i
Saint-Gobain
Filter interviews by
My career goal is to become a successful Key Account Manager by consistently exceeding sales targets and building strong relationships with clients.
To consistently exceed sales targets and increase revenue for the company
To build strong and lasting relationships with clients by providing excellent customer service and support
To continuously improve my skills and knowledge in sales and account management
To eventually ta...
I applied via Naukri.com and was interviewed before Sep 2022. There were 2 interview rounds.
I would assess the reasons for inactivity, re-engage with personalized communication, offer incentives, and set up regular follow-ups.
Identify reasons for inactivity (e.g. lack of communication, change in needs)
Reach out with personalized communication to re-engage (e.g. tailored emails, phone calls)
Offer incentives to encourage activity (e.g. discounts, special promotions)
Set up regular follow-ups to maintain engageme...
What people are saying about Saint-Gobain
I applied via Referral and was interviewed in Oct 2021. There was 1 interview round.
I applied via Referral and was interviewed before Jul 2022. There were 2 interview rounds.
It was around 10 minutes long and questioning was about Civil structures related as Bending moment etc.
Google Sheets is a cloud-based spreadsheet program offered by Google as part of the Google Drive office suite.
Allows users to create and edit spreadsheets online
Offers collaboration features for real-time editing and commenting
Can import and export various file formats, including Microsoft Excel
Offers add-ons and scripts for automation and customization
Accessible from any device with internet connection
MDD & OMC are important parameters for soil compaction and moisture content.
MDD stands for Maximum Dry Density, which is the maximum density that can be achieved for a given soil compaction effort.
OMC stands for Optimum Moisture Content, which is the moisture content at which the maximum dry density can be achieved.
These parameters are important for determining the appropriate moisture content and compaction effort for...
The velocity of steel varies depending on the type and conditions.
The velocity of steel can range from 5000 to 6000 meters per second
The velocity of steel can be affected by factors such as temperature and pressure
The velocity of steel is important in industries such as construction and manufacturing
The cube test result in 7 days depends on the purpose of the test and the specific cube being tested.
The cube test can refer to various tests in different fields such as construction, engineering, and materials science.
For example, in construction, the cube test is used to determine the compressive strength of concrete cubes after 7 days of curing.
The result of the cube test can vary depending on factors such as the ty...
posted on 12 Sep 2024
I am a passionate software developer with experience in Java, Python, and web development.
Experienced in Java, Python, and web development technologies
Strong problem-solving skills
Familiar with Agile methodologies
Worked on projects involving database management systems
Continuous learner and always looking to improve
Arbitration in CAN is a process of resolving conflicts when multiple nodes try to transmit data simultaneously.
Arbitration is used in Controller Area Network (CAN) to ensure that only one node transmits data at a time.
Each node on the CAN bus has a unique identifier, and the node with the highest priority identifier gets to transmit its data first.
If two or more nodes try to transmit data at the same time, the arbitrat...
posted on 3 Mar 2025
1hour,Time and Speed,Time and work
1 hour,Data Structure
based on 3 interviews
Interview experience
based on 32 reviews
Rating in categories
Team Member
522
salaries
| ₹1.4 L/yr - ₹7.9 L/yr |
Software Engineer
171
salaries
| ₹3 L/yr - ₹11.9 L/yr |
Senior Software Engineer
167
salaries
| ₹6.5 L/yr - ₹24.1 L/yr |
Key Account Manager
161
salaries
| ₹5.4 L/yr - ₹18 L/yr |
Production Engineer
155
salaries
| ₹1 L/yr - ₹11 L/yr |
Tata Projects
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company