bar scheme

    • Breaker and a half scheme

    • Mesh bus bar scheme

  • Answered by AI
  • Q2. What are the equipment sequence for any line bay?
  • Ans. 

    The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.

    • The circuit breaker is the first equipment in the sequence.

    • Next comes the isolator switch.

    • After that, the earth switch is operated.

    • Then the line disconnector is opened.

    • Finally, the transformer is disconnected from the line.

    • The sequence is reversed when the line bay is put back into service.

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. What you want to leave your current organization?
  • Q2. Are you comfortable to relocate to another city?

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be prepare about possible questions and be confident while giving interview
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Oct 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About yourself and experience
Round 3 - One-on-one 

(1 Question)

  • Q1. Personal interview and technical
Round 4 - HR 

(1 Question)

  • Q1. Salary discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Take good knowledge about your work,good personal skills
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2023. There were 2 interview rounds.

Round 1 - One-on-one 

(1 Question)

  • Q1. About the projects and Transmission
Round 2 - One-on-one 

(1 Question)

  • Q1. Technical and stack up analysis

Interview Preparation Tips

Interview preparation tips for other job seekers - Be bold and answer precisely
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Which column takes more load short or Long Column
  • Q2. What kind of pressures will impose on the water tank walls during seismic

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared with fundamentals
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Offshore basics and platforms

Interview Preparation Tips

Interview preparation tips for other job seekers - NORSOK ALL STANDARDS FAMILIRIZATION

Saint-Gobain Interview FAQs

How to prepare for Saint-Gobain Senior Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Saint-Gobain. The most common topics and skills that interviewers at Saint-Gobain expect are Process Development, Process Engineering and ceramics.
What are the top questions asked in Saint-Gobain Senior Engineer interview?

Some of the top questions asked at the Saint-Gobain Senior Engineer interview -

  1. What is gl...read more
  2. What is graph...read more

Tell us how to improve this page.

Saint-Gobain Senior Engineer Salary
based on 25 salaries
₹6.3 L/yr - ₹12.5 L/yr
7% less than the average Senior Engineer Salary in India
View more details

Saint-Gobain Senior Engineer Reviews and Ratings

based on 8 reviews

4.2/5

Rating in categories

4.3

Skill development

3.4

Work-life balance

4.1

Salary

4.3

Job security

4.3

Company culture

3.8

Promotions

3.9

Work satisfaction

Explore 8 Reviews and Ratings
Team Member
508 salaries
unlock blur

₹1.2 L/yr - ₹7.9 L/yr

Software Engineer
198 salaries
unlock blur

₹3 L/yr - ₹11.7 L/yr

Key Account Manager
173 salaries
unlock blur

₹6.2 L/yr - ₹17.5 L/yr

Senior Software Engineer
159 salaries
unlock blur

₹6.5 L/yr - ₹24 L/yr

Production Engineer
148 salaries
unlock blur

₹2.5 L/yr - ₹10.5 L/yr

Explore more salaries
Compare Saint-Gobain with

Asahi India Glass

3.9
Compare

Hindustan Unilever

4.2
Compare

Asian Paints

4.0
Compare

Berger Paints

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview