Arabian Construction Company Interview Questions, Process, and Tips

Updated 12 Feb 2025

Top Arabian Construction Company Interview Questions and Answers

View all 16 questions

Arabian Construction Company Interview Experiences

Popular Designations

17 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jun 2024. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Tell me about something you.
  • Q2. Salary expectations about current
Round 2 - Technical 

(3 Questions)

  • Q1. Mivan shuttering cycle process
  • Q2. Bar bending shedule
  • Q3. About site and general material density test. Quality testing of cement, sand, steel
Round 3 - HR 

(1 Question)

  • Q1. HR will call you within 2 days

Executive Engineer Interview Questions asked at other Companies

Q1. Question 1: What is memory leak? Question 2: What is static variable in C? with program Question 3: What are local variable and global variables? and their default values and program Question 4: What is method overriding? with program
View answer (1)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Oct 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Reinforcement bbs making as per drawings
  • Ans. 

    Reinforcement bars should be cut and bent as per the drawings provided for construction purposes.

    • Reinforcement bars should be cut to the required length as specified in the drawings

    • Bend the bars to the specified angles and shapes according to the drawings

    • Ensure accurate placement and spacing of the reinforcement bars as per the drawings

    • Use appropriate tools and equipment for cutting and bending the reinforcement bars

    • Ch...

  • Answered by AI
  • Q2. As per drawings bbs making
  • Q3. Reinforcement of joob
  • Ans. 

    Reinforcement of job refers to providing positive feedback and rewards to employees for their good performance.

    • Reinforcement of job can include verbal praise, bonuses, promotions, or other incentives.

    • It helps in motivating employees to continue performing well and increases job satisfaction.

    • Examples of reinforcement of job can be employee of the month awards, performance bonuses, or recognition programs.

  • Answered by AI
  • Q4. Steel cutting, stiruup cutting length, 4leg size making,
  • Q5. Steel weight calculation

Interview Preparation Tips

Interview preparation tips for other job seekers - I am steel reinforcement supervisor.

Reinforcement Supervisor Interview Questions asked at other Companies

Q1. Reinforcement bbs making as per drawings
View answer (2)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Jul 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Medical laboratory technician
  • Q2. Hematology, Blood Bank, Biochemistry, Immunology, Serology,, microbiology
  • Q3. I passed Oman promatic exam79% I passed Qatar promatic exam 62%
  • Q4. Hematology Blood Bank 🩸
Round 3 - Technical 

(3 Questions)

  • Q1. Blood Bank Hematology
  • Q2. Biochemistry Immunology
  • Q3. Blood Bank 🩸 Hematology
Round 4 - Technical 

(1 Question)

  • Q1. Biochemistry Immunology

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes 💯
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Basic excell questions

Document Controller Interview Questions asked at other Companies

Q1. How many Engineering Documents will be process if you handle EPC project?
View answer (4)

Arabian Construction Company interview questions for popular designations

 Project Coordinator

 (2)

 Senior Engineer

 (2)

 Accounting Administrator

 (1)

 Billing Quantity Surveyor and Engineer

 (1)

 Document Controller

 (1)

 Engineer

 (1)

 Executive Engineer

 (1)

 Junior Engineer

 (1)

Accounting Administrator Interview Questions & Answers

user image Sandeepkumar Gosikonda

posted on 12 Feb 2025

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Feb 2024.

Round 1 - Assignment 

Accounting Standards and Entries

Round 2 - One-on-one 

(2 Questions)

  • Q1. Interview with Manager
  • Q2. What's your salary expectations

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well what you studied

Get interview-ready with Top Arabian Construction Company Interview Questions

Senior Engineer Interview Questions & Answers

user image Shalendra Saxena

posted on 23 Apr 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Oct 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About yourself and experience
Round 3 - One-on-one 

(1 Question)

  • Q1. Personal interview and technical
Round 4 - HR 

(1 Question)

  • Q1. Salary discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Take good knowledge about your work,good personal skills

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (54)

I applied via Referral and was interviewed in Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Interviewed on conventional, Mivan & Droppex shuttering system, safety clauses, quality issues, planning and man power Management system only
  • Q2. How you controlled the projects if labours are going to strikes?
  • Ans. 

    I would prioritize communication with the labor union and work towards finding a resolution while also adjusting project timelines and resources.

