Upload Button Icon Add office photos

Filter interviews by

Clear (1)

Arabian Construction Company Document Controller Interview Questions and Answers

Updated 7 May 2024

Arabian Construction Company Document Controller Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and answer the Interviewer with to the point
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-

I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. NEUTRAL AXIS IN RCC STRUCTURE
  • Ans. 

    The neutral axis is the line where the stress is zero in a reinforced concrete structure.

    • The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.

    • The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.

    • The position of the neutral axis affects the amount of reinforcement required in the tension zone.

    • The n...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - GRT TO WORK WITH THIS COMPANY

I applied via LinkedIn and was interviewed in May 2022. There were 3 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Face interview with confidence. Interview process is very simple.

I applied via Referral and was interviewed in Nov 2021. There were 2 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good organization feeling positive toward the company
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before May 2022. There were 2 interview rounds.

I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Concrete rate breakup, Asking rate
  • Q2. Unique thumbrules breakup and unit conversion

Interview Preparation Tips

Interview preparation tips for other job seekers - I explained the concrete breakup with the margin of sub contractor, also explain the subcontractor unit rate breakup and Asking rate is anything like in cricket how many balla are remaining and how much u need to score more. Like.

Joining in L&T is my (No) for evey civil engineers dream..
Thumbrules break up
Rebar - (D2/162) ----(Area x Lengh x 7850).
Like

I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Asked about To mentioned areas of weakness of L&T, or needs improvement?
  • Q2. How to make check or maintain elevation of Underground Piping.
  • Ans. 

    Maintain elevation of underground piping by using level instruments and proper installation techniques.

    • Use a level instrument to check the elevation of the piping during installation.

    • Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.

    • Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.

    • Consider using supports o...

  • Answered by AI
  • Q3. My Job specific role & responsibility, in previous organisation.
  • Ans. 

    In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.

    • Managed a team of employees and delegated tasks effectively

    • Handled customer complaints and resolved issues in a timely manner

    • Created and implemented strategies to improve efficiency and productivity

    • Collaborated with other departments to achieve company goals

    • Conducted performanc

  • Answered by AI
  • Q4. Welding Electrodes for different materials.
  • Ans. 

    Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.

    • Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.

    • Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.

    • Cast iron electrodes have a high nickel content to prevent cracking.

    • Aluminum electrodes have a special coating ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just Be confidant, Be Humble, Be aware about your roles & Responsibility during job Period.

Interview Questionnaire 

2 Questions

  • Q1. The question was regarding the present role I'm assigned and how the implementation of scheduling tools can help planning of E.P.C. in their present business unit.
  • Q2. Technical question on my present project scheduling role & any other digital concept i'm associated with it currently.

Interview Preparation Tips

Round: Resume Shortlist
Experience: These days, not many companies shortlists the candidates by themselves instead they hire third parties in order to minimize the resources and cost burden. These talent acquisition members initially filters the resumes based upon the Years of Experience & the key skills which they receive from their parent companies by matching with the 70-80 % kind of similar roles of the candidates.

In my case, both my experience & roles are perfectly in sync with their requirements. So, they contacted me via naukri.com and asked me to share the updated resume & within a week I got the confirmation of my resume shortlisting & date for the 1st round of interview.

Round: Test
Experience: Primavera Scheduling Test

Contribute & help others!
anonymous
You can choose to be anonymous

Arabian Construction Company Interview FAQs

How many rounds are there in Arabian Construction Company Document Controller interview?
Arabian Construction Company interview process usually has 1 rounds. The most common rounds in the Arabian Construction Company interview process are Technical.

Recently Viewed

INTERVIEWS

Arabian Construction Company

No Interviews

SALARIES

Calsonic Kansei Motherson Auto Products

INTERVIEWS

Larsen & Toubro Limited

No Interviews

SALARIES

Calsonic Kansei Motherson Auto Products

INTERVIEWS

insightsoftware

No Interviews

INTERVIEWS

Arabian Construction Company

No Interviews

SALARIES

TEOCO Software

INTERVIEWS

Arabian Construction Company

No Interviews

SALARIES

NTT DATA, Inc.

INTERVIEWS

Arabian Construction Company

No Interviews

Tell us how to improve this page.

Arabian Construction Company Document Controller Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Arabian Construction Company Document Controller Reviews and Ratings

based on 2 reviews

4.7/5

Rating in categories

4.7

Skill development

4.7

Work-life balance

4.7

Salary

4.7

Job security

4.7

Company culture

4.7

Promotions

4.7

Work satisfaction

Explore 2 Reviews and Ratings
Senior Engineer
27 salaries
unlock blur

₹4.4 L/yr - ₹9.8 L/yr

Civil Engineer
22 salaries
unlock blur

₹3.2 L/yr - ₹5.8 L/yr

Junior Engineer Civil
18 salaries
unlock blur

₹1.5 L/yr - ₹3.8 L/yr

Senior Civil Engineer
17 salaries
unlock blur

₹4.8 L/yr - ₹8.4 L/yr

Civil Site Engineer
17 salaries
unlock blur

₹1.5 L/yr - ₹5.8 L/yr

Explore more salaries
Compare Arabian Construction Company with

Larsen & Toubro Limited

4.0
Compare

Shapoorji Pallonji Group

4.1
Compare

Tata Projects

4.2
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview