i
Saint-Gobain
Filter interviews by
I applied via Campus Placement
I applied via Campus Placement
I appeared for an interview before Mar 2016.
Heat and light sensors can be strategically placed in a room with a glass facade to ensure accurate readings.
Place heat sensors away from direct sunlight to avoid false readings.
Position light sensors in areas that receive direct sunlight to measure the intensity accurately.
Consider placing sensors at different heights to capture variations in temperature and light levels.
Ensure sensors are not obstructed by furniture ...
A best-fit curve is a mathematical function that represents the closest approximation to a set of data points.
A best-fit curve is used to model the relationship between variables in a dataset.
It is often used in research and development to analyze and predict trends.
The curve is determined by minimizing the overall distance between the curve and the data points.
Different types of curves can be used, such as linear, pol...
Deriving the line equation using end constraints
To derive the line equation, we need two points on the line
The end constraints provide the limits for the line
Using the limits, we can determine the coordinates of the two points
Once we have the points, we can calculate the slope and y-intercept of the line
Finally, we can write the line equation in the form y = mx + b
Various sensors can be used to collect heat and light based data, such as thermocouples, infrared sensors, and photodiodes.
Thermocouples are commonly used to measure temperature by detecting changes in voltage.
Infrared sensors can detect heat radiation and are used in applications like temperature monitoring and motion detection.
Photodiodes are light sensors that convert light energy into electrical current and are use...
Top trending discussions
Google Sheets is a cloud-based spreadsheet program offered by Google as part of the Google Drive office suite.
Allows users to create and edit spreadsheets online
Offers collaboration features for real-time editing and commenting
Can import and export various file formats, including Microsoft Excel
Offers add-ons and scripts for automation and customization
Accessible from any device with internet connection
MDD & OMC are important parameters for soil compaction and moisture content.
MDD stands for Maximum Dry Density, which is the maximum density that can be achieved for a given soil compaction effort.
OMC stands for Optimum Moisture Content, which is the moisture content at which the maximum dry density can be achieved.
These parameters are important for determining the appropriate moisture content and compaction effort for...
The velocity of steel varies depending on the type and conditions.
The velocity of steel can range from 5000 to 6000 meters per second
The velocity of steel can be affected by factors such as temperature and pressure
The velocity of steel is important in industries such as construction and manufacturing
The cube test result in 7 days depends on the purpose of the test and the specific cube being tested.
The cube test can refer to various tests in different fields such as construction, engineering, and materials science.
For example, in construction, the cube test is used to determine the compressive strength of concrete cubes after 7 days of curing.
The result of the cube test can vary depending on factors such as the ty...
3 candidate was their vs 1 opening
I applied via Walk-in and was interviewed in Nov 2023. There was 1 interview round.
I applied via Referral and was interviewed before Sep 2022. There were 2 interview rounds.
Medium tough level test, strong basics required in all fields of civil.
A float can be made zero in critical path tasks by reducing the duration of non-critical tasks.
Identify non-critical tasks that have float
Shorten the duration of non-critical tasks to eliminate float
Focus on tasks that have the highest float value to reduce overall project duration
Baseline schedule is the original planned schedule for a project, used as a reference point for tracking progress.
Baseline schedule is created at the beginning of a project to establish the original plan for project activities and timelines.
It serves as a benchmark for comparing actual progress and identifying deviations from the original plan.
Changes to the baseline schedule may require formal approval and documentati...
I applied via Campus Placement and was interviewed before Apr 2023. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Apr 2022. There were 2 interview rounds.
Some of the top questions asked at the Saint-Gobain Research and Development interview -
based on 1 review
Rating in categories
Team Member
526
salaries
| ₹1.4 L/yr - ₹8.3 L/yr |
Key Account Manager
176
salaries
| ₹5.4 L/yr - ₹18 L/yr |
Software Engineer
172
salaries
| ₹3 L/yr - ₹11.4 L/yr |
Senior Software Engineer
168
salaries
| ₹6.5 L/yr - ₹24.1 L/yr |
Production Engineer
155
salaries
| ₹1 L/yr - ₹11 L/yr |
Tata Projects
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company