    • Establish open communication with the labor union to understand their concerns and negotiate a solution

    • Assess the impact of the strike on the project timeline and adjust accordingly

    • Explore alternative resources or outsourcing options to mitigate the impact of the strike

    • Ensure ...

  • Answered by AI
  • Q3. How you prepared cost controlled system?
  • Ans. 

    I prepared a cost controlled system by implementing budget tracking tools and regularly reviewing expenses.

    • Implemented budget tracking tools to monitor expenses

    • Regularly reviewed expenses to identify areas for cost savings

    • Established clear budget guidelines and communicated them to team members

    • Negotiated with vendors to secure better pricing

    • Implemented cost-saving measures such as energy-efficient equipment or remote w...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Salary with time of join only. Conveyence by Air @ cost of company

Interview Preparation Tips

Interview preparation tips for other job seekers - Please be firm about your required salary, facilities and your conveyence + leave & other HR rules

Top Arabian Construction Company Project Coordinator Interview Questions and Answers

Q1. What about Mivan shuttering, why preferred mivan in place of commercial shuttering work?
View answer (2)

Project Coordinator Interview Questions asked at other Companies

Q1. What kind of water proofing application are used on terrace roof slab of the commercial, residential buildings
View answer (6)

I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(8 Questions)

  • Q1. What about Mivan shuttering, why preferred mivan in place of commercial shuttering work?
  • Ans. 

    Mivan shuttering is preferred over commercial shuttering work due to its advantages in terms of speed, cost-effectiveness, and quality.

    • Mivan shuttering is a fast-paced construction technique that uses aluminum formwork instead of traditional timber formwork.

    • It allows for rapid construction, reducing the overall project duration.

    • Mivan shuttering is highly cost-effective as it requires less labor and material compared to...

  • Answered by AI
  • Q2. How many carpenter and fitter will provide for 4 cycle of slab area 15000sqm
  • Ans. 

    The number of carpenters and fitters required for 4 cycles of slab area 15000sqm depends on the project timeline and complexity.

    • The number of carpenters and fitters required will depend on the project timeline and complexity.

    • The size of the slab area is not the only factor to consider when determining the number of carpenters and fitters needed.

    • Other factors to consider include the type of materials being used, the des...

  • Answered by AI
  • Q3. What will be rate for carpenter and fitter for commercial and mivan or Dropex shuttering work?
  • Ans. 

    The rate for carpenter and fitter for commercial and Mivan or Dropex shuttering work varies depending on factors such as location, experience, and project requirements.

    • The rate for carpenters and fitters can vary significantly based on the location of the project. Rates may be higher in urban areas compared to rural areas.

    • Experience level also plays a role in determining the rate. Highly skilled and experienced carpent...

  • Answered by AI
  • Q4. How you control total safety?
  • Ans. 

    Total safety is controlled through a combination of risk assessments, safety protocols, training, and continuous monitoring.

    • Conduct regular risk assessments to identify potential hazards and implement appropriate safety measures

    • Develop and enforce safety protocols and procedures for all activities

    • Provide comprehensive training to all employees on safety procedures and emergency response

    • Continuously monitor and evaluate...

  • Answered by AI
  • Q5. What is your quality plan?
  • Ans. 

    My quality plan involves ensuring that all project deliverables meet or exceed customer expectations.

    • Establishing clear quality standards and metrics

    • Regularly monitoring and measuring project progress against these standards

    • Identifying and addressing any quality issues as soon as they arise

    • Ensuring that all team members are trained and equipped to deliver high-quality work

    • Continuously improving processes and procedures...

  • Answered by AI
  • Q6. How long team was work under you? How you monitoring all six projects at a time?
  • Q7. What do you mean Administration for project?
  • Q8. What your think about cost control? What is your organogram?
  • Ans. 

    Cost control is essential for successful project management. Organogram helps in defining roles and responsibilities.

    • Cost control involves monitoring and managing project expenses to ensure they stay within the budget.

    • It requires identifying potential cost overruns and taking corrective actions to prevent them.

    • Organogram is a visual representation of the project team structure, showing the hierarchy of roles and respon...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Think first and give your answer with cool brain. Focus on safety, quality and time shedule.

Top Arabian Construction Company Project Coordinator Interview Questions and Answers

Q1. What about Mivan shuttering, why preferred mivan in place of commercial shuttering work?
View answer (2)

Project Coordinator Interview Questions asked at other Companies

Q1. What kind of water proofing application are used on terrace roof slab of the commercial, residential buildings
View answer (6)

I applied via Approached by Company and was interviewed in Mar 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Tendering clause are mostly used for Client Billing
  • Q2. Cost control, Budgeting
Round 3 - One-on-one 

(2 Questions)

  • Q1. What is rate analysis
  • Ans. 

    Rate analysis is the process of determining the rates of various items of work involved in a construction project.

    • It involves analyzing the cost of materials, labor, and equipment required for a particular task

    • It helps in estimating the total cost of a project

    • It is used to prepare a detailed bill of quantities for a project

    • It is important for accurate budgeting and cost control

    • Example: Rate analysis for the constructio...

  • Answered by AI
  • Q2. What is document required for estimation
  • Ans. 

    Documents required for estimation include drawings, specifications, bills of quantities, and site survey reports.

    • Drawings: architectural, structural, mechanical, electrical, plumbing, etc.

    • Specifications: detailed descriptions of materials, finishes, and workmanship

    • Bills of quantities: detailed list of all materials and quantities required for the project

    • Site survey reports: information about site conditions, soil type,

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Arabian Construction Company Billing Quantity Surveyor and Engineer interview:
  • Tender clause
  • IS code
Interview preparation tips for other job seekers - IS & CPWD and tender clause is most important for billing engineer

Billing Quantity Surveyor and Engineer Interview Questions asked at other Companies

Q1. What is document required for estimation
View answer (1)

I applied via LinkedIn and was interviewed in Jul 2022. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. 1. what is form form of DMC pile. 2. Helicle making formula 3 . Lap length and development length. 4 . Slump test. 5. Cube test. 6. Joggles provided of lap h/v ratio. 6. Bend deductions for stirrup.
  • Ans. 

    Questions related to civil engineering including pile forms, helicle making formula, lap and development length, slump and cube tests, joggles, and bend deductions for stirrup.

    • DMC pile can be circular, square, or rectangular in shape

    • Helicle making formula involves calculating the pitch, diameter, and number of blades for the helix

    • Lap length is the length of overlap between two reinforcing bars in a concrete structure

    • De...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare about basic things and good knowledge on experience.

Junior Engineer Interview Questions asked at other Companies

Q1. What is the main role of Junior engineer in Electrical maintenance and How to provide the company facilities ?
View answer (25)

Arabian Construction Company Interview FAQs

How many rounds are there in Arabian Construction Company interview?
Arabian Construction Company interview process usually has 2-3 rounds. The most common rounds in the Arabian Construction Company interview process are Technical, Resume Shortlist and HR.
What are the top questions asked in Arabian Construction Company interview?

Some of the top questions asked at the Arabian Construction Company interview -

  1. What about Mivan shuttering, why preferred mivan in place of commercial shutter...read more
  2. What will be rate for carpenter and fitter for commercial and mivan or Dropex s...read more
  3. 1. what is form form of DMC pile. 2. Helicle making formula 3 . Lap length and...read more
How long is the Arabian Construction Company interview process?

The duration of Arabian Construction Company interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Arabian Construction Company Interview Process

based on 10 interviews

Interview experience

4.9
  
Excellent
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 420 Interviews
GMR Group Interview Questions
4.1
 • 80 Interviews
GAMMON INDIA Interview Questions
3.9
 • 29 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

Arabian Construction Company Reviews and Ratings

based on 231 reviews

3.5/5

Rating in categories

3.3

Skill development

3.2

Work-life balance

3.1

Salary

3.0

Job security

3.1

Company culture

2.9

Promotions

3.0

Work satisfaction

Explore 231 Reviews and Ratings
Senior Engineer
27 salaries
unlock blur

₹4.4 L/yr - ₹9.8 L/yr

Civil Engineer
23 salaries
unlock blur

₹3.2 L/yr - ₹5.8 L/yr

Junior Engineer Civil
18 salaries
unlock blur

₹1.5 L/yr - ₹3.8 L/yr

Senior Civil Engineer
17 salaries
unlock blur

₹4.8 L/yr - ₹8.4 L/yr

Civil Site Engineer
16 salaries
unlock blur

₹1 L/yr - ₹6.3 L/yr

Explore more salaries
Compare Arabian Construction Company with

Larsen & Toubro Limited

4.0
Compare

Shapoorji Pallonji Group

4.1
Compare

Tata Projects

4.2
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview